WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.

Slides:



Advertisements
Similar presentations
Status of Al-FPC development for IB A. Di Mauro, A. Junique, P. Riedler ITS-MFT mini-week
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
IEEE NSS-MIC 2011, Valencia, Spain 1 Large Area Ultra-Thin Detector Ladders based on CMOS Monolithic Pixel Sensors Wojciech.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
4/11/2011Rui de Oliveira1.  Collection of the biggest PCB failures we’ve seen at CERN workshop since 10 years.  The PTH (plated through hole) is the.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Status and outlook of the Medipix3 TSV project
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Hybrid Integrated Circuit
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Antoine JUNIQUE, Gabriele FIORENZA, Satoshi YANO 1 Laser soldering test 11/03/2014.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,
Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Dummy and Pad Chips Needed for various activities (interconnection tests, mass tests, assembly,…) Production of masks, processing, thinning and dicing.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN State of the art technologies for front-end hybrids.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Low Mass Rui de Oliveira (CERN) July
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Resistive protections Rui de Oliveira 09/12/15
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Workshop How to make a PCB
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
Switcher (SWB) bumping
ATLAS pixel module assembly flow
What is Stave Carrier Frame Required to Do?
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Sector 002 Assembly status report
Manufacturing of the first FCC-hh beam screen prototype for ANKA
ALICE-MFT-WP5-FPC- vidyo
ob-fpc: Flexible printed circuits for the alice tracker
R. Kersevan, TE-VSC-VSM 30/06/2016
WP9 ITS Mechanics and Cooling
ALICE PD group meeting Andrea Francescon.
LHCC Upgrade Session, 12 March 2013
1IPHC Strasbourg, France, 2CERN, Geneve, Suisse
WG4 – Progress report R. Santoro and A. Tauro.
F. Ronchetti, INFN-LNF, September
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Hybrid Mechanical/Thermal Design ideas
prototype PCB for on detector chip integration
LPKF Laser Direct Structuring System
Outer Endcap External Bus tape
Presentation transcript:

WP6 meeting 30/07/2013

Status of flex prototypes production New laser soldering tests Discussion on mass production schedule

Flex prototypes FHR order: 2 foils with 3 circuits, 25  m apical from Rui (obtained removing Cu layers bu chemical etching) + 15  m Al (compatible with chemical etching procedure at CERN), issue on first foil coated (Al peels off at the edge) due to bad quality of apical? Next: another test using 50  m apical from FHR and15  m Al + 2 foils coated with 25  m Al Goals: 1) check chemical and laser etching on two Al thickness; 2) electrical tests Delivered ….

Differential impedance simulations

New laser soldering tests Test performed at Neu Ulm not conclusive, issues with: – soldering grid design – Single chip flex: holes too small (160  m), metallisation? – Small SnAg balls (200  m) Laser soldering system rented at Dr Mergenthaler to optimize parameters (temperature profile, beam focusing) System to be installed in DSF, safety requirements to be verified next week with laser safety officer (actions for DSF?) Aim at starting at the beginning of September

Single chip flex, w/o coverlay, no soldering grid

Issues: -Mismatch between microscope and metallurgy pictures numbering -Most of solderings does not wet the chip pad Single chip flex, w/o coverlay, no soldering grid

Planning of staves assembly Inner barrel – 48 staves x % ~ 110 staves – 990 chips, solderings Outer barrel – 1602 modules +10% ~ 1800 modules – chips, solderings

Planning of staves assembly Assembly sequence hypothesis: 1)Placement of chips on vacuum table (auto): 9x10” ~ 90” (14 chips: 140”) 2)Placement of flex on vacuum table + grid on flex (man, pinholes): 300” 3)Alignment (auto): 300” 4)SnAg balls deposition + soldering of one chip (auto): 300” + 50x 10”= 800” Total per IB module: 2h 11’ -> 30 d for full IB Total per OB module: 3h 19’ -> ~ 750 d for full OB (1 d = 8h)

Planning for Layers 0, 1, 2, 3 and 4

Short term plans (for TDR final version) By the end of September: – Preliminary results on technology for Al flex production, chemical vs laser engraving – Preliminary results on chips embedding – Laser soldering: optimization of process parameters, tooling Critical issues – Design of flex depends on chips specs not available (i.e. power consumption: if 25 mW/cm 2 instead of 250 mW/cm 2 less constraints on Al thickness?) – Al flex processing dependence on Al layer thickness – Study of electrical characterization/ performance of flex