CNMP Core Curriculum Section 4 — Manure and Wastewater Storage and Handling Emergency Action Planning
CNMP Development Core Training Curriculum These course materials have been developed as a cooperative effort between five land-grant universities and The Natural Resources Conservation Service. Ames, Iowa 50011, (515) Copyright © , Iowa State University of Science and Technology. All rights reserved. Copyright Information
Objectives To learn what an Emergency Action Plan (EAP) is and why one should be established for each Manure and Wastewater Handling, Storage and Application System. To become familiar with the various types of emergencies which can occur and the major components of an EAP. To introduce to the eight “C’s” of implementing the plan and review a sample EAP.
Required Materials National Planning Procedures Handbook, Amendment 4. Part Element Criteria for CNMP Development. /H_180_600_E_54.htm /H_180_600_E_54.htm Part Exhibit 15. Comprehensive Nutrient Management Plan - Format and Content. /H_180_600_F_6_x15.htm /H_180_600_F_6_x15.htm
Supplemental Materials –Experiences in Preparing a CNMP Emergency Response Plan for a Tennessee Dairy Farm. In Proceedings of 9th International Symposium Animal Agricultural and Food Processing Wastes, Raleigh, NC. ASAE, St. Joseph, MI, pp –Lesson 50: Emergency Action Plans. Livestock and Poultry Environmental Stewardship Program.
What is an Emergency Action Plan ?
JK9SM26T3N B48-27J JAN TO JUL COUNTY FARM
3.3.
Emergency Action Planning I.Why Have an EAP II.Types of Emergencies III.Components of the Plan IV.Implementing the Plan V.Example
Emergency Action Planning I.Why Have an EAP II.Types of Emergencies III.Components of the Plan IV.Implementing the Plan V.Example
I. Why Have an EAP Chain of events Prevention - CNMP Plan for a spill Minimize impact Work the plan
I. Why Have an EAP Chain of eventsChain of events Prevention - CNMP Plan for a spill Minimize impact Work the plan
I. Why Have an EAP Chain of events Prevention - CNMPPrevention - CNMP Plan for a spill Minimize impact Work the plan
SOLIDS MANURE VOLUME RUNOFF VOLUME TOTAL VOL. STORM VOLUME FREEBOARD SPILL- WAY FIG STORAGE POND CROSS SECTION (NRCS Part 651)
I. Why Have an EAP Chain of events Prevention - CNMP Plan for a spillPlan for a spill Minimize impact Work the plan
I. Why Have an EAP Chain of events Prevention - CNMP Plan for a spill Minimize impactMinimize impact Work the plan
I. Why Have an EAP Chain of events Prevention - CNMP Plan for a spill Minimize impact Work the planWork the plan
Emergency Action Planning I.Why Have an EAP II.Types of Emergencies III.Components of the Plan IV.Implementing the Plan V.Example
II. Types of Emergencies A.Manure Spill B.Confined Spaces C.Catastrophic Mortalities
II. Types of Emergencies A.Manure Spill B.Confined Spaces C.Catastrophic Mortalities
A. Manure Spill Spill will occur Spill is occurring Spill has already occurred
A. Manure Spill Spill will occurSpill will occur Spill is occurring Spill has already occurred
A. Manure Spill Spill will occur Spill is occurringSpill is occurring Spill has already occurred
A. Manure Spill Spill will occur Spill is occurring Spill has already occurredSpill has already occurred
II. Types of Emergencies A.Manure Spill B.Confined Spaces C.Catastrophic Mortalities
B. Confined Spaces Definition When emptying Gas build-up Access
B. Confined Spaces DefinitionDefinition When emptying Gas build-up Access
B. Confined Spaces Definition When emptyingWhen emptying Gas build-up Access
B. Confined Spaces Definition When emptying Gas build-upGas build-up Access
B. Confined Spaces Definition When emptying Gas build-up AccessAccess
II. Types of Emergencies A.Manure Spill B.Confined Spaces C.Catastrophic Mortalities
Emergency Action Planning I.Why Have an EAP II.Types of Emergencies III.Components of the Plan IV.Implementing the Plan V.Example
III. Components of the Plan Emergency contacts Agencies to notify within 24 hours Directions to the facility Response procedures Map of emergency application areas
III. Components of the Plan Emergency contactsEmergency contacts Agencies to notify within 24 hours Directions to the facility Response procedures Map of emergency application areas
Emergency Contacts Owner/Operator Name 911 Excavator Pump/plumbing contractor Local Law Enforcement Owner/Operator Name 911 Excavator Pump/plumbing contractor Local Law Enforcement
III. Components of the Plan Emergency Contacts Agencies to notify within 24 hoursAgencies to notify within 24 hours Directions to the facility Response procedures Map of emergency application areas
Agencies to Notify Within 24 hrs. Probably the State Department of Environmental Control Maybe the State Wildlife Resources Agency Maybe the State Department of Transportation Read the terms of the NPDES permit
III. Components of the Plan Emergency Contacts Agencies to notify within 24 hours Directions to the facilityDirections to the facility Response procedures Map of emergency application areas
III. Components of the Plan Emergency Contacts Agencies to notify within 24 hours Directions to the facility Response proceduresResponse procedures Map of emergency application areas
III. Components of the Plan Emergency Contacts Agencies to notify within 24 hours Directions to the facility Response procedures Map of emergency application areasMap of emergency application areas
Emergency Action Planning I.Why Have an EAP II.Types of Emergencies III.Components of the Plan IV.Implementing the Plan V.Example
IV. Implementing the Plan 1.Cease all other activities and devote full attention to the emergency 2.Care for any human injuries 3.Close the source of the spill 4.Contain the spill
5.Count the extent of the spill 6.Contact appropriate authorities 7.Clean up and Repair 8.Comply with reporting requirements IV. Implementing the Plan (cont’d.)
1.Cease all other activities and devote full attention to the emergency 2.Care for any human injuries 3.Close the source of the spill 4.Contain the spill IV. Implementing the Plan
1.Cease all other activities and devote full attention to the emergency 2.Care for any human injuries 3.Close the source of the spill 4.Contain the spill IV. Implementing the Plan
1.Cease all other activities and devote full attention to the emergency 2.Care for any human injuries 3.Close the source of the spill 4.Contain the spill IV. Implementing the Plan
1.Cease all other activities and devote full attention to the emergency 2.Care for any human injuries 3.Close the source of the spill 4.Contain the spill IV. Implementing the Plan
5.Count the extent of the spill 6.Contact appropriate authorities 7.Clean up and Repair 8.Comply with reporting requirements IV. Implementing the Plan (cont’d.)
5.Count the extent of the spill 6.Contact appropriate authorities 7.Clean up and Repair 8.Comply with reporting requirements IV. Implementing the Plan (cont’d.)
5.Count the extent of the spill 6.Contact appropriate authorities 7.Clean up and Repair 8.Comply with reporting requirements IV. Implementing the Plan (cont’d.)
5.Count the extent of the spill 6.Contact appropriate authorities 7.Clean up and Repair 8.Comply with reporting requirements IV. Implementing the Plan (cont’d.)
Emergency Action Planning I.Why Have an EAP II.Types of Emergencies III.Components of the Plan IV.Implementing the Plan V.Example
Parlor
Manure Sump
Earthen Storage
Pumping
Application
Application Fields
Page 15
Page 13
Page 14
Questions???