Transmission Options for Mariah Project, Phase II 3/10/2010.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
FUTURE Vaughn Nelson Conservation and energy efficiency Renewable energy Carbon trading National Renewable Portfolio Standard US Goal: 20% of electric.
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
System Strength Discussion
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Scandia Wind Southwest LLC Development of large scale windpower Presentation for landowners Bovina May 8th 2009.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
Tres Amigas Presentation Team
North American Strategic Infrastructure Leadership Forum October 12, 2011.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
“Specializing in Operational Excellence” Outsourcing Is it right for you? Texas Technology Showcase Houston, Texas March 18, 2003 Integrated Process Solutions.
Project Value Creation
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
ERCOT PUBLIC 6/17/ LTSA Scenario Results June, 2014.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
1 The Tres Amigas SuperStation VLPGO November 2011.
Aaron Townsend National Renewable Energy Laboratory October 28, 2013 Colorado Rural Electric Association Energy Innovations Summit Energy Storage in the.
THE TRES AMIGAS PROJECT Project Objective, Business Model, and Benefits -ERCOT Presentation Jan 22, 2010 Austin, Texas UNITING THE NATION’S ELECTRIC POWER.
RTWG Report to TAC August 5, 2010 Howard Daniels.
DC Tie Reservation and Scheduling with Mexico Shams Siddiqi representing Sharyland Utilities WMS Meeting May 15, 2007.
Southwest Renewable Energy Transmission Conference May 21, 2010 Jeff Mechenbier Director Transmission & Distribution Planning and Contracts.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
1 The Future of SAPP, WAPP, CAPP, and EAPP – With Inga IEEE GM 2005 San Francisco June 15, 2005 PURDUE UNIVERSITY F. T. Sparrow Brian H. Bowen Zuwei Yu.
Dealing with Green Power Intermittency in the Mexican Electrical Sector Jorge M. Huacuz Non-Conventional Energy Unit Electrical Research Institute Mexico.
20th Century Electric Transmission Grid
GHG, Renewables, and Reliability IEP ANNUAL MEETING SEPTEMBER 29, 2015 Carrie Bentley Resero Consulting
THE TRES AMIGAS SUPERSTATION ENERGY GAME CHANGERS “THE DELIVERERS” FEBRUARY 28, 2011 UNITING THE NATION’S ELECTRIC POWER GRID.
Transmission Issues & Renewables Perspectives of a Wind Developer.
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
02/13/2009 RPG Wind Interconnection Survey Dan Woodfin Director, System Planning.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting June 20 th, 2008 Austin, TX.
Energy Business Solutions Michigan IRP Working Group Meeting July 25, 2005.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
RMR Exit Strategies Update TAC November 6, RMR UNITS.
Battery Storage Systems: A Backward Induction Approach with Multiple Daily Discharging Opportunities Joohyun Cho Andrew Kleit The Pennsylvania State University.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 Transfer Limit Hardening (TLH) Methodology Need to translate the NEEM soft constraint results to fixed transfer limits for futures 2, 3, 5, 6, 7 and.
DG Projections in the Western Interconnection March 15, 2016 Zach Ming, Consultant Nick Schlag, Managing Consultant Arne Olson, Partner.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Future 2 Soft Constraints Transfer Limit Hardening By the NEEM-TX Subteam SSC Meeting June 6, 2011.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
Electrical Maps of Final 3 Futures Stanton W. Hadley 11/9/11.
Enron North America. AC_01_ENA-1 Market-Making + Technology + Scale + Select Assets = Sustainable Competitive Advantage Enron North America North America.
Operations Directors Conference October 9, 2001
Entergy Integration Study Update
North American Markets Status
DG Projections in the Western Interconnection
SunZia Project Description
Electrical Maps of Final 3 Futures
Presentation transcript:

Transmission Options for Mariah Project, Phase II 3/10/2010

Proposed Agenda A Quick Mariah Project Update –Land lease status –ERCOT application –SPP application –Tres Amigas Present Mariah Interconnection Solutions Discuss Potential Mariah/AEP Cooperation: –Interconnection of Sherman/Dallam to Hitchland, Tres Amigas, HPX –Timing –Possibilities for signing letter of intent –Interconnection business model alternatives –Tres Amigas/Hitchland interconnection, possibilities for Mariah interconnection Tallgrass Line And Other Bottlenecks – How can Mariah project contribute to optimum grid solutions Other items

Assumptions Notes 1)Phase I and II installed capacity and actual capacity 1)Phase I 1)Parmer 1250 MW 2)Sherman 1000 MW 2)Phase II 1)Parmer 1750 MW – total 3000 MW 2)Sherman1000 MW – total 2000 MW Actual capacity - 10% Operating reserve (other ancillaries services) -10 % Losses = 80 % installed capacity for sale into the different markets 2)The sales are assumed to be under long-term contracts for energy deliveries that count as renewable energy and therefore will be at prices that include a renewable premium. 3) Any surplus energy produced over the long-term sales will be sold in the local imbalance market, that is SPP, ERCOT or New Mexico (WECC). 4) Transmission lines between Mariah and TASS/ERCOT/SPP are shown in orange and red. Without a full study and optimization of capacity required, required TASS capacity is estimated at: Phase 2: ERCOT–WECC MW SPP–WECC MW ERCOT–SPP MW 5) Optionally, if capacity is available at low prices, 500 MW each for WECC–SPP; SPP–ERCOT; WECC– ERCOT. This will provide operational flexibility. 6) It is assumed that other transmission (shown in green dashed lines) will be built by third parties to access TASS.

Owned by Mariah, built by AEP? Alt. routing, owned by Mariah, built by AEP? Public interconnection between TASS-SPP and TASS-ERCOT? Owned by Mariah, built by Sharyland? Mariah interconnection solutions Parmer ERCOT-Nazareth SPP- Hitchland Dallam TresAmigas SuperStation SPP-Toke? Sherma n Phase I 1250 MW Phase II 3000 MW Phase I MW Phase II MW Phase III MW

Phase II – 2015/2016 In Phase 2, MWF-S (Sherman) is interconnected to SPP through a 2000 MW line. Assume that sales to the East and West are: 1) 300 MW in PJM requiring 300 MW of transmission between MISO & PJM 2) 300 MW in MISO requiring 600 MW of transmission between SPP & MISO 3) 400 MW in SPP 4) Remaining 500 MW exported to WECC MWF-P (Parmer) is interconnected to TASS by a 1250 MW line and to ERCOT via 3000 MW of CREZ transmission. Assume that sales to the West and East are: 1) 500 MW in CA requiring 500 MW of transmission between AZ and CA 2) 500 MW in AZ requiring 1000 MW of transmission between NM and AZ 3) 700 MW in NM requiring 1700 MW of transmission between TASS and NM 4) Remaining 700 MW exported to SPP MWF- P MWF- S ERCOT SPP NM Phase 1+2; 3000 MW Parmer – TASS Up to 1250 MW Parmer - ERCOT Phase 1+2; 2000 MW Sherman – Tallgrass TASS CA AZ MISO PJM G4G6G1G5G2G MW MW MW 3000 MW Phase 1+2; 3000 MW Parmer – TASS Up to 1250 MW Parmer - ERCOT 1250 MW 2000 MW