1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

Installation. Indoor Unit Installation Typical Installation.
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
GCSE Valley College Name: Applying New Technologies: Investigating Engineering Products How is a Casio watch in manufactured: Materials.
Installation. Indoor Unit Installation Typical Installation.
B. Donakowski UCB/SSLFIELDS iCDR – MEP Mechanical 1 SPP FIELDS MEP Main Electronics Package Mechanical Packaging Bill Donakowski
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
MEP configuration pros/cons
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
3-4 Sept. 2008EFW INST+SOC PDR141 Electric Field and Waves (EFW) Spin Plane Boom (SPB) Gregory Dalton Space Sciences Laboratory University of California.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
1 Structure (STR) Subsystem Overview Jonah White – STR Co-Lead.
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
10c-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , c - Board Analysis Update Christopher Smith Mars.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
MAVEN CDR May 23-25, 2011 Thermal Considerations for Board Electrical and Mechanical Design Christopher Smith Thermal Engineer Mars Atmosphere and Volatile.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Main Electronics Package
ELong PolyRAD q P1501 Effects of Device Packaging and PC Board Materials on Radiation Dose in the Die Edward R. Long, Jr. Longhill Technologies, inc. Waynesboro,
For Official Use Only; Information herein NOT Approved for Export; Contains Proprietary Protected Information; NOT for Public Release 1 WIPER PDR Stanford,
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
APAR LRU Brick Mechanical Design EOL APAR Team (Jim Ranson – EOL Design and Fabrication Services presenting) EOL APAR Advisory Panel March 2015.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
17-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , PFDPU D. Gordon / W. Donakowski PFDPU Team.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Arizona Space Grant Symposium
Rose Navarro HMI Lead Thermal Engineer
FIELDS MEP Thermal Vacuum Cycling iPER
Baby-MIND Modules & Services
Gayle K. Martin November 14, 2016
Bill Donakowski Mechanical Engineer UCB/SSL
Spacecraft Interface and I&T
Hawkeye Mechanical Design Snapshot
University of California, Berkeley
Design of Distribution Feedbox at LHC P7
Matthew Smith (617) June 27, 2006 Mechanical Design, CRaTER Assembly and Electronics Assembly Critical Design Review Matthew.
GLAST Large Area Telescope
1. Introduction and Overview
Integration and Test Organization Chart
Structures March 13, 2004.
JC22 SERIES CONNECTORS Product Bulletin
GLAST Large Area Telescope:
Bunker Wall Design Wall ESS
Manufacturing Processes
Presentation transcript:

1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight Unit SPP MEP Baseline Design 13/14 NOV 2013 B. Donakowski SPP MEP Prototype Unit

MEP PDR Overview Requirements Challenges Design Overview Design Heritage Interlocking Frame Design Board Layout Control Drawing Daughter Board Details Connectors Fastening Thermal Design FEM Dynamics Analysis Vibration Testing Mass Properties Spacecraft Mounting Ongoing Issues 213/14 NOV 2013 B. Donakowski

MEP Functional Requirements Provide Packaging for 9 different Board Assemblies in common box – LNPS1, LNPS2, MAGo, MAGi, RFS/DCB, DFB, AEB (2x), TDS Modular box arrangement allows individual boxes to be built up independently and taken apart a/r Design/Coordinate/Fab Box Frames with responsible groups – UCB/MN/LASP/GSFC.060” thick Aluminum walls for Radiation Shielding One plane mounting interface to Spacecraft Adequate Structure Integrity (Strength, Dynamics) Optimal thermal path to Spacecraft Electrical Ground to S/C 313/14 NOV 2013 B. Donakowski

MEP Project Requirements Requirements per EDTRD, Analysis/Design – Materials selection, dynamics analysis, structural analysis, venting, EMI/EMC, grounding Testing/Verification – Mass Properties, Vibration, TVAC, Bakeout, Cleanliness 413/14 NOV 2013 B. Donakowski

MEP Challenges Provide common module for different boards Differing functions, connectors, and organizations (UCB/LASP/MN/GSFC) Box will be located in hot environment, must get heat out of box as much as possible (Thermal environment: baseline 65 C) Modular Frames must fit well together into final structural/thermal package All frames must be in-plane for proper interface to Spacecraft Panel Limited Mass Column Grid Arrays require conformance to Steinberg requirements (separation of first natural frequencies of PWB and structure) 513/14 NOV 2013 B. Donakowski

MEP Box Overview 6 Attach surface to Spacecraft Panel 13/14 NOV ” 6.85” 8.25” B. Donakowski 10 X #8 Fasteners 9 Individual Boxes

MAVEN Design Heritage 7 6x Skewers Top EMI Shield over Card- Card Harnesses S/C Bracket Box Vents Connectors on 3 sides of box MAVEN Electronics Box 11 Separate Cards sharing common Frame details Bolted to S/C Bracket on one Box face Box Size: 8.1” Wide x 6.2” Tall x 9.3” Long SPP FIELDS Electronics Box 9 Separate Cards sharing common Frame details Bolted to S/C on one Box face 10x Attach feet to S/C (every other Frame) #8 Fasteners (no shear panels) Box Size: 8.25” wide x 6.85” Tall x 10.0” long 2x Skewers Box Vents Connectors on 3 sides of box 13/14 NOV 2013 B. Donakowski 2 Shear Panels

