Ken Wright Sensis Corporation January 28, 2010 Modeling and Simulation Challenges and the New Vehicle NRA.

Slides:



Advertisements
Similar presentations
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
Advertisements

7 tasks identified Flight Arrival Interaction Detection Resolution Planning Resolution Implementation Monitoring Other Trajectory Changes Co-ordination.
CE 515 Railroad Engineering Capacity Source: REES Module 6 & An Enhanced Parametric Railway Capacity Evaluation Tool
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
Continuous Climb Operations (CCO) Saulo Da Silva
Temporal Variations in Demand West Fixes East Fixes.
Aerion Supersonic Business Jet Market, Environment and Technology HISAC Final Conference Paris, June, 2009 Richard R. Tracy Chief Technology Officer Aerion.
Emergence of Regional Jets and the Implications on Air Traffic Management Aleksandra Mozdzanowska and R. John Hansman Massachusetts Institute of Technology.
Estimating Requirements and Costs of 4D ATM in High Density Terminal Areas Gunnar Schwoch DLR Institute of Flight Guidance Braunschweig, Germany ICNS 2012.
1 Reactive Pedestrian Path Following from Examples Ronald A. Metoyer Jessica K. Hodgins Presented by Stephen Allen.
MIT Lincoln Laboratory Evans benefits ARAM1 jee 6/4/2015 Assessment of Aviation Delay Reduction Benefits for Nowcasts and Short Term Forecasts James Evans.
Jonathan Chiew AA253 – Spring  Develop a top-level public transportation system capable of moving 1.5 million passengers per year between two cities.
Science Meeting-1 Lin 12/17/09 MIT Lincoln Laboratory Prediction of Weather Impacts on Air Traffic Through Flow Constrained Areas AMS Seattle Yi-Hsin Lin.
Airspace Concept Evaluation System- State of Development
1 Autonomously Controlled Vehicles with Collision Avoidance Mike Gregoire Rob Beauchamp Dan Holcomb Tim Brett.
Airspace Resource Allocation -Operations Impact Prof. R. John Hansman, Director MIT International Center for Air Transportation
NSWRC Operational Scenarios October 18, 2012 Mark Weadon AvMet Applications.
Next Generation Air Transportation System (NextGen): Wx Integration Ray Moy New Weather Concept Development Branch FAA, Aviation Weather Division, ANG-C62.
TCAS Basics Capt Craig Hinkley. 2 TCAS HISTORY  Two planes collided over the Grand Canyon  Alternative airborne version using transponders.
TARGETS Enabling NextGen With Advanced Procedure Design Software October 22, 2013.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Federal Aviation Administration FOR OFFICIAL USE ONLY (Public availability to be determined under 5USC 552) Data Communications Program DCL Benefits Modeling.
Revised March CSSI, Inc. Headquarters 400 Virginia Avenue, SW Suite 210 Washington, DC fax toll-free.
Weather Technology in the Cockpit (WTIC) - Uncertainty/Probabilistic Information in the Cockpit Projects July 21, 2014 Gary Pokodner 1 Friends and Partners.
Unmanned aerial systems, what they are and what is available? Professor Sandor M Veres University of Sheffield.
1 Perception, Illusion and VR HNRS 299, Spring 2008 Lecture 19 Other Graphics Considerations Review.
EUROCONTROL EXPERIMENTAL CENTRE1 AIRSPACE CONGESTION: Pre-Tactical Measures and Operational Events ICRAT Conference, Zilina November 22, 2004 Nabil BELOUARDY.
1 AvMet Applications, Inc Alexander Bell Dr., Ste. 130 Reston, VA Weather-Aware Post Event Analysis Mike Robinson AvMet Applications, Inc.
DM 4/4/02 Direct-To Controller Tool FAA/NASA Joint University Program Meeting NASA Ames Research Center April 4-5, 2002 Dave McNally Direct-To Project.
December 1, 2008 Overview of the FAA’s Aviation Environmental Design Tool (AEDT) Presented to: National Parks Overflight Advisory Group (NPOAG) Presented.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
A Perspective on NASA Ames Air Traffic Management Research Jeffery A. Schroeder Federal Aviation Administration* * Formerly NASA Ames.
