Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.

Slides:



Advertisements
Similar presentations
Electric Bus Management System
Advertisements

Plate Mounting Minimise press downtime Latest developments in mounting.
Stair Climbing Robot Team 7 Senior Design Project Dalhousie University Dept. of Mechanical Engineering Fall 2008.
Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
Unit Eight Check Valves, Cylinders, and Motors
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Optical Manufacturing Solutions 1 Probe Assembly.
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
FIRST Pneumatics Team 1425 Wilsonville Robotics. Agenda Components Components Basic System Design Basic System Design Applications Applications Tricks.
Pulleys Vanderbilt Student Volunteers for Science Fall, 2010 Training Refresher.
Conceptual Design Presentation ME 4182 Team: Guys Engineering Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
3 Communicating Design Ideas © Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only. Objectives Explain the three basic.
EASELECTRIC Team 4 Adam Frank Jackie Jon. Introduction NSF Program: Expanding world of disabled artists Growing demand for adjustable easels Disabilities.
MARK BECKMAN JON BROCK ERIK VAN KAMPEN TYLER WIERS TEAM 8 ATLAS|LIFT grip it ‘n flip it.
A Sled System for Motor Vehicle Crash Simulation and Forensic Biomechanics Group Members: Joshua Booren Travis Deason Steve Savas Max Brunhart Customer:
Sandia M.A.S.T. Miniature Automated Shock Tester TEAM PICTURE HERE Nicholai Olson, Cameron Hjeltness, Travis Nebeker, Michael Brewster, Fernando De La.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
OUR MISSION Create a variable pressure fuser that can produce low grade images. Be able to vary the current produced by the fuser Allow for fuser speed.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Fiber Repositioning System NanoDrop December 11, 2006 Chris Czech Charles Dielmann Mark Howe Dana Kimpton Christopher Sherman.
Team: Derek Arnold Lawrence Derdzinski Athanasios Gkourlias Amber Mescher Chris Sangster Timothy Gallman Faculty Mentor: Dr. Ferat Sahin Sponsor: Getinge.
Conceptual Design Review Senior Design University of Idaho College of Engineering.
P08211 – 5-minute Commercial DPM Student - Shadle Stewart Final Period - 11/12/07.
Conceptual Design Review Senior Design
General idea of a couple of check rod system and adjustments
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
2 Lines Electronics I 2 C Analyzer Ching-Yen Beh Robert S. Stookey Advisor: Dr. J. W. Bruce.
Inclined Plane Vanderbilt Student Volunteers for Science Fall 2013 Training Presentation.
National Institute Of Science & Technology GPIB Controllers Ashutosh Pradhan 1 EI DECEMBER-2004 GPIB CONTROLLERS Technical Seminar Presented By.
IPD Technical Conference February 19 th 2008 Cable Disk Inspection.
Transmission Oil Pump Audit Test Stand Project Overview.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
VEX Parts - Motion Robotics – 8.
Group #16 Equipment Design: Pultrusion Machine Team Members Benji Parks Brent Langille Kurtis Gillis Mark MacIsaac Matt Swinkels Supervisors Dr. A. Kalamkarov.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech University.
Department of Electrical and Computer Engineering The Tektronix MSO4000 series of oscilloscopes are mixed-signal oscilloscopes that contain both digital.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
M E T ROVER MSCD Engineering Technology Critical Design Review Metropolitan State College of Denver April 2004.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
William Enns Bray, Mitch Sharpe, Mike Kryski, Andrew Mattson, Nicole Marshall, Ashton Johnson Sponsor: Dr. Bertram Design Review 1.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
UPGRADING MEMORY BY : tuan mohd fariz.  Choosing and Installing Memory.
Warlocks 8/5/05 TMU Pneumatics on Robots u Simplified model Compressed Air Tank Geek Safety Glasses 60 lbs Pneumatic Cylinder Whoa! That’s a lot of force.
Automatic Weightlifting Spotter Mid Semester Presentation Senior Design I February 27, 2014.
Mark Randall & Kevin Claycomb Faculty Advisor: David Mitchell Industrial Sponsor: IEEE.
The Journey to a West Coast Drivetrain
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
CTCT 3D Paving Training 3D UI, Configuration & Use March 2010 Phil Jackson CTCT Training Manager.
SS5305 – Popular Marker Setups 1. Objectives Marker Data Measurement Sequence Project Automation Framework (PAF) Popular marker setups PAF Interface 2.
Mechanical Design General Concepts AHL Topic 10. Mechanical advantage This is the factor by which a machine multiplies the force put into it. Velocity.
LINDSAY WILKENS CHRISTOPHER MOREHOUSE ERIC WILCOX MATT FIGLIOTTI JOHN KNIGHT R12300: ME Lab Hardware Development.
Marble Cake Process Improvement – Final Review Aaron Delahanty Arwen Sharp Benson Yu Kenyon Zitzka Ryan Norris.
What is a Mechanism? Two pieces of a machine where motion of one part causes the other part to move.
The Camera Control System. Ruth Ayalon - ME Erin Gillespie - ME Claudia Forero - ISE Jennifer Grant - EE Manny Maceda - EE Chris Nimon - EE Edward Yiu.
Mechanisms Mechanisms PLTW Gateway
SuperQuest Salem Arms – Best Practices.
Chapter 4 Mechanisms.
The perfect Machine tool for your first FINN-POWER
LARP Phase II Secondary Collimator RC1
Robot Soccer First Design Review
P08002-Automated Parallel Bars
Dial Calipers Dial Calipers
Lab4 Industrial pharmacy
Putting for Perfection
Linkages Lesson 4 – Linkages.
Presentation transcript:

Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical Advisors: Steve Beyerlein Mike Severance

Presentation Overview Customer Needs Mechanical Components Table Drop Design Orientation Devices Height Adjustment Electrical Components Data Acquisition CPU Interface Software Camera Costs Recommended Design Work Remaining Questions?

