1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009.

Slides:



Advertisements
Similar presentations
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Advertisements

HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Property-Carrying Vehicles
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
DRIs After 360. Transportation Methodology § (7) PREAPPLICATION PROCEDURES.— The levels of service required in the transportation methodology shall.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
1 Financing Transportation Improvements Issues and Options Transportation Strategy Board November 17, 2010.
Multi-Modal Concurrency PSRC TRAC-UW Depart of Urban Design and Planning Evans School.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Downtown Parking Study City of Meriden Prepared by Fuss & O’Neill.
CALTRANS WIRELESS LICENSING PROGRAM Bimla G. Rhinehart Division of Right of Way and Land Surveys.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Proposed Governing Document Revision Updated April, 2011.
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
February 24, 2015 First Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15 
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
SKAGIT-ISLAND HSTP Skagit-Island HSTP Committee Meeting #4 October 1, 2014.
Rabbanai T. Morgan Chief, Contingency Contracting Team Revised 6 July 2005 Lease vs. Purchase.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SAFETEA-LU Changes  Exemption of the Interstate System from Section 4(f) [Section 6007]  de minimis impacts to historic sites [Section 6009(a)]  de.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Life Cycle Cost Model Update Preliminary Report Joint Legislative Audit & Review Committee January 4, 2007 Stephanie Hoffman and Keenan Konopaski.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Community Development Department Special Exceptions for: Automotive parts (e.g. accessories and tires) and Automotive, Recreational Vehicle, and Boat Dealers.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
1 Wakulla County Concurrency Management System October 6, 2011.
Growth Management Legislative Discussion: Transportation Concurrency April 24, 2012 Growth Management Legislative Discussion: Transportation Concurrency.
Proposition 1 Workshop: the Grant Application Process July 2015.
Outdoor Heritage Fund. Established on August 1, 2013 by the Legislature. Continuing Appropriation of $20,000,000 annually from oil and gas taxes. Outdoor.
Traffic Management System Status Update February, 2008.
Rules of the Road Chapter One
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
AMENDMENTS TO THE PROGRAM COMPLIANCE REVIEW GUIDE July 2006 IFTA Annual Business Meeting.
Economic Incentive Plan Board of County Commissioners Public Hearing March 6, 2012.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Mobility Strategy Update Work Session November 17, 2009 Mobility Strategy Update Work Session November 17, 2009.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Surplus City Property – Request for Proposals Administration & Finance Committee February 1, 2012.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Pensacola Bay Ferry Service. National Park Service (NPS) Completed a Ferry Dock at Fort Pickens in November 2012 National Park Service (NPS) Completed.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Integrity Innovation Accountability Commitment to Excellence Teamwork Values Item 5L: Authorize renewal of a lease agreement for grazing on undeveloped.
Environmental Protection Division January 29, 2013 BCC Public Hearing Solid Waste Management Facility Permit Renewal Request Hubbard Construction Company.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Community Improvement Districts County Counselors Association of Kansas Annual Meeting November 15, 2010 Janet S. Garms
PROPOSED MODIFICATIONS TO ARTICLE 10 (VEHICLES AND TRAFFIC) OF THE PASADENA MUNICIPAL CODE City Council January 23, 2017.
Innovation North-Side Neighborhood Access Feasibility Study
Little Rapids Habitat Restoration St
Draft Transportation Element September 6, 2017
MPO School Transportation Working Group
Funding the Transportation Infrastructure Improvement Plan (IIP): A Discussion of Cash Flows Town Council Meeting February 15, 2017.
Comments on the National Environmental Management: Integrated Coastal Management Amendment Bill Adv Gary Birch 23 July 2013.
Board of County Commissioners
Presentation transcript:

1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009

2 Lummi Island Ferry operations have been active since 1926 Lummi Island Ferry operations have been active since 1926 The Gooseberry Point Terminal was built in 1950 The Gooseberry Point Terminal was built in 1950 Current Whatcom Chief Ferry vessel has been in operation since 1962 Current Whatcom Chief Ferry vessel has been in operation since 1962 Gooseberry Point Pier refurbished in 1982 Gooseberry Point Pier refurbished in 1982 Gooseberry Point transfer span, wing walls, dolphins replaced 1987 Gooseberry Point transfer span, wing walls, dolphins replaced 1987 Major refurbishment completed to Gooseberry Point landing 1997 Major refurbishment completed to Gooseberry Point landing 1997 The Whatcom Chief Ferry made 12,626 one-way trips in 2008 from Gooseberry Point to Lummi Island The Whatcom Chief Ferry made 12,626 one-way trips in 2008 from Gooseberry Point to Lummi Island The total count for people transports in 2008 was 216,838* The total count for people transports in 2008 was 216,838* The count for walk-on transports in 2008 was 81,533* The count for walk-on transports in 2008 was 81,533* The count for vehicle transports in 2008 was 123,285* The count for vehicle transports in 2008 was 123,285* *All counts are one-way trips from Gooseberry Point to Lummi Island from the COE report submittals. Brief History of Ferry Operations and Current Ferry Operations:

