Future Challenges in Cooperative Petroleum Research Future Challenges in Cooperative Petroleum Research StatusStatus ProgressProgress Grafisk030118.

Slides:



Advertisements
Similar presentations
EuropeAid PARTICIPATORY SESSION 2: Managing contract/Managing project… Question 1 : What do you think are the expectations and concerns of the EC task.
Advertisements

EuropeAid PARTICIPATORY SESSION 1: 3 topics Each table chooses its topic: o Managing reality (Blue) o Assessing performance (Yellow) o Monitoring & reporting.
UK/NW Mentoring Program | 1 June 2010 Copyright: Petrolink AS PETROLINK UK/NW MENTORING PROGRAM LESSONS LEARNED ROUND RUNE KVERNBERG ABERDEEN.
Ministry of Petroleum and Energy Unlocking Value through New Relationships Presentation by Gunnar Gjerde, Director General Norwegian Ministry of Petroleum.
Completing the cycle: an investigation of structured reflection as a tool to encourage student engagement with feedback Jackie Pates Lancaster Environment.
DR MACIEJ JUNKIERT PRACOWNIA BADAŃ NAD TRADYCJĄ EUROPEJSKĄ Guide for Applicants.
Working Group 1: Exploration – focusing on RDT in areas of geophysics and geology  Who are we  Our Mission  Goal for this workshop  Process  Speakers.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
Steinar Njå Norwegian Petroleum Directorate Licensing system in Norway.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
FROM GAPS TO CAPS Risk Management Capability on Gaps Identification in the BSR Neringa Brogaitė-Karvelienė Fire and Rescue Department under MoI of Lithuania.
HEPTech Funding Opportunities Ute Gunsenheimer ESS October 29, 2014.
19/20 May 2015, Riga “From Gaps to Caps – Risk Management Capability Based on Gaps Identification in the BSR” TASK D COMPARISON OF EVALUATIONS OF EMERGENCIES.
Using the European Portfolio for Student Teachers of Languages Barry Jones, University of Cambridge.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
US NITRD LSN-MAGIC Coordinating Team – Organization and Goals Richard Carlson NGNS Program Manager, Research Division, Office of Advanced Scientific Computing.
Uzbekistan Videoconference Series 1 Public Support to Technology Transfer and Dissemination: Local Issues and Lessons from Global Experience Effective.
1 Framework Programme 7 Guide for Applicants
Formula student as part of a mechanical engineering curriculum Dr Huw Davies – ENGIN.
UK based successful independent geological and geophysical consultancy for the international petroleum industry.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
Experiences with registrations - 5 years on the road On the REACH Road 23 November 2011 Kevin Pollard ECHA – Dossier Submission and Dissemination.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Forum for Reservoir Characterisation, Reservoir Engineering and Exploration Technology Cooperation Officially opened by Jens Stoltenberg 17. November 1995.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
1 Kārlis Valters Nordic Council of Ministers’ Office in Latvia.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
EMAC – Network and Support of National Contact Points solitander:
T 2.3 Follow up to Conferences Leonardo Piccinetti, EFB FORESTA Project Meeting Brasilia, 20 September 2011.
A technical writer’s role in software quality – an experiment Asha Mokashi, SCT Software Solutions, Bangalore.
Peer review of digital resources for the arts and humanities David Bates and Jane Winters.
Background The research topic Product Innovation Strategy belongs to the activity called product planning. It is an ongoing activity that takes place before.
5.2 Recommended projects The gaps suggested in this report are suggested as the basis for further discussions and generation of project proposals. A stratigraphic.
Oil for Development The Norwegian experience
Citizens and Governance in a Knowledge-based Society Guidelines on Proposals Presented by Henry Scott, EKT.
Horst Breier Study commissioned by the DAC Network on Development Evaluation June 2005 JOINT EVALUATIONS: RECENT EXPERIENCES, LESSONS LEARNED, OPTIONS.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
1 You are a New Member of the JAC; NOW WHAT? As a new Journey-Level Advisory Council (JAC) member, you probably have many questions, including those about.
Part-financed by the European Union Partnership Joint Technical Secretariat Lead Applicant Seminar for 1st application round Hamburg, April 2008.
Presentation and review of TTA-report: Exploration and Reservoir Characterisation Summary Background Project Proposal.
Report on the review of ACG structure The Exchange of Information Task Force October 7-9, 2009 The 13th ACG General Meeting in Hanoi.
1 Educational and financial reforms ( St. meld 27) implication for co-operation universities and industry Anders Elverhøi University of Oslo/Department.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
SME Instrument. Eligibility Criteria At least one SME established in EU member state or associated country Projects at a TRL level.
School Improvement Partnership Programme: Summary of interim findings March 2014.
A position paper should include: > Intro Sentence > Discussion of your country’s current policies on the topic > Policy proposals - potential solutions.
WYE CITY GROUP on Statistics on Rural Development and Agricultural Household Income Naman Keita FAO, Statistics Division Way forward for the Wye City Group:
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Launched on 17th November Phase II Phase III Phase IV FORCE has 22 members; 20 oil companies, NPD and NRC (observer).
YOUTH Programme TC Rainbow by JINT vzw. WHY YOUTH ?  Stimulate the mobility of young people  Active participation in the development of Europe and of.
Gül Begüm ŞEMİS. Milestones Appointments Due dates Check lists Approval The FOAK Process Phase I2 Project Process.
FIELD SERVICE upstream solutions. statement of capability We deliver reservoir, well, and integrated field management services to the upstream oil and.
January 2013 Action Plan Skills Building: Module 4 Implementing and Evaluating the Action Plan.
LL FORCE WORKSHOP Future Petroleum Research Directions April Liv Lunde Institute for Energy Technology P.O. Box 40, N-2027 Kjeller, Norway.
New Strategies in Petroleum Research Introduction By Kristian Kolbjørnsen, Chairman FResCo.
Page 1 Task 38 Australia New Zealand Participating Countries USA Canada Croatia Austria The Netherlands Denmark UK Sweden Norway Finland Ireland IEA Bioenergy.
IT Directors’ Group Meeting October 2010 Item 2.2 of the agenda Co-ordination with the DIME Rainer MUTHMANN, Head of Unit B2.
Interreg Baltic Sea Region What type of projects can receive funding? Policy-to-project-to-policy Conference Copenhagen| 28 April 2016 Ilze Ciganska, Marta.
ELIXIR SAB Feedback December 2014.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
COST Action and European GBIF Nodes Anne-Sophie Archambeau.
Preparatory projects and funding opportunities 17 th June 2010 – Copenhagen, Denmark Christopher Parker and Rachel Burn European Union European Regional.
Past and Future Phase 2 – Summary & Phase 3 – Future of FORCE
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Support to National Helpdesks
Linking assurance and enhancement
SOCIAL DIALOGUE WITHIN EUPAN
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
TLAP Partnership Meeting 7th June 2017
Rail transport developments Agenda point 7.2
Presentation transcript:

