First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
S. M. Gibson, P. A. Coe, Photon02, 5 th September Coordinate Measurement in 2-D and 3-D Geometries using FSI Overview ATLAS Group, University of.
Muon endcap alignment for the CMS experiment and its effect on the search for Z′ bosons in the dimuon channel at LHC Muon endcap alignment for the CMS.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech.
14 August Magnetic Field in the ATLAS Muon Spectrometer Masahiro Morii for the ATLAS Group Harvard University Laboratory for Particle Physics and.
Calibration of clinometers for the alignment of muon chambers in the CMS experiment. Thomas MOSCHOUTIS, Marion RIPERT and Georgia KARAGIORGI with Dr HOHLMANN.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
Calibration of Analog Sensors for the Alignment of Muon Chambers in the CMS experiment Marion Ripert, Georgia Karagiorgi, Thomas Moschoutis Dr. L. Caraway,
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Geant4 Simulation of the Beam Line for the HARP Experiment M.Gostkin, A.Jemtchougov, E.Rogalev (JINR, Dubna)
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
First CMS Results with LHC Beam
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
Simulation of the CMS Endcap Alignment Scheme Using COCOA.
Samir Guragain, Marcus Hohlmann Florida Institute of Technology, Melbourne, FL Z′ Mass Reach MC Analysis USCMS meeting Brown University May 6 – 8, 2010.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 25-February-2011 Z-sensor News James N. Bellinger 25-February-2011 Good news this time!
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
PIXEL ladder alignment Hidemitsu ASANO. Photo analysis & survey beam data (with zero magnetic field) ① SVX standalone tracking Global Tracking Strategy.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
HPS Collaboration meeting, JLAB, Nov 16, 2016
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Plus Endcap Transfer Lines
Status of Transfer Line Reconstruction University of Wisconsin-Madison
James N. Bellinger 1-November-2007
University of Wisconsin-Madison
Validating Transfer Line Fit University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
CMS Week Muon Alignment
Transfer Line Calculations
University of Wisconsin at Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Presentation transcript:

First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74 th Annual meeting of SESAPS, Nashville, TN, Nov 8-10, 2007

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 2 CMS detector of CERN CMS solenoid -13 m long Magnetic field - 4 Tesla Total weight t Overall diameter -15 m Overall length m Yokes Muon Endcaps ME+1 ME+2 ME+3 ME+4 ME - Z+ Compact Muon Solenoid

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 3 A part of CMS 2 Crosshair Lasers (adjustable) Ref. DCOPS Chamber DCOPS’s Transfer Line DCOPS Z-tube Z-sensors Transfer Plate Clinometer Mounting Tower ME+2 SLM Back Chamber R-sensor Laser beam Laser on ! Z CMS Rphi CM S

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 4 Full Reconstruction Model R-sensors Z-sensors Note: only small sample of analog sensors shown Clinometers Transfer plate DCOPS’s Straight Line Monitors (SLMs) and Transfer lines Lasers SLM currently under study (ME+2 SLM 2-5) Lasers Chamber resolution 75 micron for ME1/2 and 150micron for other. The system monitors the positions of CSCs relative to each other and to the MABs

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 5 Basic strategy Fit DCOPS data at B=0T and reconstruct DCOPS and CSC positions using COCOA (CMS Object-oriented Code for Optical Alignment) Check B=0T reco results for one SLM against photogrammetry (PG) in full detail and with great care until we can trust the reconstruction Quantify precisions and accuracies Reconstruct DCOPS & CSC positions at B=4T Apply lessons learned to reco of other SLMs

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 6 Simultaneous fit in z CMS for two lasers in ME+2 SLM2-5 at B=0T DCOPS CCDs B=0T Laser hits (shifted to the sides of CCDs for display) CCD2 CCD4 CCD2 CCD4 fitted position First CCD pixels Simultaneous fitting of 2 lasers with hits that overlap on 4 central DCOPS’s is now working ! Ref. CCD bad hits not used in fit Note: In MTCC 2006 the lasers were tilted towards the CSCs on purpose to compensate for disk bending at B=4T ! laser line fit