3 The Gooseberry Point dock/tidelands lease is with the Lummi Nation The Gooseberry Point dock/tidelands lease is with the Lummi Nation The original term of the lease was for twenty-five years and was initiated in the 1980’s The original term of the lease was for twenty-five years and was initiated in the 1980’s Compensation for the lease was the ownership transfer of two properties on the Lummi Peninsula from Whatcom County to the Lummi Nation Compensation for the lease was the ownership transfer of two properties on the Lummi Peninsula from Whatcom County to the Lummi Nation The current lease has an expiration date of February 14, 2010 The current lease has an expiration date of February 14, 2010 The transfer span and some of the docking facility pass over the tidelands owned by the Lummi Nation The transfer span and some of the docking facility pass over the tidelands owned by the Lummi Nation Whatcom County had an expectation to pursue the “Option to Renew” clause in the lease via the language “…the lessee is hereby granted an option to renew this lease for one additional term of not more than twenty five (25) years.” Whatcom County had an expectation to pursue the “Option to Renew” clause in the lease via the language “…the lessee is hereby granted an option to renew this lease for one additional term of not more than twenty five (25) years.” The renewal clause for the second twenty-five year extension has been determined to be invalid due to the absence of signature authority on the document from the Federal Government The renewal clause for the second twenty-five year extension has been determined to be invalid due to the absence of signature authority on the document from the Federal Government Current Lease Details:

4 Current Factors Impacting the Gooseberry Point Dock: Lummi Nation is developing plans for an integrated marina Lummi Nation is developing plans for an integrated marina Ferry system dock and route do not enhance those plans Ferry system dock and route do not enhance those plans Coastal Habitat Restoration project will establish islands Coastal Habitat Restoration project will establish islands Lummi Nation future plans for the site will require a new dock location to be developed by Whatcom County Lummi Nation future plans for the site will require a new dock location to be developed by Whatcom County Local traffic congestion, long queuing lines, parking access and vandalism have been traditional issues associated with this location Local traffic congestion, long queuing lines, parking access and vandalism have been traditional issues associated with this location

5 \ Whatcom County Pictometry Image inch = 600 feet Based on Lummi Nation Project Narrative: Conceptual layout of habitat islands Ferry Dock with Islands Ferry Dock with Islands

6 Current Lease Renewal Options: Option One reflects capital improvements to multiple roadway sidewalk and other facilities in the general area of Gooseberry Point with an estimated cost over the term of a 5 year, 10.5 month lease of $17,413,500. over the term of a 5 year, 10.5 month lease of $17,413,500. ■ Consideration for Lease: a. $6,000/month for 5 years and 10.5 months =$ 423,000 b. Multiple improvement projects – Outlined below$ 16, 870,000 c. $10,000/month/project not completed – impossible to estimate$ Unknown ■ Mitigation for Interference With Treaty Fishing Rights: a. Per Trip Fee for Ferry trips. Amount not detailed.$ Unknown b. Reduce speed of Ferry to “no wake” speed at 500 feet.$ No Cost ■ Sanitary Facilities: Build Public Rest Room Facilities$ 35,000 Hook-ups and operational installations$ 15,000 Maintain Rest Room Facilities and provide Trash Services Estimated $1,000/month for 5 years and 10.5 months$ 70,500 Total Estimated Cost of this proposal$ 17, 413, 500

7 Current Lease Renewal Options: Summary - Multiple improvement projects for Option One: ■ $2,550,000 - Side Walk north along Lummi View Drive (Haxton Way) from McKenzie Road to Ferry ■ $6,000,000 - Move queing off Lummi View Drive ■ $3,000,000 - Side Walk along Haxton Way from Smokehouse Road to McKenzie ■ $ 920,000 - Side Walk along Haxton Way from Balch Road to Smokehouse Road ■ $2,400,000 - Side Walk along Haxton Way from Cagey Road to Balch Road ■ $2,000,000 - Side Walk east along Lummi View Drive to McKenzie Road $16,870,000

8 Current Lease Renewal Options: ■Option Two, identified as a preferred option by the Lummi Nation, consists of a 5 year term with an estimated cost of $300,000. The Ferry operations would be removed from the current Gooseberry Point location by the end of the lease term and be functioning from another location as yet to be determined. ■Note: The Lummi Nation has requested a per trip fee for “Mitigation for Interference With Treaty Fishing Rights.” Any compensation amount would clearly need to be added to all other associated costs of the Ferry operation.

9 Future Objectives/Timelines: ■ Acquire agreement on lease terms by the end of 2009 ■ Execute new agreement by 2/1/2010 ■ Determine new direction by 8/1/2010 ■ Incorporate new budget objectives into 2011/2012 Budget Process ■ Pursue new direction and be operational on, or before, the end of the new extended lease

10 Decision Considerations – Decision Analysis Proposal: ■What impacts are there to law enforcement, emergency response units, public school services, public utilities, public support services (solid waste), etc. and how will they be resolved? ■What type of service should be provided – traditional vehicle/passenger, or some other alternatives? ■What are the possible impacts to organized labor groups via any changes to public service sector operations? ■What hours of operation and what days of operation will be considered as minimum for the type of service selected? ■What costs can be anticipated for the type of service desired and hours/days of operation desired? Who will pay those costs and in what proportion? ■If a new dock and/or vessel(s) are desired, what are the timeframes and costs associated with financing, permitting, construction and who will pay those costs? ■Once the type of service is determined, the type of service delivery should be evaluated. Should the service be provided by the private sector, the public sector and/or some combination of both?

11 Lummi Population Graph

12 Immediate Opportunities For Consideration: ■ The Whatcom Chief can be authorized to travel to Fairhaven and other points in Bellingham Bay. Such operations would be weather dependant. Minor modifications can be made to the ship (lifeboats). Vehicle capacity will be reduced to the extent that safe operations can be completed for the 50 minute one-way trip. ■ The Whatcom Chief can utilize the Alaska Ferry docking mechanism at Fairhaven except during -3 tides (about twice a year) and when the Alaska Ferry is utilizing the facility. ■ Incorporation of a private sector passenger-only ferry service is a possibility for multiple trips per day. Costs are being estimated and compiled.

13 Lummi Ferry Map