MTest Pixel Telescope – Status Update David Christian September 11, 2007.

Slides:



Advertisements
Similar presentations
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
BTeV Trigger Architecture Vertex 2002, Nov. 4-8 Michael Wang, Fermilab (for the BTeV collaboration)
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Without hash sorting, all O(n 2 ) combinations must be checked. Hash Sorter - Firmware Implementation and an Application for the Fermilab BTeV Level 1.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 BTeV Status  Collaboration Status New Groups  University of Iowa - C. Newsom (Pixels)  Institute of High Energy Physics (IHEP - Protvino) - A. Derevschikov,
Gerd J. Kunde - LANL1 The FVTX Technology  Outline Overall Picture Silicon Detector –Geometry, Layout, Process Readout Chip –FNAL Chips, New Chip PHX.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
Nevis FVTX Update Dave Winter FVTX Silicon Meeting 13 July 2006.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
The BTeV Pixel Detector David Christian Fermilab June 17, 2010.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Hybrid Mechanical/Thermal Design FP420 Ray Thompson Julian Freestone, Andy Elvin.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
ATLAS Pre-Production ROD Status SCT Version
Technical Design for the Mu3e Detector
10/month is the present production rate 2 FTE + sporadic contributions
Work packages status in Torino and perspectives
New Calorimeter Trigger Receiver Card (U. Wisconsin)
DCM II DCM II system Status Chain test Schedule.
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

MTest Pixel Telescope – Status Update David Christian September 11, 2007

MTest Telescope Constructed using “BTeV pixels” Pixel size = 50  x 400  (600  ) Oriented to provide “precision-x” or “precision-y” measurements.

Layout Aperture ~ 3.5cm x 3.5cm 4 – 6 stations Beam x y x y

Nomenclature Station = 2 planes & an SLINK Plane = 3 modules mounted on a TPG heat spreader Module = hybrid pixel detector glued & wire-bonded to a High Density Interconnect (Kapton flex circuit) Hybrid = pixel sensor bump bonded to 4 FPIX2.1 ASICs

DAQ Overview SLINK ROUTER Twin-ax (sATA) PCI Interface Fiber Trigger/timing signals LINUX pc Removable disk

DAQ SLINK communicates with 2x3x4=24 FPIX2.1 chips & with ROUTER. –Relays commands & responses –Collects data Deserialize (digital phase follower) Time order & construct data blocks w/extended time stamp & chip ID headers Hierarchy of 2-way data merges

DAQ - continued ROUTER communicates with PCI interface & SLINKs and (optionally) DUTs –12 sATA ports, 4 RJ45 ports –Relays commands & responses –Collects data Hierarchy of 2-way data merges (same logic as SLINK) PCI Interface communicates with ROUTER & pc –Relays commands & responses –Uses 3 CSRs & 3 ring buffers in the pc main memory (64 MB)

Detector Status/Plan Hybrid development complete –11 good hybrids in hand –Balance waiting for LANL PO to VTT Delivery Jan – May (schedule risk) Module development –4x HDI layout ~85% complete (FNAL) –Prototype by end of October, production Nov- Dec (on the optimistic critical path)

Detector Status/Plan continued Plane/Station development: –TPG in hand, reinforcing about to start (FNAL) –Mechanical design underway (FNAL) –SLINK pcb layout & final design is waiting for completion of 4x HDI (Nevis) Box/Area: –Cleanup has started –Mechanical design underway (FNAL)

DAQ Status/Plan DAQ Hardware/Firmware (Nevis) –PCI interface ~90% complete (trigger/timing hooks not written) –Router ~70% complete (trigger/timing, implementation of merges, integration of DUT?) –SLINK Prototype tested at ~90% level; linked to 2 modules Design/layout waiting for 4x HDI On the optimistic critical path

Software Status/Plan Online software (FNAL, Syracuse?, UNM?) –Core low level routines exist & have been tested. –Need to specify online, including online/offline boundary, write & test code. On the optimistic critical path Offline software (Syracuse, FNAL?, UNM?) –Data unpacking –Alignment –Tracking, integration of DUT On the optimistic critical path Strategic decisions to be made in the next 4-6 weeks

Schedule Focus on full telescope in ~Feb If bump bonding is delayed (past ~Jan)… –Install 1 st station + fragments as available (~Jan?)