1 Mid-America Earthquake Center Optimizing Temporary Housing Arrangements after Disasters Omar El-Anwar Doctoral Researcher Construction Management Civil.

Slides:



Advertisements
Similar presentations
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Advertisements

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Earthquake Albanov Artem 8 class Content What is an earthquake? What is the hypocenter and epicenter? Seismograph. Mercan scale (MSK-86). Illustrate.
Government Industry R&D Forum March 2005 Pipeline Design & Construction Near Term Focus Future Gaps & Opportunities.
STARTING POINT Crisis due to natural disaster, earthquake 2010, that destroyed thousands of houses Assistance to 2 camps on the road to Port-au-Prince,
National Center for Supercomputing Applications University of Illinois at Urbana-Champaign MAEviz: Seismic Risk Assessment System October 31, 2008.
Environmental Engineering
LEADERS 2006 International Course on Development and Disasters November 20 – December 01, Ocho Rios, Jamaica. RISK REDUCTION Presenter: Aston Brown.
Introduction: Environmental Engineering In Context.
Session 141 Vulnerability to a natural hazard can be defined as to the extent to which people will experience harm and property will be damaged from that.
Introduction to Management Science
Regional Disaster Resilience Initiative Focusing on Recovery and Restoration.
Historical Disaster Information System in Sri Lanka (Disaster Inventory Database Based on Desinventar) Anoja Seneviratne Director (Mitigation Research.
Facility Location Problems Hooman Mohajeri Moghaddam Winter 2011.
Youssef Hashash In collaboration with Duhee Park
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
International Health and Safety at Work
Performance-based Seismic Design in 2014 Canadian Bridge Code
A 21 ST CENTURY LOOKBACK WILL SUSTAIN A COMMUNITY’S FOCUS ON DISASTER RESILIENCE Walter Hays, Global Alliance for Disaster Reduction, University of North.
LESSONS FROM PAST NOTABLE EARTHQUAKES PART VI Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
The Role of Decision Support Systems and Other Tools in Watershed Planning Rick Farnsworth Bernie Engel Jon Bartholic Rich Zdanowicz Watershed Planning.
1 Safety & Health Management. One of the most important factors that should be taken in consideration in the site, (from engineering point view), is the.
Environmental Toolbox. Technical Module Introduction.
Waste Management and Research Center Waste Management and Research Center l Formed in 1984 l IL Dept of Natural Resources l Located at University of Illinois.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
CR TOOLKIT WORKSHOP MANAGEMENT TOOLKIT - RESETTLEMENT PLANNING Ref – ICMM CD TOOLKIT # 18 - Trainer: Martin Paining Date: 28 th of November, 2013.
Health Emergency Risk Management Pir Mohammad Paya MD, MPH,DCBHD Senior Technical Specialist Public Health in Emergencies Asian Disaster Preparedness Center.
LaHave House Project 1 LaHave House Project Automated Architectural Design BML + ARC.
CE Introduction to Environmental Engineering and Science Readings for Next Class : O hio N orthern U niversity Introduction Chemistry, Microbiology.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
Consultant: CMDC Joint Venture 1 Evaluation and optimisation of alternatives Two cases - Criteria of judgement - Matrix evaluation, including costs - Mitigating.
1 Mid-America Earthquake Center Optimizing Temporary Housing Arrangements after Disasters Omar El-Anwar Doctoral Researcher Construction Management Civil.
Shelter Centre Meeting, Geneva24 May 2012 Sustainable Reconstruction in Urban Areas A Handbook Project Coordinator: Sandra D’Urzo, IFRC Lead Author and.
© 2014 wheresjenny.com Environment v/s technology ENVIRONMENT V/S TECHNOLOGY.
ECLAC HANDBOOK FOR ESTIMATING EFFECTS OF DISASTERS1 HANDBOOK FOR ESTIMATING SOCIO-ECONOMIC AND ENVIRONMENTAL EFFECTS OF DISASTERS Economic Commission for.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Utah 2030 Preparing State Government for Utah’s Changing Demographics.
Efficient Point Coverage in Wireless Sensor Networks Jie Wang and Ning Zhong Department of Computer Science University of Massachusetts Journal of Combinatorial.
1 Introduction to Emergency Management in Ohio Unit Nine: Community Partnerships.
1 Introduction to Emergency Management in Ohio Unit Five: Community Partnerships.
1 CONFIDENTIAL ©2016 AIR WORLDWIDE Using Climate Data and New Analytics to Inform Private Decisions in Climate Resilience Brent Poliquin, CCM May 27, 2016.
OPTIMAL PLANNING OF ENERGY EFFICIENCY PROGRAMS WITH THE PAID-FROM-SAVINGS STRATEGY Seyedmohammadhossein Hosseinian Ph.D. Student, Zachry Department of.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
ASH ENV 333 E NTIRE C OURSE Check this A+ tutorial guideline at For more classes visit.
Effects of natural disasters on displaced workers
ENV 203/205: Introduction to Geography of Bangladesh
Intercity Passenger Rail and its Return on Investment
Introduction to Linear Programs
Offsite Manufacture.
8.E.5B.3 Define problems that may be caused by a catastrophic event resulting from plate movements and design possible devices or solutions to minimize.
Jason Ross Iowa Pork Industry Center
DISASTER MANAGEMENT – WITH SPECIAL EMPHASIS ON EARTHQUAKE
PreOpenSeesPost: a Generic Interface for OpenSees
ChE 473K Plant Design R. Bruce Eldridge.
Mixture Density Networks
Disasters.
Factors to Consider when Designing a Reliable Power Grid
Hurricane Evacuation Traffic Modeling
Engineering design is the process of devising a system, component, or process to meet desired needs. It is a decision-making process in which the basic.
Building a CMMI Data Infrastructure
Exercise.
Community Health Needs Assessment
End-Users Needs in Seismic Hazard Analysis
LINEARPROGRAMMING 4/26/2019 9:23 AM 4/26/2019 9:23 AM 1.
Conflict Engineering proposal
Infrastructure planning and management
Table 1. Criteria for urban highway environmental impact assessment
ENVE 321: Intro to Environmental Engineering
Disaster mitigation and management
Presentation transcript:

