LOGO Capstone Design Economic analysis through line balancing.

Slides:



Advertisements
Similar presentations
Cost Management Chapter 10 Static and Flexible Budgets
Advertisements

Logistics Network Configuration
Engineering Economics Analysis Dr. Nabeel Yousef
Cash Flow Webinar April 25, :00 a.m. – 12:00 p.m. EST.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Profit Planning 4/14/04 Chapter 9. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Planning and Control Planning -- involves developing objectives.
Introduction to Management Accounting Introduction to Management Accounting C H A P T E R 1.
INDUSTRIAL & SYSTEMS ENGINEERING
Forecasting and Short-Term Financial Planning
Supply Chain Management
Should you always use a budget as a tool to guide your spending priorities? 1.Yes 2.No.
 To identify key words from last lesson on Cash flow  To construct a Cash flow forecast using given data (P3)  To analyse performance of Bright Sparks.
SchedulingProducingControllingSchedulingProducingControlling.
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
LOGO Working Process analysis - 3 team 고견석 장금혁 황인성 CapStone Design.
Project Planning and Capital Budgeting
WHAT IS THE FUTURE FOR C&C?
Chapter 41 Cash, Short-term Investments and Accounts Receivable Chapter 4.
Chart Your Course to Business Success On Target Business Intensive: Session 6 May 1, 2012 Advisors On Target 1.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Chapter 4 Process Design.
IE 475 Advanced Manufacturing Costing Techniques
Implementation of international management experience to Ukrainian companies performed: Degtyareva N.V. Supervisor: Magdich A.S., Ph.D. in Economics.
Inventory Planning and Management Chapter 5. Inventories include all tangible items held for sale or consumption in the normal course of business for.
1 Process Analysis and Design Cost Accounting and Profitability Analysis.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
Introduction to Management Accounting Introduction to Management Accounting C H A P T E R 1.
Budgetary Planning and Control
Contemporary Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
MATERI XI PRODUKSI & OPERASIONAL. 5 ISSUES That arise when trying to produce a product or service Capacity (How much can I produce) Scheduling (How am.
Financial Management Back to Table of Contents. Financial Management 2 Chapter 21 Financial Management Analyzing Your Finances Managing Your Finances.
SchedulingProducingControllingSchedulingProducingControlling.
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
1 CHAPTER 4 DEVELOPING A BUSINESS PLAN: BUDGETING.
Operations Fall 2015 Bruce Duggan Providence University College.
PAYMENT SYSTEMS AND WORKING HOURS
FINANCE MODULE. The various subsystems Financial Accounting Investment management Controlling Treasury Enterprise controlling.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
Corporate Income Taxes
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
LOGO Capstone Design Economical analysis of Decrepit equipment change Team No.1 Presenter 이호정.
Chapter 1 Introduction EIN 3390 Manufacturing Processes Summer A, 2012.
SchedulingProducingControllingSchedulingProducingControlling.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Chapter 7: Manufacturing Processes
Introduction to Management Accounting
Tutorials week 49 Amsterdam Business School
CHAPTER 9 Lean Manufacturing.
Introduction to Cost Accounting and the Job Order Cost Cycle
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
Chapter 3: Cost Estimation Techniques
Process Economics Factors that affect profitability
Establishing a New Production Line at National Carton Industry Company
DEVELOPING A BUSINESS PLAN FOR A MANUFACTURING COMPANY: BUDGETING
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
How to Pass SMRP (Society of Maintenance
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
LOGISTICS NETWORK.
Production Planning and Control
ACC 560 HELP Education Your Life--
ACC 560 MART Lessons in Excellence-- acc560mart.com.
Cost Accounting-I Recording System.
KEWIRAUSAHAAN MATERI IX PRODUKSI & OPERASIONAL.
Budgeting for Planning and Control
FACILITY LAYOUT Facility layout means:
Classification of Cost
Manufacturing Production Planning
Conversion Process Master It
Presentation transcript:

