Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting 1.6.2013.

Slides:



Advertisements
Similar presentations
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Advertisements

Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Front-end electronics for the LPTPC  Connectors  Cables  Alice readout electronics  New developments  New ideas  Open questions Leif Jönsson Phys.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Current TPC electronics P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 18, 2014.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
CCD Cameras with USB2.0 & Gigabit interfaces for the Pi of The Sky Project Grzegorz Kasprowicz Piotr Sitek PERG In cooperation with Soltan Institute.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Status of NA62 straw electronics Webs Covers Services Readout.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
TPC electronics Status, Plans, Needs Marcus Larwill April
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
AIDA 3rd Annual Meeting1 First test of MCM prototype board 1 G. De Lentdecker 2 L. Jönsson 2 U. Mjornmark 1 Y. Yang 3 F. Zhang 1 Université Libre de Bruxelles.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Development of the readout electronics a status report Leif Jönsson Collaboration meeting Santander
Development of the readout electronics in Lund for the ILD TPC Vincent Hedberg, Leif Jönsson, Anders Oskarsson, Björn Lundberg, Ulf Mjörnmark, Lennart.
The SALTRO16 system. From ALTRO to SALTRO16 A decrease in size by a factor mm 32.5 mm FEC MCM 8.9 mm 25 mm 170 mm Pad Module 19 cm 17 cm 32.5 mm.
Development of T3Maps adapter boards
Status of the TPC readout electronics
LKr status R. Fantechi.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
The future readout system based on SALTRO16
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Design of a Multi Chip Module
Large Area Endplate Prototype for the LC TPC
WP02 PRR: Master Oscillator and RF Reference Distribution
TPC Large Prototype Toward 7 Micromegas modules
Torsten Alt, Kjetil Ullaland, Matthias Richter, Ketil Røed, Johan Alme
Status of the EUDET Prototype
SALTRO16 activities in Lund
Presentation transcript:

Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting

The SALTRO-16 readout system The SALTRO16 readout system is a highly advanced system with several subsystems including new technology The Large Prototype TPC Detector control

The challenges The challenge is not only to bring down the size of the present FEC (17x19cm 2 ) to one that is compatible with the pad size per channel, but in addition to solve the following tasks: Set up a test socket and develop a test socket board for tests of the SALTRO-chips mounted on the carrier boards. Develop an MCM prototype board for functionality tests. Develop the final MCM-board and program the CPLD (Complex Programmable Logic Device) (Yifan Yang, Brussels). Develop a Low Voltage (LV) prototype board for functionality tests. Develop the final LV-board for 8 different voltages per MCM-board i.e. each voltage board has 40 voltage regulators, and transfer a total current of  80 A which gives a power of  110 W. Develop a Detector Control System (DCS) for control and montoring of the MCM- and LV-boards. This includes a master board and slave (5to1) boards. Setup of a serial redout system (SRU). We need help with modification of the firmware. Setup of a monitor system, DOOCS (Oliver Schäfer, Rostock) Constuct the mechanics to integrate the readout electronics, the cooling of the electronics and the HV supply for the gas amplification system (Volker Prahl, DESY).

Status of the SALTRO-development in Lund 1) Carrier board 610 SALTRO16 chips have been obtained from CERN (die size; 8.7 x 6.2 mm 2 ). Size of carrier board 12.0 x 8.9 mm 2 Design ready since some time. Specification document ready and sent to the company. Contract with company for mounting components has been signed. Production of PCB:s followed by mounting of components soon. 2) Test socket for testing SALTRO-chips on carrier boards Contact with manufacturer in US established. Will be ordered as soon as we get the exact final dimensions of the carrier board.

3) Test socket board The design is ongoing This board will be an interface between the test socket and the CERN SALTRO test board below

4) The Multi Chip Module (MCM-board) a)The prototype board Design ready PCB will be ordered shortly. This board is a stand alone board which contains one SALTRO-chip in a QFP package and the necessary voltage regulators. There are a several test points and connectors for connecting to a logic analyzer to probe the functionality. With this system we can also develop and test the serial readout. b) The final MCM-board The main components on this board are: 8 carrier boards, connectors to the pad plane, a CPLD, connectors for data transfer and LV-support. The circuit design is ready but we are waiting for the test results from the prototype board before the design is finally fixed

Top side Below side 4 mCM-boards on a credit card The final MCM-board

Side view of the board assembly Since it was necessary to add two layers (8 instead of 6) the carrier board has become 0.2 mm thicker. It means that the available space for cooling pipes between the MCM and the pad plane is 1.6 mm. Organization of the MCM-boards within a module 3200 channels corresponds to a pad size of 1 x 8.5 mm 2 if the whole area of the module is covered. 1.6 mm

5) The Low Voltage Board a) The final LV-board This board provides low voltage for five MCM-boards on a row on the pad module. There are five rows i.e. five LV-boards per module. The board contains I/O registers to switch on/off the voltage regulators, ADC:s to monitor voltages and currents respectively, and it also contains a temperature sensor. b) The prototype board The PCB is ready and temperature sensor mounted.. RJ45 connectors for serial readout Towards MCM-board LV connection LV connection

LV-boards on a pad module The LV-boards also have to be cooled.

6) The Detector ControlSystem a)The master board PCB ready and mounted, contains one microprocessor to communicate with the five 5to1 boards. b)The 5to1 boards PCB:s ready and one complete board mounted, contains one microprocessor per LV-board. The board muonted have been tested and are working

The boards are presently under test The test setup

Some pictures (taken last week) Master board5to1 board LV-prototype board

8) Serial readout One SRU (Serial Readout System) with power box has been purchased from CERN but is still waiting to be transported to Lund until we know who can help us with the modification of the firmware. Any volonteer from LCTPC??? 7) The monitor system DOOCS We will monitor around 700 parameters from the MCM- and LV-boards per padmodule. For this we propose to use DOOCS, which has been developed at DESY for FLASH and is in use by the DESY LCTPC-group with good experience. We have been promised to get help from Oliver Schäfer to install our system into DOOCS 9) Mechanics First scetch made by Volker Prahl. Further discussions next week

Open questions: Requirements on Trigger/data rate. Should we use ALICE DDL or Ethernet for the DAQ? Can we reuse parts of the TPC DAQ/Monitor? Data format? Who can write the SRU firmware and the protocol between the MCM:s and SRU? Should we prepare for running with other detectors, common DAQ? How will we implement the trigger system and power pulsing? Are there more problems to be solved? Everything depends on each other.