Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Federal Reserve Bank of Boston Case Study
The value in mechanical & electrical retrofits What Pays and what Doesnt? What Pays and what Doesnt? June 16, 2011 June 16, 2011 Mark Kesseler Mark Kesseler.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
Energy Sub-Metering for Measurement and Verification
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
The York County School Division Geothermal Heating and Air Conditioning: Is it Worth the Cost?
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Mammoth Product Training
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
2011 National Grid Energy Expo Proprietary & Confidential 1 Energy Management Systems 2011 National Grid Energy Expo April 7, 2011 Assis Flores Account.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Advanced Heat Recovery System Engineering & Science Research Building (ESRB) Economic Analysis Refrigeration Cycle Turbocor TT400 Compressor ESRB constructed.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Class Project Report Sustainable Air Quality, EECE 449/549, Spring 2009 Washington University, St. Louis, MO The Energy Analysis and Carbon Footprint of.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
N O R T H A M E R I C A C O M M E R C I A L TDP
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Marriott Corporate Headquarters
Lighting systems HVAC systems Lighting Equipment HVAC Equipment Miscellaneous loads Envelope Energy Conservation Measures (ECMs)
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Introduction to HVAC Optimization
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Massachusetts Biomedical Industry 1  Largest Employer of Biomed R&D nationwide  Highest Growth in Biopharma Manufacturing in last Decade  2 nd State.
Multi-pipe Systems “An Opportunity To Combine Heating and Cooling”
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Discuss Final Project
David Anderson Mechanical Option
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Energy Efficiency in District Coiling System
The Benefit of Including Energy Recovery System Analysis
Abbas Shirian, PE Certified GeoExchange Designer
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Presentation transcript:

Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired boilers Condensing DHW  One for bathrooms  One for kitchen  Both located close to the loads to reduce piping and pumping energy Building uses less gas than one of the districts existing 8 classroom schools!

Hybrid Chiller Plant Hybrid chilled water system 200 Ton Evaporative cooled chiller and 200 Ton Air cooled Carrier Hap Bin analysis showed peak of 419 tons but load for school year is 206 tons Variable Primary Pumping for CHW & HW circulation Money saved from not needing additional pumps was allocated to convert from 2 pipe change over to a four pipe system

Mechanical Specialties Boiler Room moved to reduce piping estimated $212,000 savings CO2 based DCV controls in all Large Spaces (Green) Building ventilation is DCV based upon space occupancy (lighting occupancy sensors control VAV boxes setback) Energy Recovery Unit for Auditorium as well as DCV

Commissioning Traditional construction commissioning performed by the design engineer: All systems operational The electric utility’s commissioning agent contract was extended to do functional testing after occupancy and within season for equipment.  Within the warrantee year, found issues with many parts of the mechanical systems  Associated suppliers/ vendors extended warrantee due to commissioning documentation  This was money well spent! Design Team Goal: Integrate commissioning throughout the project to assure success in achieving project goals.

Other unique features Johnson Medysis Energy Management System (EMS)  School district allowed sole-source bid to allow connection their five other schools currently using the Medysis system School district has a part time energy manager who assisted in testing and operation of systems Students do much of the energy analysis  Earth Science students monitor CO 2 levels and water collection  Physical science students monitor electric production  Math students graph the data collected from trend logs on EMS and electric production from PV for other students to analyze