LOGO Capstone Design Economic analysis through line balancing

LOGO Contents Introduction to Team members & Topic 1 Reason of topic selection 2 Market conditions 3 Progress direction of project 4 Schedules 5

LOGO Introduction to Team members & Topic 1 Lee ho jung (Master) Visit to field, Collection of data, Report drawing up Choi ji ung (Member) Visit to field, Collection of data, Report drawing up Chun jin won(Member) Data arrangement, Report drawing up Economic analysis through line balance

LOGO Capstone Design Engineering Economics Quality Control Production Management Senior Junior Reason of topic selection 2 Productivity, Line-Balance, Plant Management Reliability, Defective ratio Investment analysis Utilize all of IE’s tools

LOGO Market conditions 3 Increase over last year 27.1 % Increase over last year 27 % 자료출처 : 통계청 광업ㆍ제조업 통계조사 보고서

LOGO Market conditions 3 Distinction Number of companies Production Amount(1million won) shipment Amount(1million won) Yearly average Yearly average Growth rate Yearly average Yearly average Growth rate Yearly average Yearly average Growth rate %1,822, %1,825, % 자료출처 : ( 주 ) 밸류애드

LOGO Error process Process Form Grasp Line-Balance Productivity Defective Ratio Analysis Analysis of economy The direction of project 4

LOGO Week Report the plan Visit to field Process form grasp Error process analysis Productivity analysis Line-Balance analysis Simulation modeling Economical evaluation Resultant report Schedules 5

LOGO

Capstone Design Economic analysis through line balancing

LOGO Contents Introduce to Company 1 Production Flow 2 Analysis by Process 3 4 Schedules

LOGO Company Introduction 1 Company Name : Dongyang Inotek Owner : Yang jong-hyeon History : Established in 2007 Manufactured Items : Washing machine Shaft Last year Sales : 6 billion Location : ok-dong, gwangsangu

LOGO Production Flow Factory inside photo 2

LOGO Production Flow MaterialsCentering Process Lathe turning Process Heat treatment Process Press-in Process Form rolling Process Polishing Process TAP Process Product 2

LOGO Analysis by Process 3 Process Name : Centering Process Drill holes on both sides of materials center

LOGO Analysis by Process 3 Process Name : Lathe turning Process Using a CNC lathe machining

LOGO Analysis by Process 3 Process Name : Heat treatment Process Heat treatment

LOGO Analysis by Process 3 Process Name : Press-in process Put the bearings

LOGO Analysis by Process 3 Process Name : Form rolling Process Screw Machining

LOGO Analysis by Process 3 Process Name : Polishing Process Trim surface

LOGO Analysis by Process 3 Process Name : TAP Process Screw Machining

LOGO Week Report the plan Visit to field Process form grasp Error process analysis Productivity / Defective ratio analysis Line-Balance analysis Simulation modeling Economical evaluation Resultant report Schedules 4 4 PlanRun

LOGO

Capstone Design Economic analysis through line balancing

LOGO Contents Working time & Production volume 1 Error process analysis 2 Defective ratio & Productivity analysis 3 4 Schedules

LOGO Working time & Production volume 1 Weekday = 36,600 sec / day(10hour 10min) Saturday = 27,600 sec / day(7hour 40min) A month Working hours = 22(day) X 36,600(sec) + 4(day) X 27,600(sec) = 805,200(sec) + 110,400(sec) = 915,600(sec)=254hour 20min Average monthly production = 8,100 EA Average daily production = 312 EA Heat treatment process Press – in process Form rolling process Polishing process TAP process Lathe turning process Centering process (1 machine) (2 machine) (1 machine)

LOGO Error process analysis One Process – One machine Time(sec) Process name 2

LOGO Error process analysis Actual Process : Used 2 lathe turning machine Time(sec) Process name 2

