Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Advertisements

Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
1 Pressure observations at TDI till fill 2158 V. Baglin (27/08/11) CERN TE-VSC, Geneva 1. 2.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Electron cloud measurements in Cesr-TA during the July-August run for the SPSU Study Team, report by S. Calatroni and G. Rumolo thanks to J.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
Long Shutdown for the LHC: Vacuum Beam Pipes
Electron cloud & vacuum pressure observations: 2011 proton run
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
Tuesday Nov 16th Fill 1492 into physics around 07.30
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Scrubbing progress - 09/12/2012
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Week 36 plan Todo’s: And also: 12+b injection.
Sunday morning Recovering from 400 kV disturbance.
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Monday – Morning Fill 3265 stable beams since 1:31
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Friday 25 bunch fill dumped just before (BLM in 5)
Tuesday morning 08:30-09:00 Squeeze with probe.
Summary first Scrubbing test 31/10/2010
IP8 aperture measurements (07:30-10:30)
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Thursday 22 September 2011.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Wednesday 26 October 2011.
Wednesday morning Waiting for PS – problem on RF cavity.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Tuesday
Presentation transcript:

TE-VSC Group J.M. Jimenez Installation (temporary) in the RP Bunkers (UJs)

TE-VSC Group J.M. Jimenez Solenoids between DFBX and D1 in IR1L TE-VSC Group J.M. Jimenez

TE-VSC Group J.M. Jimenez Solenoids between DFBX and D1 in IR1R Solenoid A4L1 - ON TE-VSC Group J.M. Jimenez

TE-VSC Group J.M. Jimenez Fill 1404 Injection Study with train of 24 Bunches 10/10/10 – 15:00

TE-VSC Group J.M. Jimenez Injection Study with train of 24 Bunches 10/10/10 – 15:00 Start increase pressure on both lines when the number of protons in the machine is about: Beam B=1E13 Beam R=8E12 Test Solenoid A4L1 T=40C = 6A Test Solenoid A4R1 T=40C = 8A Solenoid A4L1 - ONSolenoid A4L1 - OFF Solenoid A4R1 - ONSolenoid A4R1 - OFF DUMP

TE-VSC Group J.M. Jimenez Injection Study with train of 24 Bunches 10/10/10 – 15:00 A4L1.XSTART (No beam – Solenoid OFF)Solenoid ONSolenoid OFF VGPB.7.4L1.X1.9E-102.7E-103.8E-9 VGPB.9.4L1.X1.3E-102E-102.7E-9 A4R1.XSTART (No beam – Solenoid OFF)Solenoid ONSolenoid OFF VGPB.7.4R1.X1.9E-102.7E-101.1E-9 VGPB.9.4R1.X3.9E-104.2E-109.2e-10 There was an expected dump of beams due to lost during injection, so the final pressure without the solenoid are lower than expected. Temperatures on the TC: A4L1: CH 6= 26  C A4R1: CH 2= 24  C CH6= 26  C Stable beams should be guaranteed in order to have better indication of temperature increase

TE-VSC Group J.M. Jimenez Solenoid A4L1 - ONSolenoid A4R1 - ON TE-VSC Group J.M. Jimenez

TE-VSC Group J.M. Jimenez Acknowledgements Many thanks to V. Baglin, G. Bregliozzi, N. Zelko, S. Blanchard, A. Sinturel, A. Marraffa and B. Rio for their help this weekend. Vacuum, Surfaces and Coatings Group Technology Department

TE-VSC Group J.M. Jimenez TE-VSC Group J.M. Jimenez