SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)

Slides:



Advertisements
Similar presentations
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
Advertisements

February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Ice Pile Air Conditioning Joseph Cooper: Project Lead Kylie Rhoades, Clara Echavarria, Jonathon Locke, Alex Gee.
Current status Arkadiy Klebaner November 21, 2012
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
March 14, 2002GJG NCSX CRYOGENICS DESIGN DEVELOPMENT STATUS WBS-63.
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX G. Gettelfinger for the NCSX Engineering Team November 10, 2004 NCSX Coil Test Facility Single Phase LN 2 Mechanical/Plumbing Final Design Review.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
NCSX NCSX TF Coil Conductor FDR 5/17/05 1 Michael Kalish NCSX TF Conductor.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
Cryoplant Controls Installation
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Proximity Cryogenics P&IDs Meeting
Proximity Cryogenics P&IDs meeting
Cryoplant Installation Scope
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Teleconference ACS – FREIA 17th October 2017
ESR 2 Presented to Joint Hall A/C Summer Meeting
as a prototype for Super c-tau factory
Cryogenic behavior of the magnet
ESR2 Process Cycle Design
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
ESR2 Process Cycle Design
Presentation transcript:

SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 2 Overview The stellarator core is supported by two cryogenic facility systems: –WBS 621 delivers LN 2 to the machine area. –WBS 622 performs heat removal from the field coils

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 3 Requirements WBS621 –Provide LN2 for distribution to: LN2 Coil Cooling system LN2/GN2 Structure Cooling WBS622 –Provide LN2 psig ) to coil distribution manifold (WBS16) for extracting heat from PF, TF and Modular Coils. –Maintain single phase flow.

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 4 Interfaces WBS621 –C-Site 9200-gallon LN2 tank –WBS-622 Coil LN2 circulation pump skid –WBS-623 LN2 supply to Cryostat –Test Cell Air monitoring system WBS622 –Coil LN2 distribution manifold –HVAC exhaust

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 5 Design Plans (WBS-621 LN2 supply) This is very straightforward. Flow rates, heat loads and pressure drops are already reasonably well known. Design will incorporate flow diagrams, and isometric piping drawings. Detailed component drawings will be minimal. This will allow many elements of the design of the system to proceed without requiring the “final” parameters. When final requirements for flow rates, heat loads and pressure drops are available, the components shall be procured, assembled and installed.

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 6 SIMPLIFIED LIQUID CRYOGEN DISTRIBUTION The cryogen distribution system makes full use of legacy equipment at C-Site. The 9200 gallon LN 2 dewar is ready for service. The helium off-load gear exists but requires general overhaul.

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 7 Design Plans (WBS-622 Coil Cooling) A pressurized, LN 2 heat removal loop is planned for the field coils. The prototype for this loop was operated for the coil testing. A scaled up version of the Coil Test Facility’s pump skid is required to support full field magnet requirements. WBS-622 scope provides system capable of removing ~50 MJ in a 15 minute recovery interval (about 56 kW avg.)

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 8 Simplified Coil Cooling Circuit

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 9 Design Plans (WBS-622 Coil Cooling) The C1 coil was cooled to the point that single phase liquid flow was established in the winding pack’s coolant channels –A success! –The single phase flow approach is validated –Technical risk is low

SC Project Review of NCSX, April 8-10, 2008 S. Raftopoulos - page 10 Summary WBS-621 LN2 supply –Sizing of piping is straight forward –Based on identified (calculated) heat loads, the capacity of existing C-site LN2 tank 9200 (gallon) is adequate. –Off-the-shelf components are used. WBS-622 Pressurized LN2 cooling for coils –Coil testing cooling loop validates design. –Full power coil heat loads have been calculated. –Required flow rates and pressure drops have been calculated. –LN2 delivery system can be sized to accommodate requirements –Standard industrial products make up the system.