LOGO Defective ratio & Productivity analysis 3

LOGO Week Report the plan Visit to field Process form grasp Error process analysis Productivity / Defective ratio analysis Line-Balance analysis Simulation modeling Economical evaluation Resultant report Schedules 4 4 PlanRun

LOGO

Capstone Design Economic analysis through line balancing

LOGO Contents Calculation of objectives cycle-time 1 Calculate the minimum workplace 2 Relationship between number of equipment and line efficiency 3 4 Schedules

LOGO Calculation of objectives cycle-time Process flow photo 1

LOGO Calculation of objectives cycle-time 1 (Day at work) 3,125 EA per month 5,625 EA per month (Day and night work) (Day at work) 3,125 EA per month 3,125 EA per month 14,580 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month

LOGO Calculation of objectives cycle-time 1 1month production : 8,100 EA Sum of production day work : 8,100 EA X 9 month = 72,900 EA Sum of production night work : (8,100 EA X 1.8) X 3 month= 43,740 EA 1year total production : 72,900 EA + 43,740 EA = 116,640 EA Currently cycle-time : 293 sec per 1EA Objective tact-time : 915,600 sec / 9,720 EA = sec per 1EA 1month production objectives : 116,640EA / 12month = 9,720 EA Day and night 1month production work : 8,100 EA X 1.8= 14,580 EA

LOGO Calculate the minimum workplace 2..

LOGO Calculate the minimum workplace 2 Process name Time(Sec) 1 machine 4 machine 1 machine ※ Note : Currently Efficiency = %..

LOGO Relationship between number of equipment and line efficiency Cycle-time Number of equipment Efficiency % % % sec sec 243 sec 293 sec 208 sec % Centering : 25 sec (1 machine) Lathe turning : 40 sec (5 machine) Heat treatment : 40 sec (1 machine) Press-in : 25 sec (1 machine) Form rolling : 35 sec (1 machine) Polishing : 18 sec (1 machine) TAP : 25 sec (2 machine) Total : 208sec (12 machine) Centering : 25 sec (1 machine) Lathe turning : 28.6 sec (7 machine) Heat treatment : 20 sec (2 machine) Press-in : 25 sec (1 machine) Form rolling : 17.5 sec (2 machine) Polishing : 18 sec (1 machine) TAP : 25 sec (2 machine) Total : 159.1sec (16 machine)

LOGO Week Report the plan Visit to field Process form grasp Error process analysis Productivity / Defective ratio analysis Line-Balance analysis Simulation modeling Economical evaluation Resultant report Schedules 4 4 PlanRun

LOGO

Capstone Design Economic analysis through line balancing

LOGO Contents Correction contents 1 2 Simulation modeling 3 4 Result & Analyze Raw data for simulation Schedules 5

LOGO Correction contents 1 Average monthly production = 8,100 EA Working time per month = 915,600 / sec Total production of 1 year = 116,640 EA Objective monthly production = 116,640 / 12 = 9,720 EA

LOGO Correction contents 1 (Day at work) 3,125 EA per month 5,625 EA per month (Day and night work) (Day at work) 3,125 EA per month 3,125 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 14,580 EA per month 14,580 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 14,580 EA per month Used 2 lathe turning machines

LOGO Correction contents 1 (Day at work) 3,125 EA per month 5,625 EA per month (Day at work) 3,125 EA per month 3,125 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 14,580 EA per month 14,580 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 9,720 EA per month 9,720 EA per month 9,720 EA per month 9,720 EA per month Used 3 lathe turning machines

LOGO Raw data for simulation Number of equipment to satisfy seconds Time(sec) Process name / sec Used 3 Lathe turning machines cycle time = sec 3,125 EA per month 8,100 EA per month