Future Challenges in Cooperative Petroleum Research Future Challenges in Cooperative Petroleum Research StatusStatus ProgressProgress Grafisk030118

Future Challenges in Cooperative Petroleum Research

Norwegian Research Council suggested 20% increase (570 MNOK) in funding from the government for 2003 Before last week:Actual increase was 10% Revised budget last week: Actual increase is 8% Wanted to strengthen research within BiotechnologyBiotechnology Petroleum technologyPetroleum technology Materials engineeringMaterials engineering October 1st 2002: SkatteFUNN (max 4MNOK/year/company)

Future Challenges in Cooperative Petroleum Research R&D-support as % of GNP (Source: NRC, 2003) Sweden : 4.3 %Sweden : 4.3 % Finland : 3.4 %Finland : 3.4 % Iceland : 3.0 %Iceland : 3.0 % Denmark : 2.4 %Denmark : 2.4 % Norway : 1.6 %Norway : 1.6 % OECD-average: 2.2 % Sweden: NOK/inhabitantSweden: NOK/inhabitant Norway: 5400 NOK/inhabitantNorway: 5400 NOK/inhabitant

Future Challenges in Cooperative Petroleum Research Good relations - personal contacts Research institutions Oil companies

Future Challenges in Cooperative Petroleum Research Project theme defined based on internal/personal interest or believing idea Project theme defined based on internal/personal interest or believing idea might be of interest to the companies might be of interest to the companies Several research istitutions lack ”the right links” to the ”right people” in the oil companies Project proposal Proposal sent to people ”they know” without necessarily being the right Proposal sent to people ”they know” without necessarily being the right technical person technical person Possibly no initial discussion prior to project presentation sent via Possibly no initial discussion prior to project presentation sent via

Future Challenges in Cooperative Petroleum Research Research institutions are using lots of time and effort to Should use the time for research write project proposal write project proposal marketing the proposals marketing the proposals

Future Challenges in Cooperative Petroleum Research - no deadline for feedback - no formal system for internal handling of external project proposals handling of external project proposals Recommendation:No - no given formal contact person - no given system for feedback Dept. A Dept. B Dept. C Dept. F Dept. E Dept. D Need a more effective process! Need a more effective process! Oil company

Future Challenges in Cooperative Petroleum Research Research institutions FORCE Secretariat (NPD) FResCo 2002 Enhanced cooperation Seminar

Future Challenges in Cooperative Petroleum Research Feedback from research institutions No more “boxes”, please! Action is needed! High quality research projects

