Toshiba : Ome Works Group 7.

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

Strategic Decisions (Part II)
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
Topics to be Covered 1. Capacity Planning
CAPACITY LOAD OUTPUT.
Operations Management Aggregate Planning Chapter 13
Sales and Operations Planning CHAPTER THIRTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Ardavan Asef-Vaziri Systems and Operations Management
Manufacturing’s Objectives
Sales and Operations Planning
Strategic Capacity Planning Defined
Chapter 4 Process Planning and Design. Processes What is a process? Suppose Arlington decides to start a public bus system. What would be some processes.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Aggregate planning 1 Aggregate planning / scheduling Medium range plan - what we will make over the next 3-18 months. –general demand –controllable variables.
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Introduction to Computer Technology
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Assembly Line Balance Balance.
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Process (Job Shop) Layouts
Aggregate Planning and Resource Planning Chapters 13 and 14.
Ardavan Asef-Vaziri Systems and Operations Management
Chapter 10 – Facility Layout
Chapter 4 Process Design.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Assembly Line Balancing
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
WORK STUDY.
Slide 1 Chapter 4: Estimating and Reducing Labor Costs The objective of any process should be to create value (make profits), not to maximize the utilization.
Toshiba : Ome Works Presented By :- Group 8.
Operations Fall 2015 Bruce Duggan Providence University College.
Solved Problem An inspection station for assembling printers receives 40 printers/hour and has two inspectors, each of whom can inspect 30 printers per.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Dr. Ron Lembke.  Situation: Assembly-line production.  Many tasks must be performed, and the sequence is flexible  Parts at each station same time.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Forget about paperwork! Automate manual tasks and increase your productivity.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright ©2009 Pearson Education, Inc. Publishing as Prentice Hall 22-1 Operations Management 10.
Revision BUSI 2301 B. Averaging methods b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand.
Manufacturing Processes
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
- To be able to understand to different scale of production that products are made from - To be able to select an appropriate scale of production for a.
Chapter 14 Aggregate Planning.
GSCM 520 RANK Let's Do This /gscm520rank.com
Analytical Tools for Process Analysis and Improvement
The University of Jordan Mechatronics Engineering Department
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Process and Capacity Analysis Capacity Analysis
Assembly line balancing
13 Aggregate Planning.
MENG 447 Manufacturing Systems Automation Chapter 1*
FACILITY LAYOUT Facility layout means:
Fundamentals of Production Planning and Control
3 Types of Secondary Manufacturing
Session 9: Human Resource Management
Dr Sh Salleh bin Sh Ahmad
4.3 Increasing efficiency and productivity
(Lecturer in Mech. Deptt.)
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Presentation transcript:

Toshiba : Ome Works Group 7

QUESTION FOR THE GROUP Suggest an Efficient Line Balancing for the new model of Notebook which would improve productivity and reduce cost

TOSHIBA Satellite Notebook Computers Assembly Line In August 1995, total workforce 2600 employees. Worktime 7.5 hours per day for full time factory workers 6 hours for part time workers 4 assembly lines for producing Notebook computers 1 Idle 1 For overseas production 2 For domestic production Initial Production to be at 150 units per day, to be increased to 300 units in the next week.

TOSHIBA Satellite Notebook Computers Assembly Line… Each line can produce 8 different models Each model can have 6 different combinations of features Total model types possible = 48 Production Plan Monthly Production Plan specified quantities and model numbers of the units for the month. Each model type allotted 20 daily lots depending upon the monthly production plan. Total units on each line = 300. Average time for producing 1 notebook = 2 minutes per 10 line workers.

Solution 1 – LEVEL STRATEGY (OT) Number of stations 10 and workers 11 Cycle time c =10 hour/300 units = 120 sec Therefore 2.5 hours is the overtime required for producing 300 units per day

Solution 2 – CHASE STRATEGY Line Balancing Based on 90 Seconds per station !!!

Line Balancing Based on 90 Seconds per station…. Maintaining Work time = 7.5 hours/ day Output rate r = 300 / 7.5 = 40 unit/hour Cycle time c = 1 unit produced in 60 / 40 = 1.5 minutes = 90 seconds

Line Balancing Based on 90 Seconds per station…. Calculations Σ T = Total time = 1011 sec c = cycle time = 90 sec TM = Σ T / c = 11.23 ≈ 12 Stations Hence Increase 2 stations and hire 4 workers

Line Balancing : 90 seconds

Comparison between both solutions Cost analysis of Level strategy Direct cost (10 people * 7.5 hours * X sal) + (10 people * 2.5 hours * 1.3 X sal) = (107.5 X sal) Indirect cost No additional cost Efficiency ή= Σ T / Σ Available = 1059 / 10*120 = 88.25 %

Comparison between both solutions Cost analysis of Chase strategy Direct cost (14 people * 7.5 hours * X sal) = (105 X sal) Indirect cost Hiring & Training cost for 4 workers, 1 Shock test unit Efficiency ή= Σ T / Σ Available = 1011 / 12*90 = 93.61 %

RABBIT CHASE STRATEGY Both the alternatives suggested incorporate the use of the RABBIT CHASE Seemingly the purpose of rabbit chase is to chase-down and catch a rabbit. Now this rabbit is an elusive little devil – it can hop randomly in any direction. You can run at least as fast as the rabbit, maybe even faster. In other words it is work procedure where each of the 2/3 work persons goes through all the steps of the multi step process, performing the same tasks (staring from the beginning to end). This is applicable within an assembly line or for part Supply task.

R Store Prototype Store R Workers are chasing the activities in a module Rabbit chasing Workers are stationary B B B B B

ADVANTAGES Multi tasking Eliminating Support Worker Increase Productivity and Quality Decrease dependability on working skills

Other possibilities 1. Increase the conveyor speed ( With rabbit chase flexible task workers ) 2. Outsource Certain sub-assemblies 3. Layout optimization

PCB Assembly Automated Suggested Layout Engine Assembly Unit Admin and Prodcution HD Drive Final Assy Prototype assy PCB Assembly Automated PCB manual assembly R&D /Design lab

Thank You