LOGO Raw data for simulation 3,125 EA per month 8,100 EA per month 9,720 EA per month Each process cycle time & process form Working hours a day 3,125 EA per month 8,100 EA per month Week : 36,600 sec Weekend : 27,600 sec Objective Tact-time = sec Centering : 25sec Lathe turning : 200sec Heat treatment : 40sec Press-in : 25sec Form rolling : 35sec Polishing : 18sec Tap : 50sec 2

LOGO Simulation modeling Used 2 lathe turning machines Time constraints Constraints for only one hour’s operation Input the raw material throughout the lathe turning process Finished product from heat treatment 3

LOGO Simulation modeling Used 3 lathe turning machines 3

LOGO Result & Analyze 3,125 EA per month 5,625 EA per month 3,125 EA per month 3,125 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 9,720 EA per month Used 2 lathe turning machine 4

LOGO Result & Analyze 3,125 EA per month 5,625 EA per month 3,125 EA per month 3,125 EA per month 8,100 EA per month 8,100 EA per month 8,100 EA per month 9,720 EA per month Used 3 lathe turning machine 4

LOGO Week Report the plan Visit to field Process form grasp Error process analysis Productivity / Defective ratio analysis Line-Balance analysis Simulation modeling Economical evaluation Resultant report Schedules 4 PlanRun 5

LOGO Simulation model 3,125 EA per month 8,100 EA per month Show the simulation model

LOGO

Capstone Design Economic analysis through line balancing

LOGO Contents Raw data for economical analyze 1 2 Economical analyze 3 4 Result Method of economical analyze Schedules 5

LOGO Row data for economical analyze 1 Machine investment cost New Lathe Turning machine 66,000,000 won Payment (Unit : won) Minimum wage : 4,320 Weekend / Over time : 4,320 x 1.5 = 6,480 Night at work : 4,320 x 2 = 8,640

LOGO Row data for economical analyze 1 Wage calculation Weekday(1worker) : 34,560(8h) + 16,200(2h 30m) = 50,760 50,760 x 22(day/month) = 1,116,720 Weekend(1worker) : 6,480 x 8 = 51,840 51,840 x 4(day/month) = 207,360 1year = 10,592,640 x 12(month) = 127,111,680 1month = 1,324,080 x 8(worker) = 10,592,640 1worker wage / month = 1,116, ,360 = 1,324,080 Increase machine / year = 1,324,080 x 9(worker) = 143,000,640

LOGO Row data for economical analyze 1 Night at work wage calculation PM 20:00 ~ PM 22:00 : (4,320 x 1.5) x 2 = 12,960 PM 22:00 ~ AM 06:00 :(4,320 x 2) x 8 = 69,120 Sum = 82,080 / day (82,080 x 8(worker)) x 22(weekday) = 14,446,080(month) x 3(month) = 43,338,240 1year(day at work + night at work) = 127,111, ,338,240 = 170,449,920 Minimum wage increase rate Year Increase rate8.3 %6.1 %2.8 %5.1 %

LOGO Row data for economical analyze 1 Warehouse cost estimate Warehouse area : 20(pyeong) Cost : 15,000,000 Incidental expenses middle rack(10EA) = 250,000 x 10 = 2,500,000 Total cost = 15,000, ,500,000 = 17,500,000

LOGO Method of economical analyze Depreciation(Decline-balance method) 2 ND-factorDnBn 00066,000, Bn x factor = 17,085,126Bn – Dn1 =48,914, Dn1 x factor = 12,662,376Bn1 – Dn2 = 36,252, Dn9 x factor. Bn 8 – Dn9 3,300,000(Salvage value) N=Machine’s durable years(10) 0.05 = Salvage value A Compound Interest

LOGO Method of economical analyze Wages calculated according to the wage increase 4ponit moving average 2

LOGO Economical analyze 3 Actual NYearForecast increasePay ₩ 170,449, % ₩ 179,926, % ₩ 188,707, % ₩ 197,331, % ₩ 207,252, % ₩ 217,634, % ₩ 228,236, % ₩ 239,351, % ₩ 251,185, % ₩ 263,553, % ₩ 276,474,386 SUM of payment ₩ 2,420,103,593 Calculate future wage 10 years trough 4point moving average forecast method (Wage increase)

