SPSC – CAST STATUS REVIEWHELIUM3 Gas System HELIUM 3 GAS SYSTEM FOR CAST Nuno Alexandre ELIAS Technical University of Lisbon (UTL) Laboratory of Instrumentation.

Slides:



Advertisements
Similar presentations
GAS SYSTEM STATUS Phase II HELIUM4 GAS SYSTEM STATUS >Status update >Result of TAO Tests >Thermodynamic behavior of the gas >Computational fluid dynamics.
Advertisements

MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Target Wheel Prototype Progress Zeuthen meeting – Apr 7-9 Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
DISTRIBUTED CRYOGENIC COOLING WITH MINIATURIZED FLUID CIRCUITS Steffen Grohmann, ETT/TT RD39 Collaboration ST Workshop 2003 CERN, April 01-03, 2003.
Simulated Propellant Loading System (SPLS): Testbed for Cryogenic Component and Control Systems Research & Development J. Toro Medina, J. Sass, J. Youney,
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
CRYOGENICS AND POWERING
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
DARK SIDE OF THE LIGHT Ing. Karolina Macúchová Supervisor: doc. Ing. J. Zicha, CSc. Konference Studentské tvůrčí činnosti 2013Dark Side of the Light.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
ICHEP / 24 Status Report of CERN Axion Solar Telescope (CAST) Experiment Dieter H.H. Hoffmann (Tech. University Darmstadt & GSI – Darmstadt) on.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Modeling and simulation of cryogenic processes using EcosimPro
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Large extra dimensions and CAST Biljana Lakić Rudjer Bošković Institute, Zagreb Joint ILIAS-CAST-CERN Axion Training, , CERN Joint ILIAS-CAST-CERN.
I. Giomataris NOSTOS a new low energy neutrino experiment Detect low energy neutrinos from a tritium source using a spherical gaseous TPC Study neutrino.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
Results and perspectives of the solar axion search with the CAST experiment Esther Ferrer Ribas IRFU/CEA-Saclay For the CAST Collaboration Rencontres de.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Phase II GAS SYSTEM FRC1 Finance Review Committee Meeting CAST experiment K. Zioutas  axion academic training CERN 2/12/2005.
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
Optical Fiber Sensors for Cryogenic applications Presented by: Daniele Inaudi, CTO SMARTEC
X-ray telescope: D. Greenwald, R. Kotthaus, G. Lutz
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
HFM Test Station Main Cryostat
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
How SCADA Systems Work?.
The MICROMEGAS detector in CAST
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
ILC Experimental Hall Cryogenics An Overview
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Scanners – Robots – Measurement Plans Synergy in Motion
Cryomodules Challenges for PERLE
Tasks, Responsibilities Expectations and Needs
Cryogenic behavior of the magnet
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

SPSC – CAST STATUS REVIEWHELIUM3 Gas System HELIUM 3 GAS SYSTEM FOR CAST Nuno Alexandre ELIAS Technical University of Lisbon (UTL) Laboratory of Instrumentation and Experimental Physics (LIP) Supervisors: Tapio Niinikoski (CERN), Paula Bordalo (LIP)

SPSC – CAST STATUS REVIEWHELIUM3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 2 Introduction How to extend AXION rest mass search? CAST Phase I with vacuum g agg ≤ GeV -1 for m a < 0.02 eV To restore lost coherence → buffer gas K.V.Bibber et al., Phys. Rev. Lett. D. 39 (1989) 2089 Which gas, at 1.8 K ? 4 He, P sat = 16.4 mbar → m a < 0.43 eV 3 He, P sat = mbar → m a <1.23 eV How to scan? Maximize discovery potential within limited time frame Overlapping the axion mass distribution at FWHM between two consecutive density settings Result: increasing step size from 0.08 to 0.12 mbar (at 1.8K)

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 3 Challenge Gas Metering Stability, Accuracy, Reproducibility <0.01 mbar stability, <1 step reproducibility Thermally controlled calibrated volumes Metrological Pressure Measurement Homogeneous thermalization with superfluid Helium Computational Fluid Dynamics modeling Amount of gas measured with better than 60 ppm Gas Confinement ( X-ray Windows) High X-ray transmission (Thin) 15  m polypropylene ~88%, PP15 >80% (>2keV), 4.2keV Robust (Strong-back mesh)  5.2mm, |0.3mm, ↓ 5mm Hermeticity tested < 1x10-7 mbar. l. s -1 Pressure Tested All cycled at 1 bar (prototype holds 3.5 bar) Regularly baked-out to avoid cryopumping

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 4 Challenge Superconducting magnet resistive transition (Quench) Rapid temperature rise → Pressure increase (max:2.9 bar) Goal: Minimize Pressure reach Sub- atmospheric (P max /P 0 < 8) Protection of the cold X-ray windows Requires: Fast Quench Detection/ Fast Gas Extraction High Flow Conductance Large Expansion Volume (450 litres) Absence of spontaneous thermo-acoustic oscillations Initial CAST setup: Observed oscillations Oscillations reduce axion-photon conversion probability Investigation of driving parameters Numerical Modeling Installation of diagnosing tools Installation of active and passive measures for elimination Miniature Cryogenic Pressure Transducer

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 5 Storage region Metering region Axion conversion region Expansion region (Recovery) Schematic drawing Constraints: Limited space Weight restrictions Custom components Magnet movement Instrumentation Technical Design Report [CERN-SPSC ] Requirements: Avoid loss of 3 He Absence of TAO’s Precision/Reproducibility Multiple stepping /Ramping of density

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 6 Construction MFB, integration model MRB, integration model Metering region integration model

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 7 Construction MFB, intervention MRB, intervention Gas metering panel

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 8 Construction Installation of Expansion Volume Liquid Nitrogen purification trap

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 9 Construction Storage Region Cryogenic needle valve

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 10 Control, Operation, Supervision 8 Modes of operation 102 Signals with large variety Flexible operation Easy user interface/ Remote Operation PLC for Control & Operation, Supervision + Data Management Standard control Architecture design UNICOS (UNified Industrial COntrol System) – Reliable + CERN support + Cryogenics dynamics simulation for pre-commissioning Based on simultaneous generation of: PLC (Programmable Logic Controller) + UPS (uninterruptible power supply) SCADA (Supervisory Control & Data Acquisition) +diagnosing tools, rapid prototyping and regeneration mechanisms Benefits from LHC_logging for long term archiving + TIMBER (Technical Infrastructure Monitoring) interface tools for data analysis Supplementary DAQ for sensitive instrumentation and analysis software

SPSC – CAST STATUS REVIEWHELIUM-3 Gas System SPSC CERN (22APR2008) Nuno Alexandre ELIAS UTL / LIP (Portugal) 11 Final Remarks..it was an exhausting but rewarding intervention Total cost within the budget some unexpected delays occurred System was fully commissioned with 4 He in November 2007 and was used for data taking in December Since February 2008 the system is fully operational with 3 He, and is expected to be essential for the success of the physics runs up to 2010 Axion ‘  ’ Axion ‘is worth it’ Thank you Special thanks to: CERN Cryolab, CERN Main Workshop, PH-DT1, AT-ECR-CO, AB-CO, Saclay