The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Berkeley Lab, May Bertrand H.J. Biritz1/16 Outline RHIC and STAR STAR Time of Flight (TOF) High and Low Voltage Power Supply Control Interface Daya.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
January 15, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
T1 Electronic status Conclusions Electronics Cards:
PMT cabling Gian Luca Raselli INFN Pavia
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
HPS Motherboard Electronic Design
Some proposals on HV circuits realization for segmented straw detector
Noise on chambers M1R4 N.Bondar
First of all we will remind some numbers:
Pierluigi Paolucci - I.N.F.N. Naples
Conceptual design of TOF and beam test results
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
HCAL HV splice box.
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component selection and adopted solutions; - PVSS work started !

- 18 sectors ( 20 o tilted ) - 5 modules/sector - from 15 to 20 strips/sector - HV ranges +(-)7.5 kV ( but the system can hold up to 15 kV).

MRPC Module Distributors 40 m kV SY1527(+) SY1527(-) 40 m 6m HV channels

HoneycombPlane Distributors HV + HV - Vetronite or glass cylinder Soldered connections Strip 3 Strip 4 Strip 1 Strip 2

HV system by CAEN: SY1527, 16 (6 ch, 7.5 kV) modules. First modules ready on July (+ few spare modules with 15 kV to feed asimmetrically few strips.) Single width SY1527 (+) SY1527 (-)

Cable: by Kerpen (3-polar, 15 kV) Halogen free, flame retardant shield FL GND HV 9.4 mm

cable Nickel coated Connectors by CPE: A prototype of the Kerpen cable equipped with these 3-polar connectors ready, just tested.

-The HV Control PVSS based just started, taking advantage of the HMPID group help. -At the moment, PVSS Version Framework 1.2, running on W First choice of the Detector view