Auditing an evolving Pre-operative Assessment Service 2002 - 2009: Completing the cycle Paul Knight, Consultant Anaesthetist Joanna Gordon, ST3 Anaesthetics.

Slides:



Advertisements
Similar presentations
Project HIFT alfords Health Investment For Tomorrow Project HIFT alfords Health Investment For Tomorrow SHIFT Project – Salfords Health Investment For.
Advertisements

Acute Medicine Interface
The MDT Process: BSUH and WSHT (Worthing) M.F. Caruana (on behalf of all the team)
West Hertfordshire Hospitals NHS Trust Centralisation of Acute Services Dr Colin Johnston Medical Director WHHT.
ISBAR Presentation for senior staff
Preoperative Assessment in Private Practical Pointers for Private Practitioners Dr Adam Molnar MBBS FANZCA Victorian Anaesthetic Group.
Transforming surgical services UHBristol
Improving the quality of medical and surgical care NCEPOD Dr Marisa Mason.
British Association of Day Surgery The Future of Day Surgery: The Ambulatory Pathway Ian Smith, MD, FRCA Senior Lecturer in Anaesthesia.
Inefficiencies in provision of acute care with poor use of estate Dependence on hospital care with failure to transfer care to community Need for more.
Ideas from UK modernisation: The Improvement Partnership for Hospitals Penny Pereira Ideas from UK modernisation.
1. Introduction 2 Peripheral arterial disease – Affects 20% adults in Europe and North America – In the UK /million PAD, 1-2% require amputation.
How Clinical Process Simulation Changed Hip Fracture Pathway in Torquay Andrew Fordyce, Rachel Blackshaw, Rob Lofthouse, Mike Swart Torbay Hospital 31st.
Refining and Redefining Emergency Flows
Improving Patient Flow: Making the most of Day Case Surgery Dr Samantha Walker, Dr Tom Pike, Miss A. Kausar East Lancashire Hospital Trust
Consultation on changes to hospital services in North Kirklees and Wakefield District Dewsbury public meeting – 21st May 2013.
Developing a Trust wide framework to support Nurse Facilitated Discharge to reduce length of stay Kate Pound and Sue Haines Service Redesign Manager Assistant.
23 hour surgery Beth Jackson Senior Clinical Nurse Specialist Breast Unit The Royal Marsden Hospital NHS Foundation Trust.
The Virtual Ward (grasping opportunity!)
Inpatient care and inpatient experience of young people with ulcerative colitis in the UK [Presenter / title] [Date of presentation]
Delayed Transfers of Care Nursing Home Beds Review Claire Walker Divisional Manager – Integrated Clinical Services.
Major Emergency Response Libby McGugan Consultant in Emergency Medicine.
Department of Human Services Toolkit Pre-operative assessment and elective management A toolkit of the Patient Flow Collaborative Click here to continue.
Assessment of obese patients to facilitate day case admission Sister Sue Roberts – Pre-op nurse practitioner Dr James Palmer – consultant anaesthetist.
Breast Cancer Surgery Challenging Preconceptions Hamish Brown Consultant Breast and General Surgeon Sandwell and West Birmingham Hospitals NHS Trust
TEMPLATE DESIGN © Audit of the Enhanced Recovery Programme for Hysterectomy at West Middlesex University Hospital Background.
RSR Books, Training, Solutions, Consultants RSR Consultants Ltd making finance work for you ©RSR Consultants Ltd Pre-operative.
An Anaesthetist’s perspective on Same Day Surgery
REGIONAL ANESTHESIA Anesthesia Care Teams and Block Areas NAPAN Conference Sue Belo MD PhD FRCPC May 23rd, 2009.
WELCOME TO JOINT SCHOOL. AIMS OF THE SESSION  To help you prepare for your admission  Explain what will happen throughout your stay at Spire Gatwick.
Preoperative assessment
