TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.

Slides:



Advertisements
Similar presentations
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Advertisements

Beam Test and Detector R&D LCWT 09 November 2, 2009 Takeshi MATSUDA DESY/FLC & KEK/IPNS.
Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
Beam test of Linear Collider TPC Micromegas module with fully integrated electronics * D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris,
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
1 Micromegas TPC R&D P. Colas. 2 R&D in progress and to be planned for R&D in progress and to be planned for Present collaborations NIKHEF, CERN workshop,
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Micromegas TPC Large.
28/10/2004 Ron Settles MPI-Munich/DESY Desy Physics Review Committee Meeting October LC-TPC R&D (Goals, Status, Plans) Ron Settles MPI-Munich/DESY.
Carleton University A. Bellerive, K. Boudjemline, R. Carnegie, A. Kochermin, J. Miyamoto, E. Neuheimer, E. Rollin & K. Sachs University of Montreal J.-P.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Resistive bulk Micromegas panels for the TPC D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Introduction Status.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
TPC PAD Optimization Yukihiro Kato (Kinki Univ.) 1.Motivation 2.Simple Monte Carlo simulation 3.PAD response 4.PAD response for two tracks 5.Summary &
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
Development of a TPC for the Future Linear Collider on behalf of the LC TPC groups Aachen, Berkeley, Carleton, Cracow, DESY, Hamburg, Karlsruhe, MIT, Montreal,
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
LC TPC R&D Results May Selected LC TPC R&D Results for the DESY RPC Meeting 2003 May 07 The LC TPC R&D Groups of the PRC R&D-01/03 Proposal Carleton,
10 Nov Ron Settles MPI-Munich LCTPC advanced-endcap studies for the LOI1 Continuation of LCTPC “advanced- endcap” planning for the ILD LOI ILD Logo.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
Toward the final design of a TPC for the ILD detector D-RD9 P. Colas, K. Fujii et al. TYL-FJPPL Okinawa 2015.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Wenxin Wang 105/04/2013. L: 4.7m  : 3.6m Design for an ILD TPC in progress: Each endplate: 80 modules with 8000 pads Spatial Resolution (in a B=3.5T.
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
11/09/2008 Ron Settles MPI-Munich/DESY LCTPC planning for the LOI1 LCTPC issues for the ILD LOI ILD Logo goes here.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
Wenxin Wang (D. Attié, P. Colas, E. Delagnes, Yuanning Gao, Bitao Hu, Bo Li, Yulan Li, M. Riallot, Xiaodong Zhang)
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
CEA DSM Irfu Micromegas R&D for ILC and sLHC at Saclay P. Colas, I. Giomataris, M. Titov.
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Progress with pixelised readout of gaseous detectors
Progress with pixelised readout of gaseous detectors
P. Colas for the LC TPC collaboration
Micromegas module for ILC-TPC
Recents Analysis Results From Micromegas TPC
WP-conveners 3rd phone meeting
Issues for the LC-TPC design and their feedback to the R&D program
WP-conveners 2nd phone meeting
TPC Paul Colas Technical meeting, Lyon.
LCTPC remarks for closed session
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
EUDET Extended SC meeting 31 August 2009
WP-conveners 1st phone meeting
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Large TPCs for HEP RD51 P. Colas Lanzhou U., Saclay, Tsinghua U.
Covering a Large Area ILC-TPC endplate
Presentation transcript:

TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF

LC TPC Collaboration Europe IIHE LAL, IN2P3 IPN, IN2P3 Univ. de Paris-Sud CEA Saclay RWTH Aachen Univ. Bonn DESY & Univ. Hamburg Albert-Ludwigs Univ. Univ. Karlsruhe MPI-Munich Univ. Rostock Univ. Siegen NIKHEF BINP, Novosibirsk PNPI, St. Petersburg Lund Univ. CERN EUDET Asia *Hiroshima Univ. *KEK *ISAS, JAXA *Kinki Univ. *Kogakuin Univ. *Minadanao State Univ. *NiAS *Saga Univ Tsinghua Univ. Univ. of Tokyo (ICEPP) *TUA (*) CDC group Americas Carleton Univ. & TRIUMF Univ. de Montreal, Univ. of Victoria & TRIUMF BNL Cornell Univ. Indiana Univ. LBNL Louisiana Tech Contact persons for ILD: Keisuke Fujii, Ron Settles

R&D Phase 1.Demonstration Phase: Provide a basic evaluation of the properties of an MPGD TPC and demonstrate that the requirements (at ILC ) can be met using small prototypes. 2.Consolidation Phase: Design, build and operate a “Large Prototype” (of large number of measured points) at the EUDET facility in DESY. 3.Design Phase:Start working on an engineering design for aspects of the TPC at ILC. We are mostly in the phase 2. However, there are still important studies of the phase 1 left, and the phase 3 is now starting together with the new ILD group.

