1 -Classification: Internal 2011-01-19 Gullfakslandsbyen 2011 Knut.

Slides:



Advertisements
Similar presentations
Classification: Internal GullfaksVillage2010 Gullfaks Sør Omega Project Some cost data and economic assumptions.
Advertisements

Companies can suffer numerous problems due to poor management of resources and careless decisions. In real-world decision- making, many organizations lack.
Project Management Framework May 2010 Ciaran Whyte Risk Administrator Planning & Strategic Projects Unit.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 -Classification: Internal DROPS forum 1. June 2011 New topic from the Safe Rig project STATOIL, FORUS.
Network Design and Implementation
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
ClASS MODULES: BREAKOUT SESSIONS. ClASS FINANCIAL MODULE.
SEM A - Operations PE - Utilize project-management skills to improve workflow and minimize costs. PI - Develop a Project Plan.
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
Rune Instefjord Project leader, Gullfaks IOR
Staff Structure Support HCCA Special Interest Group New Regulations: A Strategy for Implementation Sharon Schmid Vice President, Compliance and.
Systems Analysis – ITEC 3155 Feasibility Analysis
Chapter 14 Information System Development
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
Uncertainty management in Statoil (Risk and opportunity management)
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Business Plan.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
RISE Grant: Proposal Writing Workshop UAF RISE Board February 21, 2014.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
ENVIRONMENTAL FACT MATTERS ! EIFair AS, Pob 66, N-2027 Kjeller, Norway Phone: ,
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
Preparing A Business Plan. Objectives By the end of this topic, you should able to understand: 1) Definition a business plan 2) the important of BP 3)Major.
Lockheed Martin Aeronautics Company Candidate Collaborative Projects for Net-Centric Application Michael F. Siok, PE Lockheed Martin Aeronautics Company.
1 -Classification: Internal Painting the pores Gullfaks Diverging Pilot Well A-35 Author: Rune Instefjord,
Component 4: Introduction to Information and Computer Science Unit 9/Part f: Components and Development of Large Scale Systems.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Classification: Internal Understanding and Handling Residual Risks SPE Annual Technical Conference, Denver 2011 John Zhao, MSc.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Copyright © 2007 Pearson Education Canada 7-1 Chapter 7: Audit Planning and Documentation.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
Classification: Internal Status: Draft Gullfaks Village 2010 IOR Challenges.
Project Proposal ELEC 421 The initial document that converts an idea into details of a potential project, including the outcomes, outputs, major risks,
Terms of reference Classification: Internal.
1 1 Presenter / date if required Independent, integrated thinking.
Paper Title Authors names Conference and Year Presented by Your Name Date.
Internal Sales Overview Obtaining Approval to Conduct Internal Sales.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Project Selection Models 1. 2 Strategic Management and Project Selection Maturity of Project Management Criteria for PS Models Nature of PS Models Types.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
CUNA Mutual Group’s Quality Assurance Process In the context of Solution Delivery.
A Software Engineering Model Based Curriculum Development Approach Leon Pan University of the Fraser Valley.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Patricia Alafaireet Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health.
Introduction to Well Completions
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
The application of quantitative risk analysis (QRA) techniques for well construction in complex reservoirs West Vanguard Snorre cross-section.
Chapter 1 Introduction to management accounting
Translating ideas into proposals for action programmes
INTERNAL JOB BULLETIN Closing date: 30/04/2011
Input to project from IIP
Visit to Statoil Sandsli, Bergen 8. February 2012
Business System Development
Module 1 Assemble the WSP team
HR Business Partner Individual Development Plans
ACC 544 Education for Service-- snaptutorial.com
Improve Phase Wrap Up and Action Items
Group 3/4.
Noor Vergeer, Wojtek Kalocinski Border management and Schengen
Accelerating the Deployment of Offshore Renewable Energy Technologies - Project Proposal - Michael Paunescu Renewable and Electrical Energy Division.
Translating ideas into proposals for action programmes
Enterprise Content Management (ECM) Project
How to increase the oil recovery in GFS Statfjord ?
Presentation transcript:

1 -Classification: Internal Gullfakslandsbyen 2011 Knut

2 -Classification: Internal Challenge 2. Drilling of a long reach water injector A new water injection well to the Beta ridge is being planned from the Gullfaks B platform. Planning the well is ongoing. A good well project is often “drilled on the paper” before initiated offshore. Describe a possible route from “drilling the well on paper”. The drilling industry has the last 5 years established remote expert team onshore. Describe how the Statoil should perform the expert team solution. Make a recommendation about which measures Statoil need to take in order to be able to drill these wells to Gullfaks Sør Statfjord. Statoil advisor: Johan Eck-Olsen

3 -Classification: Internal Specific requirements to planning Organizing the detailed planning phase Work process description Project schedule Peer Assist and Peer Review Detailed 15 minutes plan Decision and task log Risk Assessment Check list Decision trees and contingency plan Detailed drilling and well program Best Practice

4 -Classification: Internal Evaluated in Peer Assist and Peer Review Project plans Statoil relevant governing documentation Authorities rules and regulations Budget, based on uncertainty simulations Score board Programs Procedures Risk identification log Decission trees Pros and cons for different scenarioes and cases

5 -Classification: Internal DWB WIB - Well Interventions Bergen Well Interventions Manager DWB WIB Torstein Haugland Bergen Gullfaks 1 DWB WIB WG1 Knut Müller Bergen Gullfaks 2 DWB WIB WG2 Njål Grønnerød Bergen Oseberg DWB WIB WOO Hans Morten Koldal Bergen North Sea 1 DWB WIB NS Gunnar Halle Daae Bergen North Sea 2 DWB WIB NS2 Stephen Stragiotti Bergen DWB WIB PI Well Interv. Plan Dep. Jens M. Wennesland Bergen

6 -Classification: Internal D&W DWB WIB, Activity 2010 pr Operations: 65 Operations: 20 Operations: 31Operations: 32

7 -Classification: Internal

8 -Classification: Internal

9 -Classification: Internal Coiled Tubing

10 -Classification: Internal Stimulation Vessel

11 -Classification: Internal Mechanical WL/ Electrical WL/Traktor

12 -Classification: Internal Challenge 3a. PLT in Gulltopp Gulltopp is a 10 km well drilled from Gullfaks A platform. The well had water breakthrough after two years of production and it is now desirable to find out from which zone the water is coming. Explain the PLT technology and how a Production logging tool (PLT) can improve the oil recovery at Gulltopp. Plan a detailed PLT job for Gulltopp. (This includes simulations and detailed PLT procedure) Make a cost estimate based on information from vendors, and show economics before tax including Net Present Value. Statoil advisor: Knut Müller

13 -Classification: Internal

14 -Classification: Internal Challenge 3b. WL operations bellow the rig on GF. The three Gullfaks platforms have two shafts with wells. Well operations and drilling can then work independent. When production wells has to be shut in due to barrier problems on the same shaft as drilling is doing their work, it would be beneficial to secure this well properly without stopping drilling operation. Explain equipment for rigging up WL bellow the rig. What are the main issues for running WL bellow the rig? What are the financial benefits of running WL bellow the rig? Statoil advisor: Knut Müller.

15 -Classification: Internal Wells on GFA

16 -Classification: Internal

17 -Classification: Internal Presentation title Presenters name Presenters title address, tel: Thank you