Autostrada A1 Nowe Marzy, 25 August 2008. Autostrada A1 Nowe Marzy-Toruń Negotiations between General Directorate of National Roads and Motorways and.

Slides:



Advertisements
Similar presentations
COMMISSION FOR ACCREDITATION AND QUALITY ASSURANCE
Advertisements

European Investment Bank The PPP Premium in European Roads Projects Hugh Goldsmith PPP Coordinator, Projects Directorate Frederic Blanc-Brude & Timo Välilä
NEW CENTRE OF LODZ PROGRAMME PRESENTATION Principles of the New Centre of Lodz Programme 2. The objective of the New Centre of Lodz Programme The.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 WORKSHOP ON ROAD USER CHARGING SYSTEMS BEYOND TECHNOLOGY Warsaw: June 12, 2007 Presentation by: Zoltan Pap, Intertoll-Europe.
Innovation: User Support Terminals. Built around existing integration terminals Combine social services, shopping, banking, etc. Provide service access.
- legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava.
Advantages and threats of public – private partnerships in larger infrastructure projects: Polish motorway development program Investing in Europes Regions.
Introduction to PPP in the EU RCC PPP Conference, Sarajevo, 25 September 2009 Michael Burnett, Director, European PPP Forum, European Institute of Public.
Concession Agreement Tirana International Airport Nene Tereza
CALENDAR.
Gadsden City High School Construction Progress. Gadsden City High School March 30, 2005.
1 1  1 =.
1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Nesta Bis Toruń Poland Nesta group Nesta – Bis spółka z ograniczoną odpowiedzialnością spółka komandytowa Płaska 23b street, Toruń Poland
Spending money, saving money A4 section Zgorzelec – Krzyżowa business case Monika Milwicz EU Projects Department.
About us Motorways of Federation of B&H Ltd Mostar is 100% owned by the Government of Federation of B&H Motorways of FB&H is responsible for managing,
Coalfields Expressway & ADHS Corridor Q
Petroleum Law – TPA – Spring 2007 Access to infrastructure Petroleum Law - JUR5410 8/12 March Catherine Banet, Phd Research fellow Scandinavian Institute.
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
STRATEGIC PETROLEUM RESERVE BAYOU CHOCTAW CAVERN 20 REPLACEMENT 1.
RESULTS OF THE ACTIVITIES ON TRAFFIC SAFETY IN REPUBLIC OF SERBIA FROM 2001 TO 2010 YEAR.
Chisinau International Airport Modernization Project II.
VOORBLAD.
9.1 HW pg # 3-11 odd, odd, 25-29odd
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Murray River Project Update Coal Forum October 2013.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Januar MDMDFSSMDMDFSSS
Fourth Quarter Oklahoma Data (October-December 2011)
Weekly Attendance by Class w/e 6 th September 2013.
1 ADJUSTMENTS OF DEDUCTION. 2 BASICS 3 Periods of adjustment and method Periods of adjustment –Five years (periods of reference in Malta) for capital.
R Street Improvement Project (30% Review Meeting) February 28, 2007 August 20, 2008 City of Sacramento R Street Market Plaza Project 16 th Street to 18.
Gauteng Freeway Improvement Scheme Road Pavement Forum Alex van Niekerk November 2007.
Toll Motorway Program in Poland Marek ROLLA Director of Road Network Department General Directorate of National Roads and Motorways March 2006.
Bulgaria’s strategic road infrastructure challenges.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
Michael Swinford Bechtel International Project Director, Autostrada Transilvania Friday 22 nd October 2010 Albanian Motorway Project A New Direction.
MANAGING MOTORWAYS CONSTRUCTION IN CROATIAN MOTORWAYS Goran Legac Construction Department Croatian Motorways, Ltd. Zagreb,
Role of State Role of State in implementation of major PPP road projects Panagiotis Patsiadas Deputy Head of Contracts & Bids Unit, International Project.
THE SEMINAR ON TECHNICAL SOLUTIONS FOR SUSTAINABLE WINTER SERVICE Hradec Králové, The Czech Republic October 7 – 9, 2009.
Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.
COUNTRY STUDY - POLAND POLISH PROGRAMME OF MOTORWAYS CONSTRUCTIONS - BARRIERS OF IMPLEMENTATION Prof. Jan Burnewicz, dr Monika Bak University Of Gdansk.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
1 Program of construction the high speed lines in Poland Warsaw, r.
 PPP Department within the Ministry of Economy and Transport  Government Decree in May 2003 to set up an Interdepartmental Committee – Ministry of Economy.
Viaduc de Millau. Project timeline 28 June28 June 1989: governmental approval of the middle route October19 October 1991: selection of the.
10 th Cohesion Fund 1164/94/ISPA Monitoring Committee Meeting – 25 January 2012 GENERAL REPORT ON MEASURES managed by Ministry of Transport, Information.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
by Daniel Govender (AMSAICE) Project Manager in Training (ARE)
1 DEPARTMENT OF PUBLIC WORKS P ROGRESS REPORT ON THE LEBOMBO PORT OF ENTRY 22 FEBRUARY 2011.
ХVI Meeting of the Monitoring Committee of Operational programme “Transport” June 2014 Velingrad.
Detroit River International Crossing Project March 31, 2010.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Stage 2 Light Rail Transit Program “In the ground ready”
Dr. Hreinn Haraldsson Director General Icelandic Road Administration
ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME ZIMBABWE
PUBLIC ENTERPRISE ROADS OF SERBIA.
Presentation transcript:

