Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.

Slides:



Advertisements
Similar presentations
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
Russ Rucinski, FNAL, Oct. 8, MICE Cryostat Status 1.Prototype cryostat A. Status & Plans B. Parts C. Operating data (supplemental) 2.Four final cryostats.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005.
Cryo Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
1 MICE Status UKNF Meeting 3rd May 2006 Malcolm Ellis.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
MICE Phase 1 Koji Yoshimura KEK June
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working.
Completion of the MICE-US construction project
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
AFE II Status First board under test!!.
Muon Recording Studies and Progress for the MICE Tracker
Presentation transcript:

Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross

Cryo Update I  The cryo-system for the VLPCs has been operated extremely reliably and stably from May 05, through the end of the KEK TB and now for about 2 months again at Fermilab  However, it was felt that the thermal-link design could be made more robust u A bolted concept has now been detailed and will be used in all subsequent systems s Modulo one problem u Vacuum tests on the bolt to envelope weld were successful  The drawing package is complete and we have awarded the bid to Ability Engineering for $140k for 4 systems u Does not include s Cryo-coolers s Temperature controlers and sensors s Lid Heater circuitry s Cassette He gas system

Cryo Update II

Cryo Update III  However II u Need to solve an assembly problem at upper thermal link

Cryo Update IV  We recently did a tilt test of the system  Operation at 25 o off normal was fine  We observed an approximately 0.3K temperature increase at stage II (5.2  5.5K)  The Cryo-cooler efficiency is degraded when it is operated off-vertical, but this does not present a problem for the MICE VLPC system

Cryo Update V  Excellent temperature stability (spec is  mK)

Cryo Update VI  However looking at both cassettes we see that the left-hand cassette is on the edge of being “in control”  Even in the upright position, the LHC will be on the edge with the cryo-cooler compressor operating at 50HZ  REALLY need to solve the thermal link problem

AFE IIt Update  The AFE IIt pre-production boards (15) have now all arrived at Fermilab and 5 or 6 are under test  The first boards came up very quickly u In about 1 hour u No green wires!  TriPt testing is done u Yield is about 80% u More than enough chips for D0 + MICE + Spares for both experiments s Plus second pass could yield more  Expect Production Order to be released soon u New issue with discriminator threshold spread u About 10 week lead for delivery of all boards s But many will arrive earlier  The critical issue for MICE is MICE-specific firmware development for AFE IIt u NOT a Trivial amount of work

AFE IIt

11/17/2015 LED Spectra: AFE1 AFEII 2006Mar21

11/17/2015 AFE IIt Discriminators  Turn on spread seen on the platform – much wider than expected

11/17/2015 AFE IIt Discriminators II  More of same

11/17/2015 AFE IIt Discriminators III  Change in AFPGA firmware – now fixed!

Issues that still Need some Thought  AFE IIt board temperature and bias calibration u Does MICE need a test stand (like D0 has) to do this operation?  LED pulser data u Plan to dismount wavguides and mount a LED pulser or excite the fibers with blue LEDs?  New LVSB Board u Not likely. Existing board looks OK. 6 new boards are being assembled now. s Firmware development still might be needed –May be able to get support for this from Fermilab CD  Rate u If we keep analog and timing information we are limited to:   250 muons per msec of spill –It is possible that clever (extreme) programming of the AFE IIt can push this up a bit. u If we drop analog and timing and only use discriminators, we can run at 7 MHz.