Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.

Slides:



Advertisements
Similar presentations
1 1 View from DOE LB DUSEL Meeting February 27, 2008 UC, Davis Jerry Blazey NIU/DOE.
Advertisements

SWE IG Meeting Paris, CRE XBID Overview Supported by.
Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
LBNE Europe in LBNE Alfons Weber University of Oxford STFC/RAL.
DOE Neutrino Program Plans
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
CERN LBNE Test Experiment. Plan view of Bat
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Cargill Associates Architects in Philanthropy. 1. Narrow focus on immediate needs 2. Unengaged constituency 3. Weak Case for Support 4. Untested goals.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
Long Range Planning Pier Oddone September 24, 2007.
Management subcommittee closeout Jay Marx (chair, LBNL), Joel Butler (Fermilab), Stan Wojcicki (Stanford) Thanks to all for cooperation and openness!!
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
All Hands Meeting FY 2008 Budget Pier Oddone Fermilab December 20, 2007.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
31 MAY 2007 ILC 2007 DESY 1 The U.S. Way Tom Lackowski GDE.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.
1 Tunnel implementations (laser straight) Central Injector complex.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Budget Outlook Glen Crawford P5 Meeting Sep
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Detector R&D through the NSF PHY division. Jim Shank/Jim Whitmore, NSF CPAD Meeting Arlington, TX 5-7 October, 2015.
Fermilab Project Overview Michael Lindgren 2014 EVMS Surveillance Review 10-Dec-2014.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Long Baseline Neutrinos How we got here Nigel S. Lockyer Fermilab Open Meeting on Neutrinos 12/12/2014.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Status N. S. Lockyer
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
RCUK International Funding Name Job title Research Councils UK.
BSM Group Activities DUNE Collaboration Meeting –ND Physics Jan. 14, 2016 Jae Yu Univ. of Texas at Arlington.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
A Post P5 Planning Exercise at Fermilab Greg Bock Fermilab PAC July 24, 2014.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
LBNE Project Scope, Cost, Schedule and International Involvement 1 Jim Strait, Fermilab LBNE Project Director P5 Meeting 3 November 2013.
Head, Office of Project Management Oversight (OPMO)
Introduction to the Workshop
S4 will be a “big” Collaboration:
The DBD: Outline and Scope
Preliminary Project Execution Plan
Presentation transcript:

Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14

The Emerging Vision…waiting for P5 Priorities for the U.S. Particle Physics Program U.S. High Energy Physics community continues to play a leading role in LHC operations and upgrades Fermilab hosts world-class accelerator-based neutrino program Full scope LBNE, underground with >1MW beam power Active program in short baseline LArTPC experiments..SBNE Next gen rare process exp’ts take place this decade…g-2, Mu2e Explore new particles & forces with a set of exp’ts in the cosmic frontier…..lead DES, partner LSST, CMB, DESI, dark matter exp’s Participation in the ILC as an international partner Plans for an upgrade of Fermilab complex to deliver >2 MW Work with world community on longer term accel technology Requires major investments by non-DOE and international partners

Pre-amble: SBNE and Sterile Neutrinos Sterile neutrinos are hotter now…after gravitational waves Fermilab is highly motivated to work with Europe on neutrinos SBNE has several “off-project” attractive features –Physics is compelling, one million reconstructed events useful for LBNE, advancing the technology reduces risk for LBNE, team building at Fermilab and in Europe Unfortunately Carlo Rubbia, key ICARUS team members and INFN are unable to make this date…may be available at end of April…exact dates soon…prevents final decisions…but We should strive to accomplish as much as possible here We will need to make a few assumptions…some of which I can provide guidance 3

How to Make Some Progress…external constraints Constraints from DOE –The building cost must be less than $10M or it will require congressional approval (local language a GPP project) –The detector cost capped at $10M ….due to budget ….funds are coming from redirection from an existing program –A goal is we build and operate the near detector as R&D to avoid the Critical Decision process (CD process) (<$10M and the MIE limit is $2M, otherwise it must go through Congress making a single item above that cost hard to deal with)…I’ll try to better understand this. –The enlargement of the SciBoone Hall should be less than $3M If these constraints can be met and we agree on details as a team, we can start essentially immediately. 4

Studies that are needed It would be helpful to have plots to demonstrate an optimal length along the beam direction for the near detector –This should be a joint Lar1-ND & Icarus study Identify three coordinators from LAr1-ND, MicroBoone, and Icarus to do work necessary to: –Ensure raw data from all three collaborations is compatible –Provide plots to demonstrate reach of physics –vary a few parameters to show near detector length optimal needed taking into account all three detectors Estimate running period (POT) neutrinos & if desired antineutrinos Would a factor of two in neutrinos be useful….Valerie is looking into a new improved horn design…worth it? 5

Hardware issues…to get a reliable cost estimate We must have a reliable cost even if not a “CD” project Provide a better estimate of near detector: –Develop a requirements document for near detector –Include: power, cryogenic distribution, cryogenic design, footprint, and equipment, ??? –Include contingency and risk matrix 6

Icarus Building Costs Can we assume that ICARUS is on the surface? Estimate how long it will run…. has an impact on design of structure and construction materials Requirements document for that building is needed: –Power, cryogenics, networking, safety systems….. New Control room in Wilson hall under construction…complete by summer is assumed 7

Other Areas to Collaborate: US & CERN We should be looking at a broad program in preparation of signing a joint US CERN agreement for LHC and neutrinos The cryogenics design should be modern & scalable, in preparation for LBNE (underground) Membrane cryostat issues can be jointly addressed A T-200/300 at CERN if it goes ahead should have US involvement …Strait and Nessi Two phase detectors Use of CERN test beam should be exploited jointly Targets & horn can be a joint area of development 1/3/14Presenter | Presentation Title8

Conclusion Much real work to do. Let’s setup the frame work for progress and begin Integrate the “three teams” into process being set up Encourage joining each other efforts Plan another meeting end of this month –We are trying to allow colleagues to submit NSF grants on time 1/3/14Presenter | Presentation Title9

Thank you