LOGO Economical analyze 3 After YearForecast IncreasePayD-factorDnBn ₩ 143,000, ₩ 66,000, % ₩ 150,951, ₩ 17,085,126 ₩ 48,914, % ₩ 158,317, ₩ 12,662,376 ₩ 36,252, % ₩ 165,553, ₩ 9,384,523 ₩ 26,867, % ₩ 173,876, ₩ 6,955,193 ₩ 19,912, % ₩ 182,586, ₩ 5,154,733 ₩ 14,758, % ₩ 191,481, ₩ 3,820,350 ₩ 10,937, % ₩ 200,805, ₩ 2,831,393 ₩ 8,106, % ₩ 210,734, ₩ 2,098,443 ₩ 6,007, % ₩ 221,111, ₩ 1,555,228 ₩ 4,452, % ₩ 231,950, ₩ 1,152,633 ₩ 3,300,000 SUM ₩ 2,030,369,757 ₩ 62,700,000 ₩ 66,000, SUM of pay and total depreciation value (1) ₩ 2,093,069,757 SUM of (1) and Warehouse investment ₩ 2,110,569,757 Machine’s cost basis : 66,000,000 66,000,000 x ,914,874 x ,252,498 x ,867,975 x ,912,782 x ,758,049 x ,937,698 x ,106,305 x ,007,862 x ,452,633 x ,000, ,085,126 48,914, ,662,376 36,252, ,384,523 26,867, ,955,193 19,912, ,154,733 14,758, ,820,350 10,937, ,831,393 8,106, ,098,443 6,007, ,555,228 4,452, ,152,633 2,030,369, ,700,000 2,093,069, ,500,000

LOGO Result Actual 4 After NYear Forecast Factor Pay ₩ 170,449, % ₩ 179,926, % ₩ 188,707, % ₩ 197,331, % ₩ 207,252, % ₩ 217,634, % ₩ 228,236, % ₩ 239,351, % ₩ 251,185, % ₩ 263,553, % ₩ 276,474,386 SUM of payment ₩ 2,420,103,593 YearForecast FactorPayD-factorDnBn ₩ 143,000, ₩ 66,000, % ₩ 150,951, ₩ 17,085,126 ₩ 48,914, % ₩ 158,317, ₩ 12,662,376 ₩ 36,252, % ₩ 165,553, ₩ 9,384,523 ₩ 26,867, % ₩ 173,876, ₩ 6,955,193 ₩ 19,912, % ₩ 182,586, ₩ 5,154,733 ₩ 14,758, % ₩ 191,481, ₩ 3,820,350 ₩ 10,937, % ₩ 200,805, ₩ 2,831,393 ₩ 8,106, % ₩ 210,734, ₩ 2,098,443 ₩ 6,007, % ₩ 221,111, ₩ 1,555,228 ₩ 4,452, % ₩ 231,950, ₩ 1,152,633 ₩ 3,300,000 SUM ₩ 2,030,369,75 7 ₩ 62,700,000 ₩ 66,000, SUM of pay and total depreciation value (1) ₩ 2,093,069,75 7 SUM of (1) and Warehouse investment ₩ 2,110,569,75 7 Salvage Value 0.05% Total Depreciation value

LOGO Result 4 Alternative A(Operation like present) For worker wages during 10 years the future 2,420,103,593 won occurrence Alternative B(1 Equipment and 1 workers increase) As equipment investment expense, worker wages and warehouse investment expense during 10 years the future 2,110,569,757 won occurrence So, it is reasonable that select alternative B

LOGO Week Report the plan Visit to field Process form grasp Error process analysis Productivity / Defective ratio analysis Line-Balance analysis Simulation modeling Economical evaluation Resultant report Schedules 4 PlanRun 5