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 7 Fit Residuals Precision in z CMS (“z-resolution”) ≈ 60  m

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 8 Dowel pins Reconstructed tops of CSC Alignment pins Reconstructed tops of DCOPS boxes First CCD pixels Reconstructed positions of outer CSC PCB skins B=0T CCDs PG of TPs determines global z CMS position of entire system Reconstructed DCOPS & CSC Positions and their Precision Note: In this coordinate system the DCOPS are “up-side-down” (ME+2 DCOPS tops are at smaller z CMS )  z reco ~ 270  m Shim delta New shim New shim

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 9 Now, accuracy …

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 10 Solid triangles: Reconstructed tops of CSC Alignment pins Solid triangles: Reconstructed tops of DCOPS boxes First CCD pixels Reconstructed positions of outer CSC PCB skins B=0T CCDs PG of TPs determines global z CMS position of entire system Accuracy check of ABSOLUTE positions against PG at B=0T Open triangles: PG measurement of tops of DCOPS boxes Open triangles: PG meas. of CSC Alignment pins PG measurements of coded targets on outer CSC PCB skins Reco and PG now match well !!! Perfect ! (no PG avail.)

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 11 Discrepancy in Z between PG and Fitted positions 683 micron

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 12 Reconstruction of z CMS for CSCs in ME+2 SLM2-5 at B=4T B=4T B=0T fit positions B=4T fitted CSC positions Disk bending is reconstructed ! This assumes (incorrectly) that the TP’s do not shift in z & do not rotate! ~ 13mm

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 13 Summary Reconstruction of z CMS coordinate is working Z-resolution & Sensitivity to relative motion ≈ 60  m Z-precision of reconstructed CSC centers ≈ 270  m Z-accuracy of reconstruction ≈ 680  m (Comparison with Photogrammetry data) Accuracy required by design 1 mm Disk bending at B=4T is reconstructed THANKS

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 14 Back up slides

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 15 ME+2 Disk

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 16 Beam Profiles measured with CCDs 2 & 4 in ME+2 SLM2-5 for both Lasers Laser Beam Profiles supplied by Jim Bellinger Pt.5 Pt.2 One MTCC2 alignment event: Nov 3, :01:16:48 CCDs 4 Laser 2 CCDs 2 in 10 DCOPS Good hits ! Laser 2 Laser 5

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 17 Reconstructing ABSOLUTE CSC z CMS - coordinates via DCOPS geometry… z-coordinate of first CCD pixel (14  m/pixel × 1024 pixels) z-reference surface for DCOPS dowel pin (new!) nominal z CMS - position for SLM updated CAD Drawing by Dave Eartly – 10/15/07 CCD Top of DCOPS box DCOPS foot Dowel pin (precision element) center Allowed Laser Range CCDs 2 & 4 All dimensions in mm DCOPS Side View +

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 18 z-coordinate of first CCD pixel z-reference surface for DCOPS dowel pin nominal z CMS - position for SLM CCD Top of DCOPS box z-coord. of PG Target on top of DCOPS box Shim Mounting plate Mounting bar DCOPS foot top CSC PCB panel updated CAD Drawing by Dave Eartly – 10/15/07 CSC z-reference surface for al. reco (new!) coded PG target lives here ! CSC frame … CSC geometry…

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 19 …and Transfer Plate (TP) geometry TP ref. surface (also for PG) SLM Reference DCOPS Transfer Line DCOPS Laser 6.73 (newly found shim !) updated CAD Drawing by Dave Eartly – 10/17/07

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 20 Sanity check on Precision as returned by Reconstruction All errors in microns All tolerances In this column under review !  Precision dominated by mechanical tolerances and not by spread of laser hits in fit (60  m res.) !  ok !

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 21 Effect of missing hits This Example: Turn one good hit into a bad hit on two separate DCOPS on the same chamber Result: This has only a small effect on the overall fit and reconstructed positions ! Simulate effect of missing laser hits (e.g. due to shadowing) on the reco results by manually inflating errors on good hits

11/08/2007 S. Guragain - SESAPS meeting, Tennessee 22 Effect of missing hits cont’d