MEP Typ Box Frame Assy 8 FrameInstrument Connectors EMI Shield Mounting Surface to Spacecraft Intrabox Connectors Screws and Custom Inserts at PCB perimeter Card PWB Daughter Board (DCB, DFB, TDS) 13/14 NOV 2013 B. Donakowski

Box Machined Frame Design 9 Box Frame walls.060” Multiple PCB attach screws to Frame to increase PWB stiffness and provide good thermal conduction path Machined 6061 T6 Al Alloy Machined Frame.85” Pitch (Frame to Frame) Feet for attachment to S/C 2 5-sided Framed Boxes (LNPS) 6X Skewers (#8 Threaded Rod) 13/14 NOV 2013 (OPEN) B. Donakowski 7 Open Framed Boxes Prototype Frame

Interlocking Frames Design 10 Individual Frames bolted together with 6X skewers Detail showing Frame Interlocking Features Each Box can be Pulled From Stack 13/14 NOV 2013 B. Donakowski

Electronics Board Layout Control Drawing 11 Drawing Maintained by UCB Distributed to Electronics Designers Controlling Document for Design Consistency between EE and ME aspects 13/14 NOV 2013 B. Donakowski

PCB Attach Method 1213/14 NOV 2013 Custom UCB designed insert Stainless Steel, Silver Plated Spiralock Threads provide Locking Device Insert soldered to PCB Traces UCB will provide to outside groups B. Donakowski

Daughter Board Details DB Module to be designed/built by SSL Large Chip (RJEX4000 CCGA) at Center Used on DCB, TDS, DFB 13 Custom threaded tool thru threaded inserts applies gentle force at corners to remove DB from MB 4X Custom Tools 13/14 NOV 2013 B. Donakowski Prototype Hardware

Connectors Fastening 14 UCB Custom Connector Nutplate Easier than nuts to assemble no need to get wrench to hold nuts during jackpost torquing Standoffs can be removed one-by-one D-Connector OTS Jackposts Spiralock tapped holes Desirement: Allow Jackposts to be Removed from outside of Box without opening box Material: 6061 T6 Aluminum 13/14 NOV 2013 B. Donakowski

Thermal Design S/C environment is hot—testing at 65 C Boards screwed to Frames at perimeter 2X Screws at PCB center to EMI shield w/ integral posts Attachment frame wet mounted to S/C (TBC) All Exterior Surfaces painted with electrically conductive Black Paint (Aeroglaze Z307) Black Anodize Interior Surfaces Alodine 600 Treatment at Box interfaces (to PCB, SC, other Frames) 15 S/C PCB screwed to EMI Shield (2x) 13/14 NOV 2013 B. Donakowski

Thermal Considerations: Center of PCB EMI Shield with integral posts to PCB provide conductive path from center of PCB Shield screwed to Frames at perimeter 16 Screws at perimeter to frame Integral Posts at Center (fastened to PCB) 13/14 NOV 2013 B. Donakowski

PWB Thermal Design Consider entire heat path Component To Board – All components dissipating more than 50 mW should be looked at by thermal engineer Thermal / Ground / Power Planes – Board dissipated power needs to travel to the frame via conduction in thermal (or ground) planes, then to the frame Board Mounting to Box – Need a good path from thermal planes to standoffs / box lip / wedge locks etc 2 Oz Copper Layers Layouts to be reviewed by thermal engineer 1713/14 NOV 2013 B. Donakowski

MEP FEM Dynamics Analysis Requirements – Project: MEP Box First Natural Frequency > 100 Hz Easy to achieve – Project: PWB First Natural Frequency > 150 Hz Analysis: 190 Hz – Steinberg Design: First Natural Frequency separation of 2X between individual PCB Assys and Entire Box (2 X 195 Hz = 390 Hz) 1813/14 NOV 2013 B. Donakowski

MEP FEM Dynamics Analysis 19 PCB/Spacers/EMI Shield Assy Fixed at Perimeters (to Frame) Fn=195 Hz Entire MEP Box Assy (PCBs/Frames) Fixed at Attach Feet (to S/C) Predict Fn > 500 Hz Preliminary FEM Runs Encouraging Fn > 100 Hz Separation of 2X between PCB and Overall Structure More detailed analysis required With completed LNPSs design Vibration testing of Prototype frames 13/14 NOV 2013 B. Donakowski

Vibration Testing 20 Vibration Testing Performed 01 Nov 2013 Sine Survey Performed – X Axis first mode: 376 Hz (perpendicular to PCBs) – Predict: > 500 Hz Prototype Hardware First Mode frequency Lower than FEM predicts Required 2X frequency separation close Further analysis required 13/14 NOV 2013 B. Donakowski

Mass Properties Current Estimate: Kg Continengency (20%): Kg Current Best Estimate: Kg – (Intrabox Cables included, S/C cables not included) 2113/14 NOV 2013 B. Donakowski

Spacecraft Mounting 22 +Y Interior Panel 13/14 NOV 2013 B. Donakowski

Ongoing Issues EMI shielding of cables on top of Box TBD – Separate Aluminum EMI Shield – Wrapping individual cables with proper shielding FEM – Verify adequate frequency separation between box structure and PWAs Further analysis and test required Continue coordination with outside groups design efforts – LASP/MN: PWA (Connectors, EMI Standoffs, Dynamics, Structural Properties) – GSFC: Box Frame (Interface Geometry to other Frames, Dynamics, Structural Properties) Grounding strap interface (APL to provide straps) 2313/14 NOV 2013 B. Donakowski