Fermilab User’s Meeting June 11, 2002 University Accelerator Research and Fermilab (Ongoing Projects and Opportunities for getting started)

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
What’s up at SLAC Linear Collider R&D organization Tom Himel SLAC Linear Collider Consortium Organizational Meeting Cornell April 19, 2002.
Jerry Blazey NICADD/NIU UCLC NICADD/NIU Accelerator R&D Proposal* Two Component Program : Benchmark flat-beam simulation codes vs. FNPL experiments. -
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
June 29, 2002David Finley to LC Retreat / Santa Cruz CASlide 1 Summary of Accelerator R&D David Finley / Fermilab Linear Collider Retreat / Santa Cruz.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
Jerry Blazey NICADD/NIU Lab/University Accelerator R&D Partnerships (Models, Progress, & Opportunities) Gerald C. Blazey Northern Illinois Center for Accelerator.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
September 9, 2002David Rubin/ Cornell 1 UCLC Briefing UCLC Briefing to the US LC SG Accelerator Review Committee September 9, 2002 David Rubin Cornell.
Jerry Blazey ICAR Review 9/10/03 Overview of Accelerator - ICAR Activities at NIU Accelerator Physics activities at NIU are rather diverse –Beam Physics.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
AAC May 6-8th, 2008 Accelerator Science at the A0 photoinjector and beyond P. Piot, APC/FNAL May 7 th, 2008.
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
Steve LidiaICFA Workshop, Chia LagunaJuly, 2002 Flat Beam Photoinjectors for Ultrafast Synchrotron Radiation Sources Steve Lidia Lawrence Berkeley National.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Operations, Test facilities, CF&S Tom Himel SLAC.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Fermilab April 5, 2002 Fermilab/NICADD Photoinjector Laboratory (FNPL): Collaborative R&D Gerald C. Blazey Northern Illinois Center for Accelerator and.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Free-Electron Laser at the TESLA Test Facility More than 50 institutes from 12 countries are involved in the TESLA Project The TESLA Collaboration: Three.
The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY Report from DESY, Hamburg, Germany.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
University Participation in NLC R&D Tom Himel SLAC NLC MAC review May 9, 2002.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Fermilab Accelerator R&D Strategy Steve Holmes URA Visiting Committee May 8, 2006.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
__________________________________________________________ _________________________________________________________________ HEP AP AARD sub-panel, Feb.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
J. Alexander + Cornell accelerator group Cornell University
Accelerator Research and Innovation for European Science and Society
SuperB Injection, RF stations, Vibration and Operations
R&D Topics for FOA Funding Proposals
WP11: electron and proton beam testing
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
CLIC-ILC BDS & MDI work.
Muon Acceleration using 8 GeV Proton Driver Linac
XFEL Project (accelerator) Overview and recent developments
Electron Source Configuration
Requests of Future HEP e+/e-Facilities
Fourier Series Pulse Compression Damping Ring Kicker
EIC Collaborations EIC Collaboration Workshop, JLAB Oct 28-Nov 1st
Prospect of Indo-US Collaboration
Presentation transcript:

Fermilab User’s Meeting June 11, 2002 University Accelerator Research and Fermilab (Ongoing Projects and Opportunities for getting started) Gerald C. Blazey Northern Illinois Center for Accelerator and Detector Design ( Northern Illinois University

Fermilab User’s Meeting June 11, 2002 Why? An interesting field in its own right, with interesting challenges and questions. Laboratories dominating the LC landscape (there is a well developed program for advanced concepts) Shortage of qualified physicists and resources committed to design and construction of new machines, both novel and “conventional”. Promotion of university programs in cooperation with existing HEP programs will foster innovation and increase number of qualified individuals. With regards to the linear collider much of our material and intellectual resources will be required.

Fermilab User’s Meeting June 11, 2002 Two Efforts Illinois Consortium for Accelerator Research (ICAR) The Fermilab/NICADD PhotoInjector (FNPL)  High Brightness PhotoInjector (HBPI) The linear Collider research topic database The evolving consortia/working groups –University Consortium for the Linear Collider (UCLC) centered at Cornell –Linear Collider R&D Working Group at Fermilab –Linear Collider R&D Opportunities at Stanford/SLAC Opportunities

Fermilab User’s Meeting June 11, 2002 Illinois Consortium of Accelerator Research 1999, IIT organized university consortium 2000, IIT, NIU, NW, UC, UIUC received funding from NSF and state of Illinois Current budget ~$2.5M/yr which supports in whole or part ~25 faculty and scientists. Resulted in three new accelerator faculty positions.