SAFETEXTER SAVING LIVES BEHIND THE WHEEL MICHAEL DOWDY DONOVAN HICKS KENNETH LEWIS DANNY THEPVONGSA.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
1 1st ANNUAL WORKSHOP NAS-WIDE SIMULATION IN SUPPORT OF NEXTGEN: REQUIREMENTS AND CAPABILITIES Lance Sherry Center for Air Transportation Systems Research.
LMINET2: An Enhanced LMINET Dou Long, Shahab Hasan December 10, 2008.
Presented to: NAS-Wide Simulation & NextGen workshop By: Kimberly Noonan, Joseph Post Date: December 10th, 2008 Federal Aviation Administration The Modernized.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
1 ATM System Wide Modeling Capabilities in Fast-Time Simulation 1 st Annual Workshop – NAS-Wide Simulation in Support of NextGen Dec. 10th – George Mason.
NAS-WIDE Simulation Workshop December 10, 2008 Interagency Portfolio & Systems Analysis Division Yuri Gawdiak.
Ames Research Center 1 FACET: Future Air Traffic Management Concepts Evaluation Tool Banavar Sridhar Shon Grabbe First Annual Workshop NAS-Wide Simulation.
Baseline Future Scenarios for JPDO Evaluation and Analysis March 18, 2005 (408) Matthew Blake.
F066-B Public Release No.: © 2010 The MITRE Corporation. All rights reserved. Demand Generation for System-wide Simulation Glenn Foster MITRE.
Advanced Speed Guidance for Merging and Sequencing Techniques Chris Sweeney Thomas Jefferson High School for Science and Technology MITRE Corporation Center.
Artificial Intelligence in Game Design Complex Steering Behaviors and Combining Behaviors.
1 Real-Time Parking Information on Parking-Related Travel Cost TRIP Internship Presentation 2014 Kory Harb July 24, 2014 Advisor: Dr. Yafeng Yin Coordinator:
© 2015 The MITRE Corporation. All rights reserved. Friends and Partners of Aviation Weather Claudia McKnight ATM-Weather Integration Gap Analysis CAASD.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
Measurement in the Internet Measurement in the Internet Paul Barford University of Wisconsin - Madison Spring, 2001.
Problems n The main problem is the congestion of traffic in the air. With the congestion come further problems, such as: –There are too few large airports.
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
Using Simulation in NextGen Benefits Quantification
Response modelling including dispersants BE-AWARE II Final Conference, November, Ronneby, Sweden Co-financed by the EU – Civil Protection Financial.
Joint Planning & Development Office Evaluations & Analysis Preliminary Scenario Analyses Strategy Assessment to Provide a Basis for Prioritizing Investments.
FAA Support for DoD’s UAS AI Joint Test Joint University Program (JUP) TIM Al Schwartz, Modeling and Simulation Branch, ANG-C55 January 21, 2016.
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
Presented to: By: Date: Federal Aviation Administration Quantification of Benefits of Aviation Weather A discussion of benefits Friends and Partners in.
Estimating the En route Efficiency Benefits Pool Dan Howell, Michael Bennett, James Bonn, CNA Corporation Dave Knorr, FAA AOZ-40 June 23, 2003.
USING HISTORICAL FLIGHT DATA TO EVALUATE AIRBORNE DEMAND, DELAY AND TRAFFIC FLOW CONTROL Michael Brennan, Terence Thompson Metron Aviation, Inc Steve Bradford,
EUROCONTROL EXPERIMENTAL CENTRE1 / 29/06/2016  Raphaël CHRISTIEN  Network Capacity & Demand Management  5 th USA/Europe ATM 2003 R&D seminar  23 rd.
Presented to:Nextor NAS-Wide Modeling Workshop By: Joseph Post, NextGen Systems Analysis Date: January Federal Aviation Administration NextGen.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Friends and Partners of Aviation Weather
Users’ Perspective of PBN Achieving Improvements
On-board Technologies
Newton’s second law In this lesson, students learn to apply Newton's second law to calculate forces from motion, and motion from forces. The lesson includes.
Ground System implication for ASAS implementation
Presentation transcript:

