19962008 Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital.

Slides:



Advertisements
Similar presentations
Rio de Janeiro (Rio) Brazil, South America. Rio South Atlantic Ocean.
Advertisements

FreightVision Austria 2050 ITS and Smart Logistics towards Eco-Efficency Claus Seibt, Independent Expert (formerly Austrian Institute of Technology)
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
9/7/2012 MBS UU.
Meeting AECOM, AM SOP-T, CFR, JASPERS
Urban Mobility by BRT.  Population: 6,5 million  Travels by public transport: 10 million/day (metropolitan region) Bus: 9 million Train: 568,000 Metro:
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
BRT: METHODOLOGY Belo Horizonte Ralph Gakenheimer Clean Air Institute.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
PASSENGER TRANSPORTATION PROJECTS IN MEXICO ALICIA HERRERA Commercial Specialist for Passenger Transportation U.S. COMMERCIAL SERVICE MEXICO Mexico City/Mexico.
I-35W and 46 th Street Station Concept Service Plan and Construction John Dillery & Mac Sweidan Kingfield Neighborhood Association June 2010.
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner.
Station Development Update Melissa DuMond, Director of Planning and Integration April 29, 2015.
Increasing the Quality of Public Transport in Prague Prague Integrated Transport.
Urban Transport Benchmarking Initiative Paris and the Urban Transport Benchmarking Initiative Isabelle Bachmann- RATP- Paris.
1 A bet on Public Transport Carlos CRISTÓBAL PINTO Head of Studies and Planning Department Consorcio Regional de Transportes de Madrid MADRID.
Cheryl Thole, Jennifer Flynn CUTR/NBRTI, Senior Research Associates Transit in GIS Conference September 14, 2011 St. Petersburg, Florida.
Urban: An area that has a high population density, usually metropolitan areas. Different modes of transportation: –
Recent process of Metrô Planning in São Paulo. Who I am João Carlos Scatena Civil Engineer 32 years working in transportation planning for São Paulo Metrô.
Managing Director/CEO
Департамент внешнеэкономических и международных связей города Москвы Moscow mega-projects fincentermoscow.comEvgeny DRIDZE.
EurailSpeed milano 2005 Which market for high speed rail ? - The experience of Paris-Charles de Gaulle airport Jean Marie Chevallier Director of Airport.
Presentation by: Permanent Secretary - PMORALG Mr. Jumanne Sagini 3 rd June 2014.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
By Tamás Gergely.  Prague is the capital and largest city of the Czech Republic. It is the fourteenth-largest city in the European Union. It is also.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
HAMILTON – 2012 BIKE SHARE PROGRAMS CHANGING THE WORLD ONE CITY AT A TIME.
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
South Moravian Region's Spatial Development Principles PURPLE Conference May 2012 South Moravian Regional Authority planning and construction department.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
By Dalma Bakai. Prague is the capital and largest city of the Czech Republic. It is the fourteenth-largest city in the European Union. It is also the.
I-35W and 46 th Street Final Service Restructuring Plan.
: Research Question: Would ridership needs in the area of the Mid-Coast Corridor Transit Project be better Served by the implementation of a Bus Rapid.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Sustainable mobility in Lviv mobility.lviv.ua. Sustainable mobility – any type of transportation that can help reduce environmental impact. This may include.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
10 May 2015 Planning for BRT in Giza and New Cairo.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Metro an urban connection. Background information A metro or rapid transit is an underground train which transports passengers. It is undoubtedly the.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
Oscar Figueroa P. Universidad Católica de Chile Reducing the Impact of Vehicles on Air and Environment Quality in Cities ISSUES AND ACHIEVEMENTS ON TRANSPORTATION.
Operational Programme on Transport Coordination of Programmes and Projects Directorate December 2007 Ministry of Transport.
9618/PLT/EUR/318-05Page 1 Edition 1 High Speed Regional Services High Speed Regional Services: a new market? by Jean-Pierre ORSI, director Europe SYSTRA.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
7 May 2014 Sustainable transport vision for Greater Cairo.
PolicyLink Regional Equity Project Linking Jobs, Housing and Transportation Kalima Rose, Associate Director February 8, 2005.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
The National Strategy of Slovak Republic
June 2015 BRT station design. Iconic exterior Rio de Janeiro, Brazil.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
Amal S. Kumarage 4 th November 2015.
Urban Land Use. Residential – Includes all places where people live – Generally the largest land use in most cities often taking up to 40% or more of.
Gastonia Transit Expansion Study City Council/Planning Commission Joint Transportation Workshop September 13, 2007.
Buffalo City Municipality Ms. Zuko Somtunzi Operations Manager MDANTSANE URBAN RENEWAL PROGRAMME.
Land Transport Infrastructure Integration. TfL’s purpose Meet the rising expectations of our customers and users Plan ahead to meet the challenges of.
10 Nov Seong Yil BAE Vice President
Metrô Rio & SuperVia March Location BRASIL Rio de Janeiro Rio Rio de Janeiro Metropolitan Region - Population: 11,6 million - Counties: %
The Potential of Using the Smart Card Data to Define the Use of Public Transit in Seoul Dr. Jin Young Park The Korea Transport Institute Dept. of Metropolitan.
California Transportation Planning Conference Rail Modernization to Improve Mobility for California Moderator: Melissa Elefante DuMond, AICP Director of.
Foco na cobertura não-esportiva Tradição desde os Jogos Olímpicos de Sydney 2000 Operational Summary – Opening Ceremony -There has been 52 road closures.
ARCH – 4601 Feasibility Study Presentation
Railroad.
Quito – towards a sustainable mobility
Construction of a new international terminal in Shymkent
Regional Rail What is Missing? Metro-North NJ Transit LIRR
Southern African Solutions to Public Transport Challenges
Moving India forward Urban Infrastructure: Challenges & Policy Options for Low Carbon Mobility Amit Bhatt, Director, Integrated Transport.
Transportation: Policy, Strategy & Investments
Sugaropolis By Room 29.
Presentation transcript:

