Utilizing High-set Load Shedding Schemes (UHSLSS) to Replace Responsive Reserve Obligation Juan S. Santos (512) 248-3139

Slides:



Advertisements
Similar presentations
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Advertisements

BAL-002-WECC-1 Contingency Reserves
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
GENERATOR PROTECTION.
Resource Data Needed For Dynamic Simulations
ERCOT Staff Facilitator Juan S. Santos Senior Consultant, System Planning Technical Operations WIND GENERATION STABILITY MODELING TASK.
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Recent ERCOT Events Lessons Learned
Active Power and Frequency Control
Transferring Inductive Type Loads John J. Stark Marketing Services Coordinator, Russelectric Inc. (Refer to Russelectric Technical Brief: “Eliminating.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Frequency Control Turbine Governor Droop NERC Requirement
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
Synchrophasor: Implementation,Testing & Operational Experience
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
WECC Load Model Sensitivity Study “ An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads ” Task.
April 23 rd OWG UFLS Survey & Power Factor Review.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
My Time in CURENT Graham Treasure. Quick Recap First semester – Electrical theory – Introduction to programming – I already gave this talk Second Semester.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
Managing Reliability and the Markets with PI
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Network design Topic 6 Testing and documentation.
Operations Report Kent Saathoff System Operations ERCOT.
GAS TURBINE COMBINED- CYCLE GENERATION POWER PLANT STABILITY MODELS AND MODEL VALIDATION Juan S. Santos Senior Consultant, System Planning.
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
UFLS Survey Explanation
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
Minnesota Renewable Energy Integration and Transmission
Grid Operations Update
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Reactive Power Task Force
Presentation transcript:

Utilizing High-set Load Shedding Schemes (UHSLSS) to Replace Responsive Reserve Obligation Juan S. Santos (512) Senior Consultant, System Planning Technical Operations Study Scope Review

Topics From the Study Scope Objective of study Method Of Analysis Study Approach by tasks Report and Criteria for acceptance Estimated Cost and Timeline

Objective of Study The current ERCOT rule allows for 25% of the ERCOT 2300 MW Responsive Reserve Obligation stability classification, or 575 MW, of interruptible load tripped at 59.6 Hz to be substituted for responsive reserve. The objective of this study is to investigate how much of this limit can be increased without significant negative impacts on the ERCOT system.

Method Of Analysis This study will compare the effects of replacing increasing amounts of responsive spinning reserve with hi-set interruptible loads set to trip by automatic relays with a time delay of not more than 20 cycles. Study will monitor, frequency, bus voltage, rotor angles, speed, megawatts, mega-vars, terminal voltage, and exciter field voltage. Study will also scan for any out of step conditions. A solved load-flow case will be saved and examined for abnormal network conditions at the end of the dynamic simulation period.

Task 1 – Assembly And Sanity Check Of Data Data of the base models will be provided by TSP’s 2002 spring and summer cases Data in PTI PSS/E format will be assembled by ERCOT staff – flat start Data collection and sanity checking  Powerflow  Dynamic initialization  Any data questions or problems identified will be brought to the attention of DWG members and resolved with recommended modifications approved by DWG Data does not include boiler models (simulations limited to 15 sec) Loads to used as is without scaling them to match the actual ERCOT loads on any given day.

Task 2 – Development Of Scenarios And Criteria Four scenarios will be assembled representing increasing levels of HSLSS High Set Load Shedding Schemes Base Case – 100% of spinning reserves as “real” generation. Case 2 – Use High-Set Load Shedding Schemes (HSLSS) to replace 50% of the Spinning Reserve. Case 3 – Use High-Set Load Shedding Schemes (HSLSS) to replace 75% of Spinning Reserve. Case 4 – Use High-Set Load Shedding Schemes (HSLSS) to replace 100% of the Spinning Reserve.

Task 3 – Add/Modify High Set Load Relays Placement of Replacement Reserve Service (RRS) will be set at several different levels: 1. Trip level to be set at 59.7 Hz for 20 cycles. 2. Trip level to be set at 59.8 Hz for 20 cycles. 3. Trip level to be set at 59.9 Hz for 20 cycles. Load RRS to be selected using a non-bias approach based on size and location.

Task 4 – Run Full Analysis for Each Scenarios Case % Case % Case % Case % Level a: 59.7 A1A2A3A4 Level b: 59.8 B1B2B3B4 Level c: 59.9 C1C2C3C4

Report and Criteria Working Group members will write report and recommendations If any scenario studied fails to meet all of the following criteria, it will be considered unacceptable. 1. No abnormal system conditions leading to cascading outages and system collapse. 2. No firm load will be shed. To ensure this the minimum allowable frequency in the study will be shed for that stage. 3. Maximum frequency deviation based on ANSI/IEEE Standard C , Guide for Abnormal Frequency Protection for Power Generating Plants.

Estimated Cost and Timeline This study will require each working group member’s time. Time = Money Will require the formation of working group members who will have to commit a large amount of time. 4 people 12 days or 384 man – hours Work group will meet (min.) four times for three days Report writing will require an additional 160 man-hours