From Alexei Raspereza 10/6/2008

TPC: Aim for rφ resolution <100 μ m

Spatial Resolution of MPGD TPC The performance requirements for an ILC TPC greatly exceed the achievements of existing TPCs, in particular, in the momentum resolution; σ(1/p t ) ~ 5 × 10 −5 GeV −1 :  > 200 position measurements with the point resolution σ rφ < 100 μm. (From ILC RDR Vol. 4) A demonstration by MicroMEGAS TPC with resistive anode In the DESY 5T magnet with Carleton TPC (M. Dixit et al., 2007) 2 mm x 6mm pads + resistive anode The small diffusion constant (20 μm/cm 1/2 ) of Ar-CF4-Isobutene (95:3:2). 50 μm (constant) resolution in the drift distance (max. 16 cm). Neff (at 0.5T) = Still need to understand why 50 μm but not less. In DESY 5T solenoid 50μm DESY PRC presentation 1 st April 2008 (Takeshi Matsuda)

Similar results obtained for both 3-GEM and Micromegas amplification structures with pad (analog) readout Both these options keep being pursued In addition: working hard on (digital) pixel readout B = 0.2 T

Syst. error due to B-field distortions Allow max. 5% increase momentum error  hit measurement syst. error < 30 μ m “old” requirement: ∫B r /B z dz < 2 mm, but with anti-DID is already ~20 mm “abandon” old requirement; but B field must be mapped to sufficient accuracy to have syst. error < σ 0 This implies δB r (or φ) / B z ≈ 1x10 -4

MDI/integration at/after Sendai with anti-DID: ∆Bz/Bz < within 50 cm around central electrode The thickness of the TPC end plate is the responsibility of LCTPC, currently 10cm seems OK. The end cap tracker thickness depends on SilC. The distance between the two is taken as being 10cm.

Current estimate endplate material 15% X 0 More precise numbers, depending on different electronics options and cooling, to be worked on in next months

Consolidation Phase TPC Large Prototype Beam Test at DESY Magnet: PCMAG (LC TPC) Field cage & All Mechanics (EUDET) MPGD Detector Modules (LC TPC) Pixel beam telescope (EUDET) Endplate (LC TPC) Test beam (DESY) Gas system (EUDET) Cosmic trigger (LC TPC) Readout electronics (EUDET & LC TPC) DAQ & Monitoring (EUDET) Software development (EUDET & LC TPC) Si strip detector (EUDET/SiLC)

Magnet (PCMAG) Coil diameter: 1.0 m, length: 1.3 m, weight: 460 kg, central magnetic filed: up to 1.2T, liq. He capacity and life time: 240L and max. 10 days, Operational current: 430A (1T), filed decay time: > 1 year, Transparency: 0.2X. PCMAG is a Persistent Current, superconducting MAGnet with thin (0.2X0) coil and wall. It has no yoke. PCMAG was used in MP-TPC beam tests at KEK PS in , and moved to DESY in Dec 2006 for LP1 beam test. The magnet has been tested and mapped at DESY in under the cooperation of DESY, KEK and CERN groups. A new transfer tube is expected in April for safer operation, but PCMAG is essentially ready. KEK

LP endplate ready

Single point resolution: three possible options for gasmultiplication + readout Need to reduce pad size relative to pad response function: –Resistive anode with Micromegas –Defocusing + narrow pads (1 mm) with GEMs –Digital pixel readout; avoids effects due to gain fluctuations

Detector Module: MicroMEGAS with Resistive Anode (1) MicroMEGAS detector by the “bulk” technology (2004): Mesh fixed by the pillars themselves : No frame needed : fully efficient surface Very robust : closed for > 20 µ dust Used by the T2K TPC under construction Bulk Micromegas is cut with a 2 mm border

Detector Module: MicroMEGAS with Resistive Anode 3 techniques for the resistive coating: The standard thick kapton foil laminated and covered with a resistive layer (Carleton) The application of amorphous silicon and doped a-Si by thin layer techniques (Neuchatel) Serigraphy of resistive pastes (CERN) (2) Resistive anode (RA) for the “bulk” detector: (3) LP1 detector module 24 rows x 72 pads Av. Pad size: 3.2 x 7mm 2 Layout of pad plane ready. To be submitted this week. Depending on (2), deliver one without resistive anode at the beginning.

Detector Module: Double GEM with a gating GEM (1) Double thick (100 μm ) GEM with a (thin) gating GEM: (Gating GEM is not drawn)

Detector Module: Double GEM with a gating GEM 28 pad-rows x 176(192) pads for inner (outer) 14 rows Pad size: ~1.2 x 5.4 mm2 pads PCB layout being completed at Tsinghua Univ. Routing of GEM HV is a issue. (2) Pad PCB board: 8 layers (3) GEM: Thick GEMs are ready. The thin gating GEMs are still under work at the company (Si-energy).

Detector Modules with Timepix Chips With MicroMEGAS (Saclay-NIKHEF) With triple GEM (Bonn) 8 chips (16 cm 2 )

Design Phase: Advanced Endplate To prove our crude estimations of 15% Xo for the TPC endplate thickness and about 170W/m 2 for an improved ALTRO-type electronics with power switching, we need to start a design study of the whole readout electronics chain including data transfer, and then a design study and R&D of the pad PCB plane with the flip-chip assembly. The R&D may includes simulations of power delivery, cooling and thermo mechanical features, and a test of pad PCB plane models mounted with dummy chips. This also holds for the pixel readout option..