E. Robutti. TOTEM 1. Measurement of the total pp cross-section. 2. Study of elastic proton scattering over a wide range in momentum transfer up to (–

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
The TOTEM Experiment at the LHC  Physics program  Detector overview Giuseppe Latino (University of Siena & Pisa INFN) (on behalf of the TOTEM Collaboration)
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Andrey Korytov, University of Florida IEEE Nuclear Science Symposium, Honolulu, 31 October Performance of CMS Cathode Strip Chambers Andrey Korytov.
The LNF test setup Status as of Geometry of LNF setup Top and bottom trigger counters 4 KLOE-type tracking chambers One BESIII-(COMPASS-)type.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
N. Morgan, Virginia Tech Qweak meeting,Oct ‘05 Region 2 Drift Chambers Status Report Qweak Collaboration Meeting October 2005.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
MUCH - related activity at PNPI A.Khanzadeev, for PNPI team ● R&D on muon chamber for MUCH central part ● Test of the materials for chamber modules ● Preparations.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Saverio MINUTOLIElectronics WG - 09 June AFEC cross-talk Plots illustrating Cross-talk effect AFEC pcb investigation.
E. Robutti TOTEM T1 Engineering Design Review CERN, March 7, 2006 CSC detector requirements and perfomance Enrico Robutti I.N.F.N. Genova.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Status of the TOTEM Experiment and Latest Results
ЭКСПЕРИМЕНТ R3B РЕАКЦИИ С РЕЛЯТИВИСТКИМИ РАДИОАКТИВНЫМИ ПУЧКАМИ НА УСКОРИТЕЛЬНОМ КОМПЛЕКСЕ FAIR (GSI, DARMSTADT, GERMANY) Е.М. МАЕВ.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Trigger & Tracking detector for CMS
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
A proposal to equip the high eta muon stations with High Rate GRPC
T1 status (a selection from EDR presentations)
CMS muon detectors and muon system performance
T1 Electronic status Conclusions Electronics Cards:
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
The digital read-out for the CSC system of the TOTEM experiment at LHC
Overview of T1 detector T1 is composed by 2 arms
The electronics system of the TOTEM T1 telescope
The digital read-out for the CSC system of the experiment TOTEM at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
What is the CNI experiment
Presentation transcript:

E. Robutti

TOTEM 1. Measurement of the total pp cross-section. 2. Study of elastic proton scattering over a wide range in momentum transfer up to (– t)  10GeV 2 3. Measurement of the inelastic pp interaction in the forward region.

E. Robutti

Production status: support structure oBoth trusses ready in Genova –Now undergoing small upgrades to try and improve stiffness oAll chamber frames in production –5 th layer frame slightly modified in order to solve interference problem with beam pipe support chamber frames service frame

E. RobuttiTOTEM Collaboration Meeting, December 14, Production status: chamber components honeycomb panel cathode plane gas frame ground plane wire-holder oReady: –all components for type 1P, 5P (but 5P will be re-produced); –cathode planes, wire-holders, gas frames for type 1G, 5G, 5P new production; –PCB layout for all cathode planes and wire-holders

E. Robutti

TOTEM Collaboration Meeting, December 14, Chamber production at PNPI Measurement of cathode planarity

E. RobuttiTOTEM Collaboration Meeting, December 14, Chamber production at PNPI Wiring

E. Robutti

TOTEM Collaboration Meeting, December 14, Chamber production at PNPI Test set-up with temporary sealed chamber

E. RobuttiTOTEM Collaboration Meeting, December 14, CSC characterization at PNPI 1. Very low dark current (few nA) at “usual” HV values, raise starting from HV= ( ) kV; 2. After irradiation with strong 137 Ce source ( about 15  A ), current returns to previous values  no self-sustained discharge ; 3. G ain uniformity within ±15% throughout whole chamber

E. Robutti CSC gas gain uniformity

E. RobuttiTOTEM Collaboration Meeting, December 14, Production database oAll results of quality controls and measurements for each chamber are stored in a database. Data will be made available through a web interface: example page (in the works) example page

E. RobuttiTOTEM Collaboration Meeting, December 14, Test beam set-up at CERN CSC #1 CSC #2 Anode read-out (AFEC) Scintillators (+PMT) Cathode read-out (CFEC) LV, PMT HV, cosmics trigger logic gas mixer

E. RobuttiTOTEM Collaboration Meeting, December 14, Dark current measurements at CERN oAt high voltage values both chambers could clearly “see” the beam

E. RobuttiTOTEM Collaboration Meeting, December 14, Production status: CSC components Tentative schedule for component readiness CSC typeWire-holderCathode panelGas frame 1Pready 1Gready31/1/07ready 2P31/1/0715/2 - 15/4/0731/1/07 2G31/1/0715/2 - 15/4/0731/1/07 3P31/1/0715/2 - 15/4/0731/1/07 3G31/1/0715/2 - 15/4/0731/1/07 4P31/1/0715/2 - 15/4/0731/1/07 4G31/1/0715/2 - 15/4/0731/1/07 5P (new)31/1/07 ready 5Gready31/1/07ready oAll material for 1/4 telescope: 15/3/07 oAll CSC for 1/4 telescope assembled: 30/4/07 (proposal under discussion)

E. RobuttiTOTEM Collaboration Meeting, December 14, Production status: read-out electronics 64-channel CFEC (CMS digitization) 128-channel CFEC (analog VFAT) VFAT simulator

E. Robutti

Эксперимент «Эпикур» (В.В.Сумачев) 1.Сделана часть трековой системы на базе ПК с шагом 1мм и апертурой 200*200мм. 2.ПК успешно прошли испытания на пучке ИТЭФ. Эксперимент «Эпикур» (В.В.Сумачев) 1.Сделана часть трековой системы на базе ПК с шагом 1мм и апертурой 200*200мм. 2.ПК успешно прошли испытания на пучке ИТЭФ.

E. Robutti Старение детекторов частиц в интенсивных радиационных полях Старение детекторов частиц в интенсивных радиационных полях

E. Robutti

Fig.2 Fig.1

E. Robutti