BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.

Slides:



Advertisements
Similar presentations
The Dalles Middle School
Advertisements

COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Board Meeting – May 27,  Communication  Transportation  Maintenance  The Countdown!
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Public Restroom Facilities Public Restroom Facility Goal Goal Objective Objective Research Research.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Campus signage – Internal
September 21 Update. Future Main Entrance (looking south)
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
In 1852 Hiram Lewis built a log cabin school house where the firehouse stands today. It was similar to the one pictured below. The first teacher was.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
STREETSCAPE DESIGN REPORT: SOUTH HOLGATE STREET TO SOUTH KING STREET | ROMA DESIGN GROUP Project Update Seattle Design Commission April 3, 2008.
Direction at your fingertips. A compass rose is a design on a map that shows directions. It shows north, south, east, west, northeast, northwest, southeast,
Help me find the cardinal directions
Community Update James Simons School – October 2,
Finding Your Way in the World
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
Elevations.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Noise analysis- operations 6 ft. panel on west side of guide way 4 ft. panel on east side of guide way.
Board Meeting – June 24,  Communication  The Countdown!
all images courtesy preston scott cohen preston-scott-cohen- tel-aviv-museum-of-art-complete.html.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Building Plans.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
Julius West Middle School Construction Updates
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
Competency: Draw exterior elevations
St. Cloud High School Phased Comprehensive Construction Project April 28,
United States Regions By :. Regions of the United States (insert picture)
North Augusta High School Design Development Presentation.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
Find that place..  Find that content  Longitude, East is to the right, West is to the left of the Prime Meridian or 0 degrees  Latitude, North is going.
In this map you will be asked a series of yes or no questions to see if you following the right path.
Projection, Distortion, Map Quadrants & Sandalwood Map Learning Objectives – Student understands map projection & distortion – Student understands map.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
Cupid Shuffle.  Everyone find a line on the floor and face the stage.  Now put your arms stretched out to your sides, you should not be able to touch.
165 Partners, LLC. ALR Westgate Development-The Landings Russell County August 30, 2011 DP.
Special Mention: Main Gymnasium Second Floor East: Technically Inaccessible Entrance Problems
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UNITED STATES DAILY QUIZ
PRINCE Of WALES First Floor Portable 4 Portable 2 To Mini School
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Principles of a Grid Reference
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
THE DEVON ENERGY AUDITORIUM
Inspire Elementary School
AARNA Progress Report-June 2017
5b. Value of private nonresidential construction, by region, (Current dollar value)
Competency: Draw exterior elevations
Helping Georgians Achieve
Minuteman Vocational Technical Regional High School Progress
Multi-storeyed Car Parking-cum- Commercial Complex at Nehru Place, New Delhi PROJECT DETAILS : This multistoreyed car parking and centrally airconditioned.
Map & Compass Skills.
北 N north 西 W west 東 E east south南 S.
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance

Minuteman Vocational Technical Regional High School Progress
29th & Choctaw Rd Project Projected time line.
Mandeville Center Upper Level West: Interior Inaccessible Element
North Augusta High School – Phase 2A and 2B
2011 Exhibition of School Planning and Architecture
Strickland Middle School
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

BUILDING UPDATE AUGUST 23,2014

BUILDING “A” NORTHEAST VIEW

In side the aux gym - view looking northeast

Main Gym- view from the upper hallway

Main Gym (aux gym to the right)

Aux Gym – view from the hallway Note the precast concrete floor panels

Upper hallway between the Main Gym (to the left) and Aux Gym (to the right)

Upper Hallway from the gyms back to the Building A (looking east) Auditorium and cafeteria on the right of the hallway.

Construction of the main lobby connecting Building A (to the right) to Buildings C and D (to the left) View from the south.

Upper hallway from Building A to auditorium and gyms (looking west)