FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.

Slides:



Advertisements
Similar presentations
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Advertisements

MICE Radiation Shield Design review for the proposed ‘Direct Drive’ MICE Spectrometer Radiation Shield 17/11/2011Norbert Collomb.
Beams Extremely common structural element
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Vacuum Vessel Production Readiness Review
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
ITER VV supports Cadarache 6 September 2007 A. Capriccioli.
MAE 314 – Solid Mechanics Yun Jing
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
-1- ICST/HIT The 23 rd MICE Collaboration Meeting Jan.13 to 17, Harbin/China MICE/MuCool Coupling Magnets Vacuum Vessel Design Guo, Xinglong.
FEA of Moller Hybrid Vacuum Chamber J Kelsey Oct 2013.
Superconducting Large Bore Sextupole for ILC
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
F.E.T.S. RFQ Support Structure by Peter Savage 21 ST October 2009.
Cavity support scheme options Thomas Jones 25/06/15.
MERLIN BEAMLINE RIXS refocusing mirror system D. Yegian
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
Magnets and Supports Bob Wands October 20, 2006 PPD/MD/Engineering Analysis Group Fermilab 4 th Concept Detector at Fermilab October, 2006.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Mechanical Designs of The Central Detector Jinyu Fu
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
56 MHz SRF Cavity and Helium vessel Design
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
LARP Collaboration Meeting Racetrack Coil Fabrication
Cavity support scheme options Thomas Jones 25/06/15 1.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
16 T dipole in common coil configuration: mechanical design
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
LHCb RICH2 Analysis of Super-Structure
HCAL preliminary analysis and results
The Budker Institute of Nuclear Physics
Crab Cavity HOM Coupler Specification Drawings & Tolerances
F.E.T.S. Mechanical Engineering Update
Status of design and production of LEP connection cryostat
PANDA Yoke of the Magnet
Repairing the MSE Mirrors
- chambers & absorbers -
Design of Distribution Feedbox at LHC P7
LARP Phase II Secondary Collimator RC-0 and RC-1
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Presentation transcript:

FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007

Timescale for delivery of first tank Met with Stainless Metalcraft on 29 th May Need to deliver tank by year end Finalised drawings to manufacturer by September Finalise design by end of July / early August – 6 to 8 weeks There is no margin!

Ion source flange PEEK/PVC isolator Lifting lugs Turbovac 340M Rail system Door chassis Mirror motor cradle 90 0 magnets and faraday cup 6 x Turbovac MAG W830 CF160 vacuum port Toroid KF40 laser port Solenoid The beam profile measurement tank conceptual design CF100 cable port

Looking upstream (1) The 90 0 magnets are mounted on the tunnel closure plate (2) The ALIO mirror motors mount in a cradle (white) that will attach to the door chassis (yellow). The complete door assembly runs on a rail system. (1) (2)

QN: What thickness of stainless steel is sufficient for this vacuum vessel? Model 1: Simple 2D flat plate D:\Pete\FEA\ANSYS\PressureVessel\FETS_First_Tank\Vfn_FlatPlate

Flat plate Dimensions: 900mm x 650mm x 10mm thick Edges fully constrained Pressure of 15PSI on one face Material = 316 stainless steel

Flat plate Dimensions: 900mm x 650mm x 10mm thick Edges fully constrained Pressure of 15PSI on one face Material = 316 stainless steel Max deflection = 2mm Max stress = 167 MPa Max deflection = 2mm Close to being too high! 500MPa is the limit but would like a good safety margin. Check for compliance with CERN’s CODAP code.

Model 2: Half tank D:\Pete\FEA\ANSYS\PressureVessel\FETS_First_Tank\HalfTankNoSupports

Half tank, cut in XY plane Dimensions: 900mm x 650mm x 10mm thick Fully constrained along split plane Pressure of 15PSI on one face Material = 316 stainless steel

Max stress = 136 MPa Bit better! Max deflection has gone up to 2.3mm from 2mm and the stress has fallen indicating that model 1 was over constrained

Model 3: Half tank with supports D:\Pete\FEA\ANSYS\PressureVessel\FETS_First_Tank\HalfTankWithSupports

Flat plate Dimensions: 900mm x 650mm x 10mm thick Edges fully constrained Pressure of 15PSI on one face Material = 316 stainless steel Max deflection = 2mm Half box with support rods to stop bend Dimensions: 900mm x 650mm x 10mm thick Fully constrained along split plane Pressure of 15PSI on one face Material = 316 stainless steel Support rods

Flat plate Dimensions: 900mm x 650mm x 10mm thick Edges fully constrained Pressure of 15PSI on one face Material = 316 stainless steel Max deflection = 2mm Displacement vector sum Deflection = 0.6mm which is a good improvement on the 2.3mm for the half tank with no rods.

Flat plate Dimensions: 900mm x 650mm x 10mm thick Edges fully constrained Pressure of 15PSI on one face Material = 316 stainless steel Max deflection = 2mm Displacement vector sum BUT… Max stress = 259MPa – too high! Need to fillet corners to reduce stress concentration

Model 4: Half tank with no supports and circular cutaway D:\Pete\FEA\ANSYS\PressureVessel\FETS_First_Tank\HalfTankNoSupportsCutaway

Displacement vector sum Fully constrained at split plane and at circular face. Atmospheric pressure on main plate. 10mm wall thickness

Displacement vector sum Maximum stress = 38MPa = nothing! Maximum displacement = 0.09mm BUT, how valid is model?

Conclusions: 10mm thick 316 stainless steel plate is sufficient for this design BUT care must be taken to avoid stress concentrations and large unsupported areas. (Mention mounting of toroid – problem may go away). Support system – need to finalise the rail system that mounts to the support benches. This will determine the total support/rail system height which, with a known beam height of 1650mm from the floor the first tank support structure can be designed. Mounting for ion source and isolator. Ideally we would understand how the ion source attaches to the tank via the isolator. Mounting to solenoid – meeting tomorrow

The latest first tank shown mounted on the support stand. This design shows a smaller main vessel to reflect the confirmed solenoid OD of 353mm.