Free-Ticket granting controlNot controlled (above 65 elders only)100% controlled Fare CollectionMagnetic SystemEletronic System Traffic ControlAnalogicDigital Modernizations

Modernization of OCC

Events in Rio de Janeiro 2011 – V Jogos Mundiais Militares 2013 – Copa das Confederações 2014 – Copa do Mundo 2016 – Jogos Olímpicos

Maracanã Station Metrô Rio Maracanã Station

1968 – METRO’s ORIGINAL CONCEPT

Metro lines 1 & 2 Metro lines 1 & 2 3 BRT systems (Link C, T5 Corridor and Barra – South zone) High Performance Transport Ring Atlantic Ocean Suburban railways lines Metro lines 1 and 2 Metro lines 1 and km3 km

High Performance Transport Ring Railway Metrô BRT

Metro Barra Extension Line 1

New Project

The new project extends Line 1, connecting Ipanema to Barra, and passes through high urban density areas. This layout will ensure best cost/benefit relation to the population since it considers infrastructure for intermodal integration in the nearby areas, and will also improve the transit as long as it creates opportunities of transport rationalization. Extension: 13.5 km Passengers in a weekday: 230,000 Distance between stations: 2.25 km Number of new stations: 6 Fare: R$ 3,10 Journey time: Between Jardim Oceânico and General Osório stations: 15min30sec. Between Jardim Oceânico and Carioca (Downtown) stations: 33min40sec. New Project

SummaryNew Project Extension13,5 km Stations6 Distance In Stations2,25 km Passengers in a Weekday Amount transference until Downtown _ Capacity expansion offer2,7 X TaxUS$ 1,50 InvestmentUS$ BI

THANK YOU! JOUBERT FORTES FLORES FILHO Institutional Relations and Human Resources Director METRÔ-RIO Phone: / Fax