POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning www.ercot.com.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

Houston Region Import Capacity Project Planning for Reliable Power.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Regional Planning Group Charter Revisions May 2008.
Regional Planning Group Project
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to WMS Austin, TX August 10, 2011 Kenneth A. Donohoo, P.E.
OPERATING IN THE EAGLE FORD SHALE
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Houston Area Dynamic Reactive Project March 11,
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Texas Regional Entity Compliance Report TAC July 9, 2009.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Governance and Legal Issues Margaret Uhlig Pemberton General Counsel and Corporate Secretary Media Day Austin, Texas September 13, 2001.
Lyndonville Electric Department Feasibility Analysis Review December 2,
McCAMEY 345 kV TRANSMISSION PLAN Presentation to Technical Advisory Committee May 8, 2003 KENNETH A. DONOHOO, P.E. Manager, System Planning Transmission.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC 10/09/2003 KENNETH A. DONOHOO, P.E. Manager of System Planning Transmission Services
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 21, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Kurten Switch Project ERCOT Board of Directors Bill Bojorquez System Planning December 13, 2005.
March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Benefits of Transmission Ownership Bob Johnston CEO of MEAG Power.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
How the Transmission System Works Really William F. Reinke.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Application for Permanent Metering Exemption 1 Fayette Power Project Backfeed.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
NMT – Network Operations Modeling & Telemetry - Project
Freeport Area Master Plan Project -
Nacogdoches to Lufkin SS 345 kV Line Project
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
Compliance Report to ERCOT BOD December 2006
Director, Transmission Services
Warren Lasher Manager, Long-Term Planning and Policy
Modifications to Planning Charter
Oncor Electric Delivery Company LLC
BHP 2017 Formula Rate True-Up Meeting
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Presentation transcript:

POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning

© ERCOT 2004 KAD 09/09/2004 TAC ACTION ITEM Coordinate a review of and possible changes to the Tier 1 Projects Review Process – (5/6/04)

© ERCOT 2004 KAD 09/09/2004 OPEN PROCESS Update was developed and ed to Region Planning Groups (RPG) for comment/review on July 12 Comments were received on July 27 CenterPoint (CNP) Bryan Texas Utilities (BTU) PUCT Staff TXU Energy TXU Electric Delivery TECO EnergySource Flint Hills Resources (industrial consumer) Lower Colorado River Authority (LCRA) South Texas Electric Coop (STEC) Brownsville Public Utility Board (BPUB) City Public Service San Antonio (CPS) Austin Energy (AEN) Assembled and ed to RPGs July 27 RPG meeting to review and discussion August 3

© ERCOT 2004 KAD 09/09/2004 PLANNING PROCESS Project Submission And Review Requirements Small Projects - “Tier 1” (60 kV to 138 kV projects) Projects requiring a Certificate of Convenience and Necessity (CCN) from the PUCT Includes exempt municipal & electric cooperatives projects under what-if test Except for any project for which the CCN has been approved or a Public Participation Meeting has already been conducted prior to August 15, 2004 Projects that have an estimated capital cost greater than $10 million To facilitate communication and coordination of projects among the RPG members, members can individually request and review any project below this level Projects having a projected in-service date after June 1, 2006 Exempt Projects Construction to connect a new substation or accommodate load growth in an existing substation Replacement of line terminal equipment, such as switches, current transformers, circuit breakers, and wave traps Addition or replacement of reactive power sources (capacitors and reactors) not capable of dynamic response

© ERCOT 2004 KAD 09/09/2004 PLANNING PROCESS Project Submission And Review Requirements Large Projects - “Tier 2” (345 kV and higher projects) Any projects requiring PUCT certification (CCN) Includes exempt municipal & electric cooperatives projects under what-if test Except for any project for which the CCN has been approved or a Public Participation Meeting has already been conducted prior to August 15, 2004 ERCOT Staff independent review/study Submit to ERCOT Board for endorsement Exempt Projects Construction to connect a new substation or accommodate load growth in an existing substation Replacement of line terminal equipment, such as switches, current transformers, circuit breakers, and wave traps Addition or replacement of reactive power sources (capacitors and reactors) not capable of dynamic response

© ERCOT 2004 KAD 09/09/2004 OTHER ITEMS Alignment of charter to Standard Generation Interconnection Agreement (SGIA) requirements ERCOT provide estimated transmission project cost information Total by year By Region Planning Group by year By kV service level by year By transmission owner by year (subject to approval) Also provides breakdown of circuit miles of line, transformer capability, reactive capability and circuit breakers General clarifications

© ERCOT 2004 KAD 09/09/2004 QUESTIONS/DISCUSSION