J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.

Slides:



Advertisements
Similar presentations
Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
Advertisements

Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
EBIS ARR Andrew McNerney May 4-7, 2010 Hazards and Controls for Electrical, Control, Instrumentation and Conventional Systems.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Developments of the FETS Ion Source Scott Lawrie.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
September 19-20, 2007 E. Beebe EBIS & LEBT Tests Edward Beebe September 19-20, 2007 DOE Annual Review.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
D. Raparia2005/01/27-28 MAC Review EBIS Injector Linac Optics I I D.Raparia EBIS Review 2005/01/27-28 HEBT Booster Injection.
Low-contamination Rare and Exotic Beams (at CARIBU) Sergey Kondrashev October 16, 2012.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
PXIE Ion Source and LEBT Installation Status L. Prost, B. Hanna, R. Andrews Project X Technical Meeting October 29 th, 2013.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Powering The RHIC EBIS at BNL (And a few words on other new projects within the Collider –Accelerator Dept.) Bob Lambiase 16 June 2019.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ESS Front End diagnostic
NICA injection complex status
A. Martynov on behalf of accelerator division.
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Adriana Rossi, Sergey Sadovich
DC Injector and Space Charge Simulation Status
Electron Source Configuration
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
A. Freyberg Aug 2016 ECT’16 =>
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Ion Source and LEBT control system topology, Interlock strategy
ISRC and LEBT Vacuum System Design
Linac LLP Outline LINAC Long Lead Procurements
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
LCLS Injector System Overview D. H
Safety Readiness Review (SRR) Thomas Hansson, ESH
Presentation transcript:

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following gives some general outline of our plans for the rest of the facility.

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 In order to meet the requirements in DOE Order 420.2A, Safety of Accelerator Facilities, C-AD has incorporated a description and safety assessment of the new pre-injector into the current Safety Assessment Document for C-AD. At the appropriate time, C-A Department will obtain an approved Accelerator Safety Envelope for the new pre-injector from DOE and perform an Accelerator Readiness Review in accord with 420.2A prior to commissioning and operations. Safety Assessment Document for C-AD SAFETY The C-A Department conforms to the requirements of ISO 14001, Environmental Management System, and OHSAS 18001, Occupational Safety and Health Management System. Thus, in addition to DOE requirements, documentation of environmental protection and occupational safety and health programs for new pre-injector facilities will be prepared and audited by independent parties. This documentation will include: Environmental Process Evaluations for all processes with significant environmental aspects Facility Risk Assessments for all facilities and areas Job Risk Assessments for all jobs Radiation Safety Committee reviews Accelerator System Safety Review Committee Readiness Reviews Work planning Generation of formal procedures

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Work breakdown structure

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 EBIS HARDWARE Electron gun – have detailed design. Will build in house. (Uses many “catalog” parts). Cathodes – procure from Novosibirsk. Collector – Detailed design. Some parts fabricated outside, some in house. Superconducting solenoid – possible fabrication by BNL magnet division. Otherwise, procurement. Trap electrodes, etc. – fabricate in house

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 LEBT – will fabricate components in-house External ion sources: LEVA – have. Easy to make. Hollow cathode – have. Easy to make. Chordis – would procure from Danfysik

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 RF STRUCTURES As presented yesterday, RFQ, IH Linac, and bunchers – Frankfurt/GSI likely RF ps’s – procure, or possibly MIT Bates Lab collaboration. Have vendor quotes for both RFQ/Linac rf systems, and buncher rf systems. RFQ and IH ~ 350 kW amps

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Description# UnitLength Design Vacuum Level< 1x10 -9 Torr Beamline Length 40 m Special Dipole Vacuum Chambers m Gate Valves, 10” CF m Gate Valve 8” CF 80.12m Sputter Ion Pumps, 20 l/s 5 Cold Cathode and Pirani Gauge Set 18 Residual Gas Analyzers 1 Turbopump/Dry Pump Stations, 7 Cryopumps 10 Diffusion Pumps with Baffle 2 NEG cartridge pumps 2 Titanium Sublimation Pumps 4 Insitu Bake Temperature for HEBT line 200C Vacuum Systems