Future Challenges in Cooperative Petroleum Research Abroad…. ? Example: UK Industry Technology Facilitator (ITF) a not for profit organisation owned and supported by major operating and service companies a not for profit organisation owned and supported by major operating and service companies the vehicle through which these companies fund joint industry projects that address the technology needs of the UK oil and gas industry. the vehicle through which these companies fund joint industry projects that address the technology needs of the UK oil and gas industry. Among other tasks: Identify gaps in technology and potential solutions Assess feasibility of proposed projects Proposals that have passed through the assessment stage are developed and put forward to members with a recommendation for funding

Future Challenges in Cooperative Petroleum Research

Asked all oil companies to list Long-term research topics and technology needs Action: Improve the process Research institutions FORCE Secretariat (NPD) FResCo

Future Challenges in Cooperative Petroleum Research

Message: Base the project proposals on ”Long-term research topics and technology needs” Submit the proposal to Force within 15 th June Purpose find the right themes for projects find the right themes for projects gain more interest for the proposals gain more interest for the proposals

Future Challenges in Cooperative Petroleum Research Experience Discussion of project theme was often fruitless as the “right people” Discussion of project theme was often fruitless as the “right people” were not involved either concerning content or budget were not involved either concerning content or budget Companies answered “No” without giving any feedback on Companies answered “No” without giving any feedback on what theme(s) might rather be of interest what theme(s) might rather be of interest Companies hesitate to give out ideas of what to do research on Companies hesitate to give out ideas of what to do research on due to competition (especially in exploration) due to competition (especially in exploration) Result Not a single project was initiated Not a single project was initiated

Future Challenges in Cooperative Petroleum Research Consortium: Norwegian Sea 18 th Round and Beyond Structural geology Reservoir Prediction Bio - stratigraphy Basin modelling Seismic Imaging Harald Brekke Tore Høy Robert Williams Christian Magnus Arild Haugen

Future Challenges in Cooperative Petroleum Research BiostratigraphySedimentologyRock Properties *Link to geophysics, rock properties. Biofacies Biostrat/dating Depositional model. Paleogeographical maps. Core descriptions Trace Fossils (Atlas?) N/G distribution Petrography Diagenesis Clay minerals* Provenance Structural Geology? Seismic interpr. Key data ? Norwegian Sea (Lysing/Lange) Research Consortium Budget estimate pr. year; 2000 kNOK kNOK (forskningsråd)

Future Challenges in Cooperative Petroleum Research Norwegian Sea Research Consortium (NOSE RES-Q) The aim of the project is to address two main un- certainties in the exploration process Interest from technical people, but need to be aligned with the funding process within the companies The absence of mineralogical input to a "rock properties" model for the The absence of mineralogical input to a "rock properties" model for the Upper Cretaceous (shale rock properties in particular), enhancing Upper Cretaceous (shale rock properties in particular), enhancing seismic attribute evaluation seismic attribute evaluation Methodologies to predict sand-presence in a distal/basinal setting Methodologies to predict sand-presence in a distal/basinal setting

Future Challenges in Cooperative Petroleum Research Why? Lack of interesting themes Lack of interesting themes Lack of money Lack of money Conclusion Action has been taken, but success is lacking Action has been taken, but success is lacking

Future Challenges in Cooperative Petroleum Research Needs Agreement on themes for research among oil Agreement on themes for research among oil companies that address the technology needs companies that address the technology needs Commitment from high-level management Commitment from high-level management Communication of agreed themes to research Communication of agreed themes to research institutions institutions

Future Challenges in Cooperative Petroleum Research Focus this year’s seminar on Mechanism of cooperation

Future Challenges in Cooperative Petroleum Research

Mechanism of cooperation Mechanism of cooperation Need Which leads to initiation of high quality Which leads to initiation of high quality research projects research projects Does there already exist such a mechanism Does there already exist such a mechanism to build on? to build on?

Future Challenges in Cooperative Petroleum Research The absence of mineralogical input to a "rock properties" model for the The absence of mineralogical input to a "rock properties" model for the Upper Cretaceous (shale rock properties in particular), enhancing Upper Cretaceous (shale rock properties in particular), enhancing seismic attribute evaluation seismic attribute evaluation Methodologies to predict sand-presence in a distal/basinal setting Methodologies to predict sand-presence in a distal/basinal setting

Future Challenges in Cooperative Petroleum Research Norwegian Research Council Not enough to increase activity and raise level of research Research institutions Although a list of needs was presented, some project proposals were not aligned according to the list

Future Challenges in Cooperative Petroleum Research Purpose find the right themes for projects find the right themes for projects gain more interest for the project proposals gain more interest for the project proposals Result Not a single project was initiated Not a single project was initiated that address the technology needs Assess themes that address the technology needs Assess themes that address the technology needs