B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 1 City of Port Angeles Above High Water Mark.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

1 Regional Dialogue Contract Overview and Scheduling Impacts WECC Schedulers Meeting May 10 th & 11 th 2010.
Will CO2 Change What We Do?
Amendment 3/5 Workshop.
Technical Conference Avoided Cost Modeling January 6, 2015.
1 Conservation: An Alternative Energy Source for Local Communities Ted Coates, Power Manager September 20, 2008.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Public Exchange Clarification Briefing June 2009.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
Energy Planning and Recent Regulatory Developments Northwest Energy Systems Symposium (NWESS) University of Washington February 22, 2008 Nicolas Garcia.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
ANALYZING YOUR ELECTRIC BILL Bob Walker Met-Ed November 7, 2007.
Smart Storage Space and Water Heaters Resources for Grid Management, Renewable Integration, and Conservation Paul Steffes Steffes Corporation
System Reliability Procurement: Non-wires Alternatives in Rhode Island Tim Roughan National Grid.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Introduction to Bonneville Power Administration
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Pasadena Water and Power 2009 Power Integrated Resource Plan Update August 16, 2010.
Renewable Energy Project Economics, Policy and Incentives NARUC Staff Subcommittee on Accounting and Finance October 8, 2007 Dr. Lola Infante Manager,
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
1 City of Port Angeles Strategic Planning Presentation June 7, 2011 Presented by: Gary Saleba, President EES Consulting, Inc. A registered professional.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
BPA Tier 2 FY Load Forecast Tier 2 Power Supply/Strategic Planning Workshop June 7, 2011 Philip D. Lusk Power Resources Manager
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NEET Work Group 6 Update: BPA Demand Response April 21 st Karen Meadows Pam Sporborg.
Northwest Power and Conservation Council Action Plan Summary.
PUBLIC POWER UTILITIES IN IDAHO Presented to Legislative Generation Sub-Committee by Idaho Energy Authority (IDEA) and Idaho Consumer Owned Utilities Association.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Retained Provisional CHWM Amounts and CDQ Adjustments March 14, 2014.
1 Presentation A LOOK AT TIER 2 OPTIONS AND SOME WAYS TO EVALUATE THEM Presented by: Terry Mundorf, Partner Marsh Mundorf Pratt Sullivan & McKenzie May.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
2008 Bidders Workshop Attachment D April 11, 2008.
City of Port Angeles Strategic Planning Workshop for Power Supply June 7, 2011 Scott Corwin Executive Director Public Power Council.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Northwest Power and Conservation Council A Look At The Council’s Conservation Planning Methodology and Assumptions A Look At The Council’s Conservation.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Northwest Power and Conservation Council The Role of Energy Efficiency in the Northwest Power and Conservation Plan Tom Eckman Manager, Conservation Resources.
1 Proposed Input Assumptions to RTF Cost-Effectiveness Determinations February 2, 2010.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Preliminary Regional Rate Study Results & Remaining Rate Study Inputs June 5, 2014 Presentation Water Supply Operating Board Wholesale Rate Setting.
New Large Single Loads and Economic Development Considerations Draft Assessment.
Pre-decisional page 1 (for discussion only) Roy Fox, BPA Enterprise Risk Manager January 28, 2005 Fish Cost Components Workshop PBL Rate Case Risks and.
Northwest Power and Conservation Council Conservation Resources in the (Draft) 5 th Northwest Power Plan Tom Eckman Manager, Conservation Resources Northwest.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Northwest Power and Conservation Council The Northwest Experience with Energy Efficiency As A Resource Option Tom Eckman Manager, Conservation Resources.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
Demand Response 2010 and Beyond April 28, 2011 Pete Pengilly.
March 24, 2016 Kentucky Municipal Energy Agency Consideration of Renewables.
Staples: Developing an Integrated Renewable Energy Strategy.
EFFICIENCY FIRST FOR MISSOURI’S ENERGY FUTURE Becky Stanfield, NRDC October 21, 2014 MPSC Statewide Collaborative Meeting.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Integrated Resource Plan 2016
Narragansett Electric Rate Classes
BPA Support for Small and Rural Customers
Idaho Power 2017 Integrated Resource Plan
City of Lebanon, Missouri Electric Department
Sixth Power Plan Setting Conservation Targets and Implementation Strategies Jill Steiner, Snohomish Public Utility District Northwest Power and Conservation.
Case No UT PNM Workshop Comments
Retail Rate Design & Administration
Presentation transcript:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 1 City of Port Angeles Above High Water Mark Load and Demand Bonneville Power Administration NWPPA Power Supply Planning Workshop City of Port Angeles June 7, 2011

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 2 Discussion Points  Customers have options for serving Above-RHWM Load  City of Port Angeles ~ Projected Load  Tier 2 Rate Elections  Port Angeles’ Non-Federal Resources  Annexing Load  Demand Charges

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 3 Customers have options for serving Above-RHWM Load 1)Load Shaping Rate if Above-RHWM load is less than 1 aMW. 2)Non-Federal Resource (Specified or Unspecified) if Above-RHWM load is less than or greater than 1 aMW. 3)BPA Flat Block Purchase at a Tier 2 Rate if Above-RHWM load is greater than 1 aMW. 4)Combination of a non-Federal Resource and Tier 2 if Above-RHWM load is greater than 1 aMW. Avoid Above-RHWM load > 1 aMW with conservation projects!

