Potential Dental Clinic Provide a on-site dental clinic – Utilize the same vendor that provided the mobile dental clinic (Onsite Health) – Mobile clinic.

Slides:



Advertisements
Similar presentations
RETROFITTING OF SPRINKLER SYSTEMS
Advertisements

Crescent Academy International
Sustainable Residential Design Project Project 9 DS413: Design Studio 413 May 9, 2012.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
Post Disasters Lessons Learned By Eric R. Henry Administrative Secretary Health Institutions Ministry of Health Antigua and Barbuda.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
U.S. General Services Administration Rick D. Parker, CPPM Manager Utilization and Donation Program Federal Acquisition Service Personal Property Management.
PE EQUIPMENT AND FACILITIES.  Utilize equipment that is appropriate for the developmental level and skill level and that will provide a safe, non- threatening.
MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.
Unisource Solutions Affinity Program San Francisco Chamber of Commerce Members.
Mobile Dental Clinic Pictures of Example Units Prepared by: Bruce Sites.
Read Building Relocation Plan Council of the Built Environment Facilities Utilization Review Sub-Council February 2011.
Six Sigma Academy N Scottsdale Rd Suite 250 Scottsdale, AZ Phone: (480) Phone: (480) Between NOW and 1/24 take a little time.
Preparing for a Multi-Media Inspection at your Medical Facility John Gorman EPA Region 2 What to expect when an EPA Inspector.
Project 3 DS 413: Design Studio 413 May 9, 2010.
Classroom Safety. Staff Responsibility  Supervise the children at all times.  Maintain at least the minimum adult-child ratio.  Develop safety limits.
Harnett County Health Department Flooding Response.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Proposed Sobering Center Status Update Public Safety Committee May 7, 2012.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
Balboa Park Pool SAN FRANCISCO ARTS COMMISSION CIVIC DESIGN REVIEW – CONCEPTUAL DESIGN April 11, 2014.
Lydia Huber Director of Purchasing Victoria College.
Managed Print Services (MPS); Three Years Later A Partnership between The University of Kentucky and Ricoh USA.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
& From Our Window 7 Our schools have been kept in touch nearly six month. We shared a lot of information about school. It’s time to present the similarities.
DC Women's Business Center Sponsored by: U.S. Small Business Administration Operated by: Business at the Next Level: Location, Location, Location.
A Small-Scale Washing and Cooling Unit
ABSOLUTE LEGAL ASSISTANCE, LLC PAID DOWN TIME On average there are 261 work days per year – 10 Holidays – 5 Vacation Days – Total of 15 days (3 work.
© NYSE Euronext. All Rights Reserved. Total Health Management at NYSE Euronext Presented by: Maria Berikakis.
Potential Dental Clinic Dec. 6 Complete Contract / Begin Design Jan. 10 Complete Design / Begin Construction Feb. 14 Complete Construction Mar. 31 Open.
Project Objective: Objective Critical for Evaluation Present charter and preliminary scopeFinalize scope by July 10, 2007 Project Management.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Cherry Engineering Support Services, Inc. (CESSI) A Private Employer’s Perspective on Workplace Accommodations.
THE KEYS TO STARTING A PRIVATE PRACTICE Part I: Thinking Like a Businessman A Presentation of the AACAP Member Benefits Committee.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
VELOPEX EXTRA - X Mk 1V Automatic dental X-ray film Processor
©2001 Kauffman Center for Entrepreneurial LeadershipPLANNING AND GROWING A BUSINESS VENTURE™ ™ Developing Budgets Develop complete chart of accounts Research.
Your Birchwood Park Golf Centre and Horizones Health and Fitness Club are changing...
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
What is inside an animal cell?
Potential Dental Clinic
Ergonomically Friendly Office By: Alyssa and Taylor.
Tissue Banks International Move Presentation 1. Key Dates Monday, December 9 th - Packing & Relocation of Distribution Cage Wednesday, December 11 th.
School Media Center Facility Designs Angela Bates SLIS 5130 – Spring 2010 April 9, 2010.
DISINFECTION METHODS, FOR ENVIRONMENTAL SURFACES, IN A DENTAL OFFICE.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
PHILIP R. BUDD, PSY.D. JILL TSIAKILOS, J.D. Creating and Maintaining a Counseling Practice.
Rotary Global Grant Medical Supplies and Equipment for a Village Primary Health Care Center in South Sudan.
Department of Energy and Environment Green Zone Environmental Program (GZEP)
The Founder Gordy Schafer Opens the First Gordy’s Market on the South Side of Chippewa Falls (approximately 2,000 sq. ft.) Gordy’s Market At.
Wild Dunes Luxury Price Reduced!
Our School Presentation
Site Planning & Power Supply
FURNITURE & PREPOSITIONS OF PLACE
Buckner Boulevard Special Purpose District PD 366
Lecture on Plant Assets, Natural Resources and Intangible Assets
Tissue Banks International Move Presentation
Site Planning & Power Supply
24 Yacht Harbor Court MLS# ~ $1,199,000
The Design Process By: Andrew Brock.
Disaster Preparedness
مرحباً بك في جامعة نورثرن آيوا. WELCOME TO UNI
2018 ING Chicago.
Home Office.
PE Equipment and facilities
Business Law & Financial Advisor.
a sneak peek inside our vision
Presentation transcript:

Potential Dental Clinic Provide a on-site dental clinic – Utilize the same vendor that provided the mobile dental clinic (Onsite Health) – Mobile clinic was booked 1.5 days/week – New clinic start at 3 days/week – At 12 months projected at 5 days/week – Self Contained – Onsite Health - provide dental chairs and equipment Everything needed to run a clinic – No cost to SPE

Potential Dental Clinic Location – Eric’s office Too small – only one chair would fit. – Next option was a synergistic location close to Medical – Robert Young 1416 and 1418 – currently used by: Screen Gems for storage Production Relocation Services as an office – Onsite Health will reimburse SPE for: TI needed to prepare their space for the clinic Cost to relocated Relo Services to a new location

Potential Dental Clinic Vacating RY1416 and RY1418 – Relocation Services Worked with Facilities and Studio Operations to evaluate any and all potential spaces on east side of Lot Best option was to build an office inside Plant 3, where they currently store furniture. Also, if space is available, purchase shipping container for additional production furniture storage near basketball court – Screen Gems storage can be moved by mid- January.

Relocate Production Relocation Services

Robert Young 1416/1418

Potential Dental Clinic New Dental Clinic (RY1416/1418) will need: – flooring, paint, door, domestic water and a drain – Onsite Health - design and pull necessary permits – Onsite Health - reimburse SPS to build-out space (est. $15K)

Plant 3 – South Space

Potential Dental Clinic New Relo office in Plant 3 will need: – Four walls, lid, HVAC, power and data – SPE vendor to design – Onsite Health reimburse SPS to build-out space (est. $35K) reimburse SPS for new shipping container (est. $5K)

Potential Dental Clinic Contract – Susan Ross – Automatically renewing contract, with option out – $150K in dental equipment – $60K in improvements to RY1416/1418, Plant 3 & shipping container SEHS/Finance/Facilities – Today – Steve Bernard to discuss with Dave Hendler People and Organization – Jaime Chung to discuss with George Rose