Needs Repeatable Impacts ( 45 +/- 5 deg) Adjustable Drop Height (18-60 inches) Portable (Wheels) Short Setup time (<1 min) Video Data Acquisition (automatically named and stored)

Mechanical Components Table Drop Design Orientation Devices Height Adjustment

Table Drop Design Using Pneumatics Fast Acceleration Simple Inexpensive Non Electrical Long Life

Table Drop Design #1 Frontside Pneumatic PROS One Pneumatic Four Linear Bearings CONS Table Only Rotates – Could Potentially Cause Slight Rotation On Dropped Objects No Initial Vertical Motion

Table Drop Design #1 Frontside Pneumatic

Table Drop Design #2 Backside Pneumatic PROS One Pneumatic Device Four Linear Bearings Pneumatic Does Not Interfere With Table Space CONS Table Only Rotates – Could Potentially Cause Slight Rotation On Dropped Objects No Initial Vertical Motion

Table Drop Design #2 Backside Pneumatic

Table Drop Design #3 Double Pneumatic PROS Vertical Pneumatic Prevents Rotation on Test Device CONS More Linear Bearings More Pneumatic Cylinders Increased Chance of System Malfunction

Table Drop Design #3 Double Pneumatic

Orientation Devices Cradle Block Design PROS Simple Block Design Inexpensive Simple Operation Minimal Setup Time Easily Removable CONS Works Best for Smaller Devices Additional Testing Required to Confirm Functionality

Orientation Device Design #1 Edge Testing

Orientation Device Design #2 Corner Testing

Height Adjustment Design #1 Manual Hand Crank Pros Smooth Adjustment For Any Height Able To Raise And Lower Heavier Loads. Cons Slow Adjustment Involved Manufacturing Process Increased Cost

Height Adjustment Design #1 Manual Hand Crank

Height Adjustment Design #2 Pin and Collar Pros Quick Adjustment Predetermined Standard Heights Secure Locking Mechanism Cons Operator Must Be Able To Support Weight Of Table And Mechanism

Height Adjustment Design #2 Pin and Collar

Electrical Components Data Acquisition CPU Interface Software Camera

Importing to a PC Video for each test will be imported to a PC by using GPIB interface. Instrument controlled by Labview. Automatically will name and store video clips for each test.

CPU Zero Footprint PC - $500 (w/o monitor) LCD PC - $1000

GPIB Interface General Purpose Interface Bus Standard interface between instruments and controllers from various vendors. 8-bit parallel communication. 5 bus management lines (ATN, EOI, IFC, REN, & SRQ) 3 handshaking lines. 8 ground lines.

LabVIEW Software Uses VI’s (Virtual Instrumentation) Imitates physical instruments. Cheaper than Hardware. Modular Program design. Will be used with GPIB to control the video.

Video Camera Handheld will fall in about 0.5 seconds Video below 200 fps may be able to capture enough images Acquisition (fps) Distance between images 192½ inch 961 inch 482 inches

Camera Option #1 Machine Vision System Pros High Speed Acquisition (>10000 fps) Cons Small Picture Area (1.5” x 1.25”) Designed as an Automatic Inspection Sensor Doesn’t capture video

Camera Option #2 High Speed Video Camera Pros Easily interfaced and controlled with LabVIEW software Could be tested with lower quality cameras Cons High Cost Low Acquisition Speeds (< 500 fps)

Mechanical Costs Pneumatic Cylinder (1-3) $50ea Shafts (1-2)$40ea Raw Materials Sheet Metal$70 Metal Tubing$20 Misc. Hardware$60 Linear Bearings (2-6)$60ea Spur Gear and Rack$200 Valves and Fittings $100 Compressor (Optional)$300 Total~$1400

Electrical Costs Computer~$1500 GPIB$300 Misc.$200 Camera~$800

Recommended Design Single Pneumatic Operation (Back Side) Track Mounted Block Orientation Device Pin and Collar Height Adjustment LCD PC or Laptop GPIB Interface LabVIEW Software

Work Remaining Spring 2006 Detail Design: (Jan. 9 th 2006 – Feb. 1 st 2006) - Order parts. - Assess Drawing package. - Complete drawing package. Fabrication: (Feb 2 nd 2006 – March 20 th 2006) - Build product. Validation: (March 21 st 2006 – April 20 th 2006) - Debug and fix product. - Validate performance of product. - Draft final project report. Delivery: (April 21 st 2006 – May 9 th 2006) - Archive project documentation. - Deliver product. - Write final report.

Our Questions for Itron Will ~200 fps be enough for the video? Computer? Camera? GPIB? Labview license?

Questions?