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 4 City of Port Angeles ~ Projected Load Based on April 2011 forecast Port Angeles may not see an Above-RHWM Load greater than 1 aMW until FY 23

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 5Predecisional. For Discussion Purposes OnlySlide 5 Tier 2 Rate Elections  November 2009, Port Angeles elected to serve its Above-RHWM Load (FY ) with the Short-Term Rate:  FY Above-RHWM Load amounts were < 1 aMW, therefore, the City did not take any Short-Term energy.  FY 2014 amounts will be developed in summer of 2012 in the RHWM Process.  The next election deadline is Sept 30, Above-RHWM Load amounts will be set during the corresponding rate cases.  Per a request from NRU, BPA is considering an optional extension in the notice deadline to June 30, 2012.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 6Predecisional. For Discussion Purposes OnlySlide 6 Tier 2 Rate Alternatives Tier 2 Rates will be established in 7(i) processes.  Tier 2 Rate alternatives will be based on the cost of providing a flat annual block of power.  Pricing of power provided at a Tier 2 Rate is based on the cost of BPA purchases and resource acquisitions to serve this load.  Other cost components that may be included in Tier 2 Rates: – BPA Overhead Costs – associated Tier 2 Rates service – Resource Support Services (RSS) – for the cost of converting a resource/purchase into a flat block of energy. – Additional costs including risk, transmission, within-hour balancing, fuel adjustment adders, etc.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 7Predecisional. For Discussion Purposes OnlySlide 7 Tier 2 Rate Alternatives ~ Load Growth Rate  BPA commits to meet Load Following customers’ load growth for the term of the commitment/contract period.  Customers may fix amounts of Above-RHWM load to be served by non-Federal resources or other Tier 2 Rate alternatives for the contract term in conjunction with the Load Growth Rate.  Upcoming Election Opportunity: Sept. 30, 2011 for the period FY 2015 through FY This is the last opportunity to elect this rate.  Customers can limit the amount of power they purchase at the Load Growth Rate by providing notice October 31of rate case year (11 months before the rate period). Liquidated damages may apply.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 8Predecisional. For Discussion Purposes OnlySlide 8 Tier 2 Rate Alternatives ~ Short-Term Rate  Shorter commitment with terms of 3 ( ), 5 ( ), 5 ( ), & 4 ( ) years.  Pricing based on market opportunities.  BPA will determine amounts charged at the Short-Term Rate in each rate case for the subsequent rate period.  Within a purchase period, service at this rate may be converted to service at a Vintage Rate.  Customer may reduce purchase amounts with notice by October 31 of a rate case year. Liquidated damages may apply.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 9Predecisional. For Discussion Purposes OnlySlide 9 Tier 2 Rate Alternatives ~ Vintage Rate  Term of commitment depends on term of intended BPA resource acquisition or power purchase.  A Vintage Rate Statement of Intent (SOI) may be available any time based on customers’ need and interest and BPA’s need to acquire a resource(s).  Customers must give BPA a binding commitment (with SOI) to take Vintage Rate service that recovers costs before BPA will finalize commitment for a resource purchase.  BPA will work with customers to understand their needs and interests for Vintage Rate alternatives.  A market purchase-sourced Vintage Rate SOI is currently under negotiation with customers.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 10April 13, BPA Rate Case WorkshopPredecisional. For Discussion Purposes OnlySlide 10 Summary of Tier 2 Alternatives Tier 2 Alternative (Customer commitment) Potential Resources Allocated to Tier 2 Rate Pool ( Will evolve over time as we get more information about available resources and customer needs and interests ) RECs Provided? Load Growth (14 or 17 yrs) A mix of short & long term purchases (in no particular order, examples could include, Renewables, CCCT, Waste Energy Gen, Market Purchases). Resource selection primarily driven by lowest life cycle cost Potential that some level of RECs could be provided over the course of the contract. Short-Term (3-5 yrs) Short-Term market purchases (5 years or less in duration). Purchases driven by lowest cost market opportunities Unlikely Vintage (up to 17 yrs) Based on customer interest. (In no particular order: Wind, Geothermal, Solar, Waste Energy Generation, CCCT, market purchase) Resource selection driven by targeted resource & lowest life cycle cost Yes, for most renewable-based Vintage rate Alternatives.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 11 Non-Federal Resources  Morse Creek is in the City’s contract as a non-dispatchable, small resource. It is the only non-Federal resource currently listed and has not affected the City’s CHWM or Tier 2 purchases.  Currently, the City has not elected to use a non-Federal resource to serve Above-RHWM Loads.  Port Angeles can elect to serve Above-RHWM Loads with a non- Federal resource during the next purchase period.  Specified Resource: generating resource or contract resource with max hourly purchase > 200 kW  Unspecified Resource: not attributed to a Specified Resource  Port Angeles can avoid Above-RHWM Loads with aggressive conservation.  Estimated total FY12&13 Energy Efficiency Incentive ~$1.5M

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 12 Annexing Load  CHWM have been established and will remain the same throughout the term of the contract.  Port Angeles CHWM = aMW  Port Angeles may add to its CHWM if it annexes a load that has a CHWM.  Contract defines how additions are derived.  Port Angeles may add to its monthly CDQs if it annexes a load that has monthly CDQs.  Contract defines how additions are derived.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Predecisional. For Discussion Purposes OnlySlide 13 Demand Response  Port Angeles is involved in 3 demand response efforts with BPA  Residential Pilot  Commercial/Industrial Pilot  Nippon Paper to help balance wind generation  Port Angeles Demand Response Pilot Projects  Professionally and technically well-received within the Region.  Innovative and accommodating partner.  Demand Response complements Port Angeles’ AMI project and enhances the regional Smart Grid effort.