Autostrada A1 Nowe Marzy, 25 August 2008

Autostrada A1 Nowe Marzy-Toruń Negotiations between General Directorate of National Roads and Motorways and Gdańsk Transport Company were resume in February On 30 June 2008 the preliminary agreement for realisation of the Motorway A1 Nowe Marzy – Toruń were signed between the Minister of Infrastructure and GTC. On 12 August 2008 General Director of General Directorate of National Roads and Motorways handed over to GTC the right of way in order to commenced the construction works on the motorway.

Autostrada A1 in 2011 Total length of the A1Motorway km, including: section Gdańsk -Toruń built in PPP model km section Toruń - Łodź built in traditional model km section Łódź - Pyrzowice built in PPP model km Pyrzowice – boarder with Czech Republic built. in traditional model - 93 km

Autostrada A1 progress Existing sections: 43 km section Rusocin – Swarożyn - 25 km section Głuchów – Piotrków Trybunalski - 18 km Currently under construction: 177,5 km Swarożyn – Nowe Marzy - 65 km Nowe Marzy – Toruń 62,4 km węzeł Sośnica - 2,2 km Sośnica – Bełk - 15,4 km Bełk – Świerklany 14,1 km Świerklany – Gorzyczki - 18,3 km

Autostrada A1 progress Currently ongoing tenders: 214,3 km A1 Stryków – Pyrzowice km A1 Sośnica – Maciejów - 6 km A1 Pyrzowice – Piekary Śląskie - 8,2 km A1 Piekary Śląskie – Maciejów - 20,1 km Tenders under preparation: 144 km A1 Czerniewice – Stryków I – the environmental decision is awaiting

Autostrada A1 Nowe Marzy - Toruń

Gdansk Transport Company SA is a special p purpose company set up in 1996 to pursue. the A1 motorway project The company holds the concession to design, b build, operate and finance the most northern. stretch of the A1 motorway between Gdansk and. Toruń The concession was issued for a specific term and. will expire in 2039 Gdańsk Transport Company

The present shareholders in Gdańsk Transport Company are: NDI Autostrada 25,31% Skanska ID 30% John Laing Infrastructure 29,69% Intertoll ID 15%. Skanska Infrastructure. Development.John Laing Infrastructure. NDI Autostrada. Intertoll Infrastructure. Developments

Autostrada A1 The construction of the A1 motorway is divided into two phases: Phase 1 – 90 km stretch. of motorway between. Rusocin and Nowe. Marzy near Grudziądz.. Completion - October Phase 2 – planned 62 km stretch of motorway between n Nowe Marzy and Czerniewice n near Toruń.. Completion - December 2011.

Construction works commenced in November The first 25-km section Rusocin – Swarożyn was open. for traffic in December Completion of the. next 65 km of Phase 1 is scheduled for 15 October drivers have used the motorway till now,. currently average daily traffic oscillates around 20,5. thousand cars, the highest traffic on the A1 was vehicles. Phase I realisation

Project scope Works includes construction of: Completely new section of the. motorway from the junction Nowe. Marzy to the junction Lubicz. (51,72 km) and the bridge over. the Vistula River. Modernisation of partly existing. section from the junction Lubicz. to Czerniewice (10,70 km) and. finishing construction of the two. bridges over the Vistula River. in Toruń and Drwęca River.

Project scope Total length – 62 km Interchanges - 5 Toll Stations - 6 Travellers Service Areas – 4 pairs Motorway Maintenance Area - 1 Engineering Structures – 51 Modernisation of existing - 15 Environmental mitigation facilities Road furniture

A1 Motorway route Localisation of the bridge over the Vistula River near Toruń and the interchange Czerniewice

A1 Motorway route Localisation of the MOP Nowa Wieś and the bridge over the Drwęca River

A1 Motorway route Localisation of the interchange Lubicz

A1 Motorway route Localisation of the interchange Turzno

A1 Motorway route Localisation of the MOP Nowy Dwór

A1 Motorway route Localisation of the Dźwierzyńskie Lake

A1 Motorway route

Site organisation South of Poland Scotland, Scandinavia

Contract structure Ministry of Infrastructure GDDKiA Lenders EIB, NIB Shareholders Skanska ID, Intertoll ID, John Laing Infrastructure, NDI Autostrada Independent Engineer WS Atkins Polska EPC Contractor Skanska -NDI Operations & Maintenance Intertoll Polska Equipment Supplier Intertoll ID Toll Plaza Contractor Intertoll Construction Polska Construction Law Inspectors