Service 19 TH JUNE 2014 /// SEPTEMBER 4, 2015 ALISON CLEMENTS.
Reconfiguration of Services in the Mid West Future Role of the Local Hospital.
Management of Adults with Diabetes undergoing Surgery and Elective Procedures UHL Guideline – April 2013 The aim of the guideline is to improve standards.
25 January 2013 Dr Ian Arnott UK Inflammatory Bowel Disease (IBD) audit Audit of inpatients with ulcerative colitis 1st January 2013 – 31st December 2013.
1989 Microsoft released ‘Office’ suite Berlin Wall comes down George Bush snr. becomes President USSR pulls out of Afghanistan First NCEPOD Report.
Method Two month data collection period (Feb-Mar 2004) NHS and independent hospitals in England, Wales, N Ireland, Guernsey, Isle of Man and Defence Secondary.
Preoperative Investigations John Campbell ST3 Anaesthetics 12 th November 2009 John Campbell ST3 Anaesthetics 12 th November 2009.
‘WHO is kidding WHO’ Prospective Re-Audit of the implementation Pre-briefing and the WHO Surgical Safety Checklist at FPH August 2011 Department of Surgery.
Trauma Theatre Efficiency Tim White Edinburgh. More patients Sicker patients Unpredictability MTC.
Patient Safety Issues in Gynaecology Joanna Thomas & Louise Samworth Saint Mary’s Hospital Manchester.
Royal College of Obstetricians and Gynaecologists Setting standards to improve women’s health Risk Management and Medico-Legal Issues In Women’s Health.
HEALTH GROUP REPORT Russell Patmore Medical Director, Clinical Support.
NHS Fife Acute Services Scheduled Care Demand & Capacity 25 August 2015.
ED Capacity Management Admissions Flow through ED Tim Parke ED Consultant through ED.
Background ACT/NSW Paediatric & Children’s Healthcare Network Clinical Nurse Consultants group identified the need for standard Paediatric Risk / Nursing.
Consultation on changes to hospital services in North Kirklees and Wakefield District Pontefract public meeting – 16 May 2013.
Dr Edward Sang, Fellow, Gynaecologic Oncology
EPR – A work in progress. Advances in medical science have revolutionised how we treat illness. Today we can cure illnesses that previously would have.
“ Knowing the Risk:” implications for Critical Care Dr Jane Eddleston.
Audit of Day Case Tonsillectomy Aintree University Hospital, Liverpool M Baghat 1, S Knott 2, G Bessant 2, EZ Osman 2. 1:Faculty of Medicine, Alexandria.
Yorkshire and the Humber Emergency Surgery Survey Jon Ausobsky RCS Director for Professional Affairs Yorkshire and the Humber & Alison Young Regional Coordinator.
Yorkshire and the Humber Emergency Surgery Survey Jon Ausobsky RCS Director for Professional Affairs Yorkshire and the Humber & Alison Young Regional Coordinator.
EKHUFT Clinical Strategy Case for Change. Why do we need to change Although we achieve good outcomes for patients, we need to continue to improve Improved.
OVERNIGHT STAY OF DAY SURGERY PATIENTS IN WRIGHTINGTON
David Mold and Dr. Shubha Allard
Healthcare for the Future Public Consultation
Saving more lives Information and Consultation Meeting
Pilot study – experience with new integrated Cataract pathway
Dan Clutterbuck Consultant GUM March 2013
DIVISION OF SURGERY & ACCESS, BOOKING & CHOICE - ORGANISATIONAL CHART
Coagulation Screening In Elective & Emergency General Surgery
Ophthalmology: Seamless Surgery Connect
Method Two month data collection period (Feb-Mar 2004)
Principal recommendations
Orthopaedic and trauma services – improving care for patients
Pre-operative Assessment Improving the surgical pathway
Pre-operative Assessment Improving the surgical pathway
Hamira Ghafoor – Enhanced Recovery Facilitator June 2017
Presentation transcript:

