CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.

Slides:



Advertisements
Similar presentations
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
Advertisements

ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
NCTM’s Focus in High School Mathematics: Reasoning and Sense Making.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
1 The Impact of SAS 112 on Governmental Financial Statement Audits GAQC Member Conference Call January 4, 2007 Presented by Chuck Landes, CPA.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Larry Wolf, chair Marc Probst, co-chair Certification / Adoption Workgroup March 19, 2014.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
CLIC-ILC Collaboration ILC PAC, May 2010 Mike Harrison Slide 1 GDE Collaboration with CLIC Technical Working Groups General Issues working group Is the.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
4.4 Timeline for M2M Consolidation Susan Miller ATIS Head of Delegation Meeting of Potential M2M Consolidation Partners #2 Washington, D.C. August 17-18,
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
1 Tunnel implementations (laser straight) Central Injector complex.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Collaboration with CLIC Mike Harrison * ILC PAC Meeting, Eugene, November 2010 * Aknowlegements to Philippe LeBrun Contents: Background Technical WGs update.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0147r0 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Process Update Proposal Date:
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Elements for a discussion on the development of a course on microsimulation of health Philippe Finès July 2010.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
CLIC-ILC accelerator collaboration Ph. Lebrun* CERN IWLC 2010 CERN Geneva 22 October 2010 * With the help of E. Elsen, M. Harrison, J. Osborne, Y. Papahilippou,
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
24 October 2006 Industry Dialogue on xoserve services – Work Plan.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
A lens to ensure each student successfully completes their educational program in Prince Rupert with a sense of hope, purpose, and control.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
2008 General Meeting Assemblée générale 2008 Toronto, Ontario
CIIMS Proposal for TOP-003 Approach
CLIC Klystron-based Design
UK Link Technology Refresh
IMT-2020 Contribution Content
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Performance Audit Subcommittee Project for ISSAI Level 4 review 66th INTOSAI Governing Board Meeting Vienna, November 5-7, 2014.
TECHNICAL REPORT.
Coordinate Operations Standard
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Alignment of Part 4B with ISAE 3000
Alignment of Part 4B with ISAE 3000
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans

CLIC-ILC WG Oxford, Jan 10 2 CLIC / ILC Joint Working Group on General Issues The working group consists of Philippe Lebrun (co-chair), Ken Peach, Daniel Schulte, Mike Harrison (co-chair), Kaoru Yokoya, and Eckhard Elsen.The working group consists of Philippe Lebrun (co-chair), Ken Peach, Daniel Schulte, Mike Harrison (co-chair), Kaoru Yokoya, and Eckhard Elsen. The group meets about monthly by conference call and has had one face-to-face meeting in Oxford in January Another one is tentatively scheduled for Beijing in March. We have had three meetings to date.The group meets about monthly by conference call and has had one face-to-face meeting in Oxford in January Another one is tentatively scheduled for Beijing in March. We have had three meetings to date. Meeting information, presentations and meeting notes are posted on an INDICO site (password protected).Meeting information, presentations and meeting notes are posted on an INDICO site (password protected). To date we have been primarily analysing the charge and formulating our tentative work plan which covers the time period of 2010-~2012. The current concept would have the WG producing an interim report at the end of 2010 and a final one two years later. These reports will be relatively short.To date we have been primarily analysing the charge and formulating our tentative work plan which covers the time period of 2010-~2012. The current concept would have the WG producing an interim report at the end of 2010 and a final one two years later. These reports will be relatively short.

CLIC-ILC WG Oxford, Jan 10 3 CLIC / ILC Joint Working Group on General Issues – the charge from Delahaye & Barish ILCSC and CSC have approved formation of a CLIC/ILC General Issues working group by the two parties with the following mandate:ILCSC and CSC have approved formation of a CLIC/ILC General Issues working group by the two parties with the following mandate: –Promoting the Linear Collider –Identifying synergies to enable the design concepts of ILC and CLIC to be prepared efficiently –Discussing detailed plans for the ILC and CLIC efforts, in order to identify common issues regarding siting, technical issues and project planning. –Discussing issues that will be part of each project implementation plan –Identifying points of comparison between the two approaches. The conclusions of the working group will be reported to the ILCSC and CLIC Collaboration Board with a goal to producing a joint document.The conclusions of the working group will be reported to the ILCSC and CLIC Collaboration Board with a goal to producing a joint document.

CLIC-ILC WG Oxford, Jan 10 Slide 4 Initial WG reaction to the elements of the charge 1. Promoting the linear collider –Beyond agreement of principle with this goal, the WG did not see how it possessed any special expertise in this area and thought its time better spent in other elements of the charge. Progress in other areas could have this effect naturally of course. Nevertheless, this would be kept under review 2. Identifying synergies to enable the design concepts of ILC and CLIC to be prepared efficiently –The WG has embarked on two courses of action. Firstly we have asked the previously appointed, more focused CLIC-ILC technical groups to indicate areas in which they are producing collaborative work, and areas where they believe such synergies are possible in the future. After we receive their responses (due by end January 2010) the WG will identify the areas of greatest promise for further consideration. –Secondly, the WG has decided to think about what might be described as the ultimate synergy; a phased approach to a linear collider complex. In this scenario the WG would see whether it makes sense to consider a scheme which starts with a lower energy ILC-like machine which evolves into a higher energy CLIC–like one. This is evidently a complicated question which may have a simple answer; No. Any answer besides No is also likely to be complicated.

CLIC-ILC WG Oxford, Jan 10 Slide 5 Initial WG reaction to the elements of the charge 3. Discussing detailed plans for the ILC and CLIC efforts, in order to identify common issues regarding siting, technical issues and project planning. –The WG decided to produce a common indicative timeline, showing essential milestones up until 2015 as a first step to identifying common issues. We have had some initial discussions regarding siting and will have some observations on the subject. 4. Discussing issues that will be part of each project implementation plan –The GDE has an outline of a project implementation plan which has been presented to the WG. The CLIC collaboration has not thought too much about this issue yet. The WG spent some time chasing its tail on this topic and then decided to table it for now.

CLIC-ILC WG Oxford, Jan 10 Slide 6 Initial WG reaction to the elements of the charge 5. Identifying points of comparison between the two approaches –It appears to the WG that this will involve an ungodly mixture of physics, cost and technical risk. Detailed physics scenarios will require the initial LHC results (at least). Cost information is available for the ILC but it will require the CLIC Conceptual Design Report later in 2010 before CLIC costs are evaluated. The CLIC Conceptual Design Report will include a scaled 500 GeV version which could be built as a first step to the main 3 TeV design, so the basic information will exist. ILC technical risks are reasonably well understood at this point. The CLIC technical challenges are a major goal of the 2010 study thus any risk comparisons require the CLIC report to be completed. –This is evidently a complex problem but the WG believes that while a definitive answer is likely elusive this WG is a good place to start the process. Significant progress is unlikely before the CLIC Conceptual Design Report is completed.

CLIC-ILC WG Oxford, Jan 10 Slide 7 The near term Details of the WG intentions will be presented for comments to the CLIC Board, the ILCSC & the GDE EC in February.Details of the WG intentions will be presented for comments to the CLIC Board, the ILCSC & the GDE EC in February. We will probably concentrate on items 2 -> 4 in 2010 and await the CLIC feasibility study before considering item 5.We will probably concentrate on items 2 -> 4 in 2010 and await the CLIC feasibility study before considering item 5. The WG will consider whether there are any other topics that naturally fall into this program. To date we have not identified anything we would propose to add.The WG will consider whether there are any other topics that naturally fall into this program. To date we have not identified anything we would propose to add.