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 SOLENOIDS TypeLength (cm) Aperture Radius (cm) Field (T)Current (A) Voltage (V) E-Gun SolenoidSOL Collector SolenoidSOL LEBT SolenoidSOL ? QUADRUPOLES TypeLength (cm) Aperture Radius (cm) Gradient (T/m) Current (A) Voltage (V) MEBTPMQ MEBTEMQ MEBTEMQ MEBTEMQ MEBTEMQ LINACEMQ LINACEMQ LINACEMQ LINACEMQ LINACEMQ LINACEMQ HEBTEMQ HEBTEMQ HEBTEMQ HEBTEMQ HEBTEMQ HEBTEMQ HEBTEMQ HEBTEMQ DIPOLE Bend Angle Gap (cm)Radius Curvature (mm) Field (T)Current (A) Voltage (V) HEBT73° HEBT73° Solenoids – fabricate in house MEBT quads – same as SNS MEBT quads HEBT quads – existing (from decommissioned beamline). Dipoles – undecided (probably procure) MAGNETS

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 LEBT Solenoid (H- linac) Pulsed

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Legend CT Current Transformer MW Multiwire Profile Monitor FCFaraday Cup/Beamstop FFCFast Faraday Cup EMEmittance (pepperpot) TOFTime of Flight, Hi-Res & Inline COLCollimator EBIS Diagnostics Layout CT MW MW/FC FC Booster Ring FC FFC CT Quantities CT 8 MW 4 FC8 FFC1 E2 TOF2 COL1 EM COL TOF

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Device EIL LEBTMEBTHEBTTotal TOF High Resolution11 TOF Inline11 Emittance112 Faraday Cup21249 Current Transformer Profile Monitor13 4 Collimator11 Mamyrin time of flight – have “prototype”, and detailed design. Inline TOF – have prototype. Pepperpot emittance – Have detailed design. Building prototype. Profile monitors – 3 from Tandem line. 1 procurement. Faraday cups – mixed, homemade, and procured. Collimator – homemade, same design as used at Tandem.

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Schematic of Mamyrin TOF

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Controls: EBIS controls – based on Test EBIS controls. Accelerators & transport lines – standard RHIC-type controls. Cooling systems: Similar to existing units. Power Supplies: Most are standard procurements. Most notable units are: collector ps (15 kV, 15A), pulsed dipole ps’s (12 V, 3000 A ?), and EBIS platform 100 kV isolation transformer/HV pulsing.

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Cooling Systems

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 FACILITY MODIFICATION

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 FACILITY MODIFICATION

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 SCHEDULE

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 R&D $ requested this year from DOE: Main tasks: Fabricate the collector/extraction and test offline. Measure the temperature distribution on the collector, and optimize the electron beam spreading on the collector surface. Put the present test EBIS on a HV platform. Design and fabricate the LEBT line. Measure output beam emittance vs. trap potentials, ion energy, charge state (confinement time), and ion species, at ~ final EBIS parameters. (In addition, this will then allow this source/LEBT to be used for testing of the final RFQ with beam at least one year sooner than if one were to wait for the RHIC EBIS)

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Schedule “highlights” (present thinking) Year 1: Procure RFQ Procure/fabricate EBIS solenoid Procure 1 RF ps Fabricate EBIS trap region structure Year 2: Building addition Procure linac and bunchers Procure HEBT dipoles Fabricate LEBT components Test RFQ on Test EBIS Fabricate electron gun, collector, chambers, … Preassembly of EBIS in equipment bay Year 3: Procure collector ps Procure 2 nd RF ps Procure HEBT dipole ps Fab/procure diagnostics Install EBIS-to-Linac in final location Operate EBIS in final location Year 4: Install HEBT Test beam through RFQ, Linac Commission full system

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 5-Year Construction Schedule (AY$) (preliminary projection)

J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 SUMMARY The Test EBIS has demonstrated that an EBIS meeting RHIC requirements can be built. The RHIC EBIS design incorporates improvements to make it a more reliable device for routine operations. The RFQ and Linac are straightforward, very similar to existing devices. No real issues related to the rest of the beamline or Booster matching. A reasonable design exists for the beamline. We feel that we are ready to begin construction of many components, and can complete design details on remaining components within one year.