1 Mid-America Earthquake Center Optimizing Temporary Housing Arrangements after Disasters Omar El-Anwar Doctoral Researcher Construction Management Civil and Env. Engineering Dept. University of Illinois Urbana, IL November 8, 2007

2 Mid-America Earthquake Center Outline  Introduction  Interface with MAEVis  Output Mock-ups

3 Mid-America Earthquake Center Motivation Housing is the single greatest component of all losses in terms of economic value and in terms of buildings damaged. (Comerio 1997a)

4 Mid-America Earthquake Center Problem Statement There is a need for a multi-objective optimization methodology

5 Mid-America Earthquake Center Research Objectives 1. Minimize Socioeconomic Disruption 1.1 Displacement distance from preferred location 1.2 Housing quality 1.3 Delivery time 1.4 Location capacity Healthcare support Economical opportunities Educational needs Safety requirements 4. Minimize Public Expenditures 3. Minimize Environmental Impact 3.1 Geology and soils 3.2 Water quality 3.3 Air quality Others … 2. Maximize Public Safety 2.1 Hazardous geographic locations 2.2 Hazardous geographic areas

6 Mid-America Earthquake Center Model Implementation LP_Solve Linear Programming Open Source Libraries

7 Mid-America Earthquake Center Outline  Introduction  Interface with MAEVis  Output Mock-ups

8 Mid-America Earthquake Center

9 Outline  Introduction  Interface with MAEVis  Output Mock-ups

10 Mid-America Earthquake Center Distribution of Displaced Families Output Interface

11 Mid-America Earthquake Center  Data Analysis Visualization Output Interface

12 Mid-America Earthquake Center Output Interface  Optimization Results

13 Mid-America Earthquake Center Output Interface

14 Mid-America Earthquake Center x x

15 Mid-America Earthquake Center x x Maximum ValueSolution’s ValueMinimum Value

16 Mid-America Earthquake Center x x Maximum ValueSolution’s ValueMinimum Value

17 Mid-America Earthquake Center Output Interface  Solution Details

Output Interface  Solution Details

19 Mid-America Earthquake Center

20 Mid-America Earthquake Center

21 Mid-America Earthquake Center Output Interface

22 Mid-America Earthquake Center Thank you