Fermilab User’s Meeting June 11, 2002 ICAR Activities Muon cooling –Simulations and theoretical investigations –Absorber development and engineering –Fast Instrumentation –RF cavity mechanical design –Linac Test Beam at Fermilab Neutrino factory feasibility studies I & II Proton Driver physics and design studies Photoinjector R&D for LC  collider studies Outreach: surveys, citizen involvement

Fermilab User’s Meeting June 11, 2002 Absorber, Magnet prototype Site of Linac LH2 Absorber Beam Test Cryo ready in one year.

Fermilab User’s Meeting June 11, 2002 Photogrammetric studies of window performance (minimum heating, heat management, safety) Beam detection and profiling using bolometry (strips of material on the absorber window that change resistance when radiated.) Focus on Component Testing

Fermilab User’s Meeting June 11, 2002 FNPL Electron A0 Jointly operated by Fermilab/NICADD Beam Physics International Facility (Chicago, Georgia, Michigan, NIU, Rochester, Fermilab, DESY, CERN, LBNL)

Fermilab User’s Meeting June 11, 2002 FNPL Activities Beam Physics –Flat Beam Studies –Plasma Wakefield Acceleration –Laser Acceleration –Studies of Space Charge –Coherent Synchrotron Radiation Studies Electron Beam Diagnostics Superconducting RF Cavity Development RF Gun Development Theses –Five completed –Three current (plasma and laser acceleration, flat beams) Open to new collaborators, ideas!

Fermilab User’s Meeting June 11, 2002 Flat beam generation could simplify requirements for Linear collider electron damping rings! Energy Fragmentation post bunch compression degrades luminosity and FEL capabilities. Simulation of wakefield acceleration through plasma shows 72 MeV/cm gradient. Experimentally confirmed! EE Beam Energy Profile Emittance Ratio ~40

Fermilab User’s Meeting June 11, 2002 A High-Brightness Photoinjector A collaboration modeled on large detector collaborations for the construction and operation of a high-brightness electron beam at Fermilab. Five year construction, then operation. Advanced beam research and machine development  promotes university based research The collaboration presently includes seven universities and three laboratories. Have encouragement from Fermilab. Site selection and timescales under discussion.

Fermilab User’s Meeting June 11, 2002 Notional Layout of Photoinjector (as envisioned by DESY) Emittance ~1 micron, Bunch Length <270 microns Energy 140  300 MeV

Fermilab User’s Meeting June 11, 2002 The LC R&D List Tom Himel, SLAC, has assembled a database of accelerator LC R&D in response to requests from the university community. Contains a wide variety of priorities, project sizes, and needed skills. About 80 NLC, TESLA, and generic accelerator R&D items are on the list On Web: project.slac.stanford.edu/lc/Project_List/intro.h tmhttp://www- project.slac.stanford.edu/lc/Project_List/intro.h tm

Fermilab User’s Meeting June 11, 2002 List Example ID: 16 Priority: Medium project_size: Large skill_type: physicist short project description: superconducting quadrupole vibration test Detailed project description: There are two options for the final doublet magnets: permanent and superconducting. The main concern about the superconducting method is that coils will vibrate too much since a strong support to the cryostat would cause a big heat leak, and boiling helium may jiggle the coils. Either by calculation, or finding an appropriate magnet, convince people that the quadrupole fields center will move by less than a nm relative to the outside of the cryostat. Needed by who: NLC and TESLA present status: good idea needed Needed by date: 6/1/2005 ContactPerson1: Joe Frisch WorkPhone1: Address1: Note that the contact person is someone who knows more about the project. He’s not the person who will arrange who works on what.

Fermilab User’s Meeting June 11, 2002 New Organizations –Framework for detector/accelerator R&D on LC. –Currently: 3 evolving groups (Cornell, Fermilab, SLAC) 2 funding agencies (NSF & DOE) 1 Linear Collider –Relationships evolving NSF groups naturally cluster under a single proposal submitted by Cornell? DOE groups naturally cluster w/ Fermilab & SLAC under a single proposal? But work where convenient & communicate! Proposals vetted by the USLCSG Working Groups

Fermilab User’s Meeting June 11, 2002 History/Upcoming Dates April 5 th, Fermilab Meeting, 123 participants April 19 th, University Consortium for the Linear Ithaca, 55 participants May 30 th, Linear Collider R&D SLAC, 106 participants June th, Santa Cruz –Linear Collider Retreat w/ Acc. R&D Sessions. –UCLC statements of interest –Joint Fermilab/SLAC meetings September, NSF submission

Fermilab User’s Meeting June 11, 2002 Suggested Topics at Fermilab NLC Structures Vibration Analysis Permanent Magnets Injectors: FNPL and upgrade & simulations Beam Instrumentation Plenty of opportunity for post- docs/students. Group meets twice monthly.

Fermilab User’s Meeting June 11, 2002 Conclusions There is significant and increasing university sponsored R&D occurring at Fermilab. The skill set is similar to HEP. There is ample opportunity to get involved. Support comes from the universities and funding agencies – we have to convince one another. The new organizations offer a likely opportunity!