Auditing an evolving Pre-operative Assessment Service : Completing the cycle Paul Knight, Consultant Anaesthetist Joanna Gordon, ST3 Anaesthetics Valerie Wilkinson, Clinical Governance Facilitator

Our Audits Original Pre-op assessment process Roll out across trust for inpatients 2007 Integrated Care Pathway introduced for inpatients in CRH 2004 Audit 2002 Audit 2004 Audit 2009 Future plans

Background Pre-op assessment process pre-2004 Nurse & junior surgeon assessed patient approx 1wk before surgery No formal anaesthetic support Day cases assessed separately

Audit of original process 2002 Both sites Audit (n=764) showed 26% could have benefited from anaesthetic assessment 7% of patients were cancelled on the day of surgery 1% pre existing medical 0.5% acute medical (e.g. URTI) 18% not optimised Mix of cardiorespiratory disease, obesity, sleep apnoea etc.

The CRH Pre-op assessment pilot 2004 Nurses dedicated to pre-op assessment using integrated care pathway Support from 3 dedicated consultant anaesthetic sessions No need for junior doctors Day case assessments remained separate

Our Integrated Care Pathway (ICP) The structure of a tick-box, with the accuracy of prose Abnormalities noted, expanded on and dealt with if necessary A record of information given and investigations ordered

Patient history expanded on….. and action taken………

Re audit 2004 Pilot (CRH) site only Patient viewpoint Surgical and ward staff viewpoints Anaesthetic viewpoint 1 month prospective audit elective patients

Re- audit 2004 Patients, surgeons and ward staff Patients 73% excellent, 27% good Surgeons 38% better,50% same, 12% worse Ward staff (nurses, physios and pharmacy) 42% better, 39% same, 18% worse

Re- audit 2004 Anaesthetists Overall service better 82%, same 12%, worse 6% Time needed to see patients Less for 80% of anaesthetists

Re-Audit 2004: 1 month audit CRH: 423patients Fewer cancellations for pre existing co-morbidities 0% vs 1% Fewer patients not optimised 9% vs 18% More patients admitted same day 91% vs 74%

Reconfiguration of Services August 2007 CRH becomes site for Non-complex inpatient Orthopaedics and General surgery Inpatient Gynaecology Inpatient ENT & Ophthalmology HRI becomes site for Emergency surgery & Trauma Urology Complex major surgery and vascular surgery Day surgery continues on both sites

Roll-out of CRH Pilot cross trust With reconfiguration inpatient pre-op assessment standardised CRH pilot rolled out in line with audit results Time scale short. No fixed base in HRI Process rolled out 2007 Dedicated unit 2008 Day surgery pre-op assessment remained separate

Audit cross trust Looked at: Patient viewpoint (2008) Anaesthetist viewpoint Timing of admission Patient pre-op optimisation Cancellations Day surgery vs Inpatient

Patient and anaesthetist viewpoint Patients 57% excellent, 40% good, 1% fair, 2% poor Anaesthetists 96% thought pre-op assessment service had improved 19% thought comments from anaesthetic clinic were occasionally useful, 42% often useful, 39% always useful 92% thought it took less time to see patients

Was the patientInpatient  Day case  Was the patient admittedToday  Before today  If listed as an inpatient, should they have been a day case?Yes  No  If listed as a day case, should they have been an inpatient?Yes  No  Did the patient go through pre operative assessment?Yes  No  If NO, why not?__________________________________________________ Did the patient attend the pre-op anaesthetic clinic?Yes  No  If NO, should they have done?Yes  No  If they should have attended, please give details why _________________________________________________________________ Was the patient’s operation cancelled?Yes  No  If YES, what was the reason?____________________________________________ How could this have been avoided ? _______________________________________ If the operation was not cancelled, could they have been better optimised? Yes  No  If YES, how? ________________________________________________________

Day surgery vs inpatient, timing of admission and optimisation Overall day case 42% Overall 95% admitted on day of surgery 10% considered not optimised Many organisational e.g. blood results available

Cancellations (34/631 = 5%)

Cancellations Pre-existing medical (n=8) 75% (6/8) day case All hypertension 6/265 = 2.3% 25% (2/8) inpatients AF, Bifascicular block Hypotension &  Na + 2/366 = 0.5%

Audit results through time: Patient views and anaesthetic views Patient questionnaire (2008): Overall quality 73% excellent 27% good 57% excellent 40% good Anaesthetic questionnaire: POA service improved? 82% better 12% same 6% worse 96% better 4% same Anaesthetic questionnaire: Time to see patients 20% Much less time 60% A little less time 20% Same time 52% Much less time 40% A little less time 8% Same time

Audit results through time: Day case and timing of admission Day case44%49%42% Same day admission 74%91%95%

Audit results through time: Medical cancellations and optimisation Cancelled: Pre-existing medical 1.0% combined 0% combined 0.5% inpatient 2.3% day case Not optimised18%9%10%

Discussion 60 inpatients out of 366 identified as suitable day case 16% 2 day cases out of 265 identified as suitable inpatient 1%

Optimising Day Surgery Rates Two different pre-op pathways: Inpatient surgery Day surgery 96% of anaesthetists were happy with inpatient assessment 84% felt all pre-op assessment should follow that same process Incongruent system

Why does inpatient vs daycase matter? Patient experience Environment Risk Efficiency Bed crisis Risk of cancellation Cost of overnight stay Portering delays from ward to theatre

Our Plan Unify pre assessment process based on current inpatient system Decision for inpatient made after poa, only if valid reasons documented Dedicated area for POA in HRI to improve patient experience Re-audit! Further education for anaesthetists about hypertension and anaesthesia

Thank-you Questions or Comments?