Ken Wright Sensis Corporation January 28, 2010 Modeling and Simulation Challenges and the New Vehicle NRA

2 Background Analyze the combined impacts of advanced vehicles and NextGen

3 Vehicles M 0.78, 35k – 40k ft 2000 nm M k ft to 53k ft 4000 nm 1200 nm M 0.5, 25k ft CESTOL SST LCTR UAS 750 nm 400 nm VLJ M 0.28, 15k ft M 0.6, 35k ft

4 Background (Continued) Timeframe –2025 –2040 (roughly 2 times today’s traffic levels) –3X (3 times today’s traffic levels) Tasks –Design vehicles –Develop usage scenarios –Compute delay –Compute environmental impacts –Compute metroplex impacts –Compute safety impacts –And much more

5 Model Infrastructure

6 The Focus of this Presentation is ACES To do NAS-wide simulation in ACES we need: BADA Data Schedules/Capacities ACES tracks used by AEDT to compute environmental impact

7 General Modeling Simulation Observations Designing good experiments is tough –Results often seem obvious –Difficult to translate concepts into hypotheses that leverage model strengths Difficult to spot erroneous results –Large datasets, complex interactive models –Figuring what’s going on below the surface is difficult Some modules don’t work well with large datasets –Results not significantly impacted –New features can increase run time, without affecting results –ACES 5.0 vs ACES 6.2 compatibility issues

Challenge: Demand Generation

9 JPDO-Provided Demand Sets

Huge delays at LAS and ATL due to capacity-demand imbalance dominate systemwide-results

12

13 ACES-Specific Observations MPAS (physics model) currently can’t fly unconventional vehicles –Cruise-Efficient STOL Aircraft (cruises too slow) –Supersonic transport (cruises too fast) –Tiltrotor (takes off like a helicopter) Tail-tracking Terminal area tracks Conflict Detection and Resolution Weather obstacles (Back-up)

14 Tail-Tracking One-third of all delay is propagated delay ACES tail-tracking doesn’t quite work

15 Sensis Itinerary-Creation Algorithm gives 5-6 Stages per Airframe

16 Increase in delay due to tail-tracking too small to be realistic

Aircraft is in two places at the same time

18 Short flights show discontinuous tracks Flights having great circle distance less than about 60 nm fly discontinuous “X” routes Affects 3,000 to 3,500 ACES flights in 2040 dataset (about 3.5% of total) Because flights fly longer routes than necessary, amount of time spent airborne is too long.

19

20

21

22 Flight from TEB to LGA is Airborne for 31 Minutes. Average speed = 21 mph

23 Conflict Detection and Resolution Not used in New Vehicle project Causes about as many conflicts as it resolves

CDR Causes Collision

26 CDR Causes Collision

Aircraft sense impending 5-nm conflict CDR Causes Collision

Aircraft move to avoid 5-nm conflict CDR Causes Collision

Aircraft move to avoid 5-nm conflict CDR Causes Collision

Boom! CDR Causes Collision

57 3X-Dataset No restrictions on international arrivals leads to large sectors exceeding capacity limits

2086

Foreign arrivals choke off domestic departures. (175k flights)

60 Conclusions Big project; tested lots of models; pushed limits of ACES and AEDT It’s probably more fun to be a developer than a user Coming up with interesting experiments is tough –Experiments should leverage model strengths to find novel results Difficult to spot erroneous results Some modules/capabilities did not work as expected for our large- scale experimental configuration

Ken Wright Sensis Corporation Questions?

Back up

63 Rerouting around Weather Mostly worked, but number of weather polygons scenario could use was unnecessarily limited Peculiar reroutes due to lack of airborne holding capability in ACES

64 Clusters of Storm Cells (>=50 DBZ) Replaced by Rectangles Clusters of Storm Cells (>=50 DBZ) Replaced by Rectangles

65 Clusters of Storm Cells (>=50 DBZ) Replaced by Rectangles Clusters of Storm Cells (>=50 DBZ) Replaced by Rectangles

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80 Final fix blocked

81 Final fix blocked

82 Final fix blocked

83

84

85

86

87

88

89

90

91

92 It appears that the flight turns around only when it bounces off another weather cell

93

94

95

96

97

98

99

10 0