1 April 30, 2015 PXIE Fabrication Update Matt Hoff LBNL April 30, 2015 Daughter and Son to Work Day April 23, 2015 Ari and Kwin, my wife’s cousin’s kids.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Homemade EVO Valve Spring Compressor Tool. Parts List 1.One O2 Sensor Socket 2.One 1”diameter washer (1/2” inside) 3.One 3” piece of ½” square metal tubing.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
Openergo A self-build rowing machine
1 Production and QA of Barrel / Endcap Heat Exchangers ATLAS SCT PRR April 13 th & 14 th 2005John Morris – Queen Mary, University London Heat Exchanger.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
ID 1.75 Material list: aluminum ¼ X ¾ X 6 in flat bar ¾ X 6 in round stock 1 X 6 in round stock 2 ea 5/16 heli-coil Weld 1” joints.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
IMP Visit July 10, 2013 Matt Hoff LBNL July 18, 2013.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Thermoelectric Cooling Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu Client: Greenfield.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
I’m not going to claim that the Camera Obscura was a Tudor invention, there has been mention of the technology as long ago as 500 years by the Greeks,
Hello Year 5 It was great to receive your interesting questions. We have done our best to answer them all !
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
PXIE RFQ Status RFQ Fabrication Summary Module 2 bead pull test complete (Timer will give a talk next). Vane machining continues. We are.
PXIE RFQ Engineering Design and Fabrication Project X Fall 2011 Collaboration Meeting Fermilab – October 25, 2011 Steve Virostek - Engineering Division.
Francois and Lau EATM 17 July 2012
Complementary ISTC Projects #3888, 3889p
LARP Phase II Secondary Collimator RC1
EHN1 Neutrino Installation Plans
Far Detector Activities Late 2017 – Early 2018
WELDING REPRESENTATION
MICE Coupling Coil Update
Arch205 building construction wall systems- Steel
BASEPLATES SLIDE SHOW.
LARP Phase II Secondary Collimator RC-1
STEEL PLATES.
SNS PPU Cryomodule Thermal Shield
LCLS Vacuum System Plans (July 07)
Presentation transcript:

1 April 30, 2015 PXIE Fabrication Update Matt Hoff LBNL April 30, 2015 Daughter and Son to Work Day April 23, 2015 Ari and Kwin, my wife’s cousin’s kids with Module 2 Daughter and Son to Work Day April 23, 2015 Ari and Kwin, my wife’s cousin’s kids with Module 2

2 Module 4 is leak tight April 28, 2015

3 Module 4 April 30, 2015 at 10:30 AM. Their has been no vacuum pumping on this module for over 36 hours and the vacuum gauge still reads a low pressure. Leak tight.

4 Main Support Frame welding complete. Off to the poweder coat vendor May 1. Auxiliary supports (outriggers) are still being fabricated / welded. They do not need painting.

5 The rectangular steel tubing has a weld seam bump on the inside. The end block machinist hand fitted each end block to fit perfectly inside each tube. Nice craftsmanship from the LBNL shops. After weld Support Frame Details

6 Floor plates fabricated Support Frame Details

7 Module 2 April 23, 2015 Module End Wall Machining is underway. Modules 1 and 2 are complete. Module 3 will be done either May 1 or May 4 th. Module 4 after that. Module 1 Lead machinist Mark Campagna

8 Module 2 Entrance end Dowel pin hole Dowel pin slot Canted spring groove inside O-ring groove outside Raised lip (barely visible) Vane tip canted spring grooves

9 Module 3 end wall machining April 30, 2015 at 10:20 AM.

End Cap Plates from FNAL arrived April 28, The boxes have not been opened yet. 10

11 Sensing loop port plugs have been designed and prototyped. 48 more are now in production. These will plug the sensing loop port holes if the sensing loop are late for vacuum testing.

12 The shipping spread sheet has been started. The list will grow longer and more detailed in the coming weeks.