Dave Openshaw UK Alpha 6 – Block 3 Barcelona 12-15 May 2003 1 Network Asset Management as a Contracted Service Provision based on paper TFS_Openshaw_C1.

Slides:



Advertisements
Similar presentations
Average Earnings by Highest Qualification and Region 2006.
Advertisements

Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Asset management of gas distribution in the U.K Edward Syson Investment Strategy Manager 13 September 2007.
Investment planning David van Kesteren System Design.
July 18, 2008, Atlas Copco Group Q2 Results July 18, 2008.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Exploring and Explaining Patterns of Homicide in Nineteenth-century Scotland Professor Pete King University of Leicester.
1 Cara Blockley Low Carbon Projects Manager Future Distribution Networks 15 October 2013.
Revenue Protection Services Power Transmission and Distribution Metering 19 June 2002 Copyright by Siemens Metering “Revenue Protection Services - A Business”
Confidential Utilities Industry Background MPAN & MPR explained.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
1 A Review of Potential Gains from Reforms ECRA Workshop 6 November 2006 Dr Brian Wharmby Independent Consultant, former Technical Director of Ofgem
Cambridge Conference Pg 1 Ofgem’s approach to smart metering Philip Davies Director of Retail Markets and Environmental Policy.
1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
©2010 Energy Technologies Institute LLP The information in this document is the property of Energy Technologies Institute LLP and may not be copied or.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
The proposed sale of Midlands Electricity’s distribution business to Scottish & Southern Energy © Utility Consultants Ltd 2003 Prepared by Utility Consultants.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Energy Production and Use in California Source: California Energy Commission
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
AQUILA NETWORKS PLC A Midlands Electricity Company United Kingdom Angela Mann Revenue Protection Services.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
J A K Douglas UK Session ALPHA2 – Block 4 Barcelona May SETTING OF TARGETS FOR CONTINUITY OF SUPPLY THROUGH BENCHMARKING DOUGLAS J.A.K. and.
The Electricity Industry in England & Wales Overview - December 1998.
RCN Customer Feedback. Department/BoardNumber of Complaints Number of complaints per 10,000 members RCN Scotland82.0 RCN Wales31.3 RCN Northern Ireland53.6.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
July 17, Atlas Copco Group Q2 Results July 17, 2006.
Robert Huggins Cardiff School of Management, University of Wales Institute, Cardiff Presentation at the ‘Higher Education – Making A Difference To Economies.
GAMMELGARD SE Session 5 – Block 2 – Paper 39 Barcelona May The challenge of regulating natural monopolies in electrical distribution – experices.
The Water Industry In England & Wales Structure, issues & strategies January 1999.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
A different bank for those who want a different world.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Faslodex (Fulvestrant) Trust Formulary Status February 2015 For the use of Healthcare Professionals March 2015.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
1970’s – King Inquiry 1995 – Maintain Safety Level - HSE 2001 – Precautionary Approach - HSE Neil Shaw/v.1./30 January 2002.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Green Flag Award Winners England Wales6165 Scotland5068 Northern Ireland2035 Channel Islands-2 Germany12 The Netherlands68.
Investments Paul Tysoe. Investments Why Investments? Investment Governance and Performance. Collaboration.
Information in this presentation is subject to change Next generation services - Broadband & voice progress - March % UK coverage 549 Next generation.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
Higher Education Institutions and Knowledge Networks: Evaluating Local and Global Knowledge Pipelines Robert Huggins & Andrew Johnston.
Government Office for the North West PAUL STOWERS
Energy Market Regulatory Authority of TURKEY (EMRA) Yusuf GÜNAY President, Energy Market Regulatory Authority Budapest, Hungary May 19, th Annual.
Working with our customers, communities and stakeholders Danielle Royce Stakeholder Engagement Manger 1 March 2016.
Region At Least One Account Yorkshire & Humber15 / 15 West Midlands14 / 14 East Midlands8 / 9 North East7 / 12 North West20 / 23 East of England11 /
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
BACKGROUND ODC/402/18/6/QA_QAF+Toolkit overview for launch v1.
Andrew Reeves, Chairman Asia-Pacific Partnership on Clean Development and Climate: Energy Regulatory and Market Development Forum 4 November 2010.
Background Current balance of LDZ System and Customer charges
Summer Women’s Football Pyramid Winter Women’s Football Pyramid
Distribution Tariffs in Brazil
Access to yellow fever travel vaccination centres in England, Wales, and Northern Ireland: A geographical study  Jakob Petersen, Hilary Simons, Dipti.
FIGURE 12.1 Walgreens and Microsoft Stock Prices,
Latitude and Longitude
Cired Alpha Session 6 Special Report Question 3
Value of penalties issued (£)*
The Need for Compensatory Standby Rates
Electric Distribution and Electric Consumption
Electricity Registration
UK typical power transmission and distribution costs
Typical power transmission and distribution costs
Presentation transcript:

Dave Openshaw UK Alpha 6 – Block 3 Barcelona May Network Asset Management as a Contracted Service Provision based on paper TFS_Openshaw_C1

Dave Openshaw UK Alpha 6 – Block 3 Barcelona May LE Group UK Networks Branch 165,000 km network 14.6 GW demand 7.7m customers b

Dave Openshaw UK Alpha 6 – Block 3 Barcelona May Asset Governance / Asset Management Model EPN Network Assets Network Management SPN Network Assets Network Service Agreement Network Service Agreement Power Networks Asset Governance LPN Network Assets Network Service Agreement LE Group Networks Branch

Dave Openshaw UK Alpha 6 – Block 3 Barcelona May UK Regulatory Model x Opening Value - Investment Depreciation Asset Value WACC Regulatory Return Operating Costs Allowed Revenue Performance Based Adjustment Assurance of Stewardship

Dave Openshaw UK Alpha 6 – Block 3 Barcelona May UK Use of System Charges £0.00 £10.00 £20.00 £30.00 £40.00 £50.00 £60.00 £70.00 £80.00 £90.00 £ Eastern Power Networks Seeboard Power Networks East Midlands United Utilities Electricity [Norweb] London Power Networks Aquila Networks [Midlands] YEDL [Yorkshire] NEDL [Northern] SE Power Distribution [Southern] SP Manweb Western Power Distribution (South West) SHE Power Distribution [Scottish-Hydro] Western Power Distribution (South Wales) SP Distribution [Scottish Power] Typical Annual DUoS Charges - Residential Unrestricted Customer

Dave Openshaw UK Alpha 6 – Block 3 Barcelona May Value - Quality vs. Price SSE North SP WPD W WPD S NEDL SSE South Aquila EME SPN EPN Manweb YEDL UU LPN £40.00£50.00£60.00£70.00£80.00£90.00£ Average annual use of system charge - unrestricted residential customer (3,750 units p.a.) 2 Customer Minutes Lost per connected customer 2001/02 1 Quality of Supply / average domestic charges Sources:1 - Company 2001/02 Licence Condition 5 Information and Incentives Project submissions 2 - Company 2002/03 Licence Condition 4 statements

Dave Openshaw UK Alpha 6 – Block 3 Barcelona May Risk Management Assurance Ofgem Asset Risk Management survey conducted in x distribution / transmission companies surveyed Performance against 3 key areas of risk audited: Business Strategy & Direction Asset & Network Strategy Asset Life Cycle Management 18- point radar plot compiled for each company