Development of A Prior Environmental Review Support System in Korea 2007. 6. 7 Eui Sung, Jung.

Slides:



Advertisements
Similar presentations
ISDR Asia Partnership Disaster Risk Reduction (DRR) Project Portal ( An Introduction.
Advertisements

ASIAES Project Overview Satellite Image Network for Natural Hazard Management in ASEAN+3 region Pakorn Apaphant Geo-Informatics and Space Technology Development.
Web-Based Planning Tools for Missouri Show-Me Ag Classic February 1, 2006 Columbia, MO Chris Barnett Center for Agricultural, Resource and Environmental.
Colorado Secretary of State e-FILING COLORADO ADMINISTRATIVE RULES CODE OF COLORADO REGULATIONS ONLINE PORTAL FOR e-FILING AND RULE ACCESS Colorado Secretary.
Microsoft Office Illustrated Fundamentals Unit C: Getting Started with Unit C: Getting Started with Microsoft Office 2010 Microsoft Office 2010.
IIT Kanpur Web Based Land Records Management System Prof. P.K.Kalra Developed by Department of Electrical Engineering Indian Institute.
PROACTIS: Supplier User Guide Registering an interest in a tender opportunity.
Single Contents Registration Manual National Institute of Informatics
Holyoke Public Schools Professional Development By, Judy Taylor
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
Hiring Reform Implementation SFC Wilma Alicea Human Resources Specialist JFHQ-PR, HRO (787) x 1218 Application Process USAJOBS – Application Manager.
Welcome to EDINA Digimap Digimap is an EDINA service offering online access to a range of spatial data. It is authenticated using Athens and is available.
Welcome to EDINA Digimap Digimap is an EDINA service offering online access to a range of spatial data. It is authenticated using the UK Federation and.
Enterprise Search With SharePoint Portal Server V2 Steve Tullis, Program Manager, Business Portal Group 3/5/2003.
Simfund Filing Training Introduction First Look Step by Step Training.
Development of Japanese GIS Tool for use in the Humanities ○ Masatoshi ISHIKAWA †, Yoichi KAWANISHI ††, Hidefumi OKUMURA †††, Shoichiro HARA †††† † University.
Quick Start Guide. This 22 page introduction to the Financial Assessment Subsystem provides the user with a visual overview of the components of the system.
What is so good about Archie and RevMan 5
Temporary Removal Request Demo 1.Role of Unit Maker 1.Preparation of Temporary Removal RequestPreparation of Temporary Removal Request 2.Submission of.
OARE Module 5B: Searching for Scientific Research Using Environmental Issues and Policy Index (EBSCO)
Rimantas Ramanauskas Kazys Maksvytis Alvydas Janulevičius State Enterprise Centre of Registers INTEGRATED PROCESSING OF DIGITAL CADASTRAL DATA IN LITHUANIA.
May 17, 2005 E-sign Web Forms replace Paper Forms Presented by: Bob Schneider Western Washington University.
Understanding the IRS 990n e-Postcard COPYRIGHT 2010 Gold Wing Road Riders Association, Inc. All rights reserved under International and Pan-American Copyright.
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum “Procurement.
XP New Perspectives on Browser and Basics Tutorial 1 1 Browser and Basics Tutorial 1.
Introduction to eziLink Training For the Ministry of Forests and Sustainable Resource Management.
BioWeb … an online resource for bioenergy and bioproducts Sun Grant BioWeb … an online resource for bioenergy and bioproducts BBI Biofuels Conference Nashville,
Development of metadata in the National Statistical Institute of Spain Work Session on Statistical Metadata Genève, 6-8 May-2013 Ana Isabel Sánchez-Luengo.
Part 1 – PubMed Interface, Display options, Saving, Printing, and ing results. Instructions This part of the course is a PowerPoint demonstration.
Introduction to the RDA Toolkit 12 May Navigating the RDA Toolkit.
Sub-Contracting Request Demo 1.Role of Unit Maker 1.Preparation of Sub-Contracting RequestPreparation of Sub-Contracting Request 2.Submission of Sub-Contracting.
Ministry of Energy, Development and Environmental Protection of the Republic of Serbia Development of the Ecoregister, a national metaregister for environmental.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
FGDC and GOS Metadata: Foundations to Build the NSDI Sharon Shin FGDC Secretariat / Geospatial One-Stop.
Turnitin is an application that helps support the development of your skills in preparing written assignments.
Capital Budget System (CBS) Agency Training 1. Introductions… Name Name Agency Agency Capital Budget System Role Capital Budget System Role Goals for.
BioWeb … an online resource for bioenergy and bioproducts Sun Grant BioWeb … an online resource for bioenergy and bioproducts March 22, 2007 World Congress.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
1 MANAGEMENT OF THE ST ScI ELECTRONIC GRANTS MANAGEMENT SYSTEM BY INSTITUTIONAL ACCOUNTING STAFF September, 2000.
Okalo Daniel Ikhena Dr. V. Z. Këpuska December 7, 2007.
PubMed Overview From the main HINARI webpage, we can access PubMed by clicking on Search HINARI journal articles through PubMed (Medline). Note: If you.
ViciDocs Safe Creating Info repositories from documents.
Registration Solutions for your Event Management.
1 SERD Project Director’s Conference CRIS OVERVIEW Education Component Current Research Information System March 30, 2005 Dr. Irma A. Lawrence National.
September 2012 Developed by Agricultural and Biological Engineering Department at Purdue University and Department of Regional Infrastructures Engineering.
Support.ebsco.com Points of View Reference Center Tutorial.
Strategic approach to national implementation programmes for SEEA by UNSD Sixth Meeting United Nations Committee of Experts on Environmental Economic Accounting.
INTER-AMERICAN DEVELOPMENT BANK Business Opportunities IDB Financing in Latin America and The Caribbean May 2016.
SIGMA Requestor Training In this presentation we will cover : How to log a Sigma ticket How to update a ticket via the notification function How.
PubMed Overview From the main HINARI webpage, we can access PubMed by clicking on Search HINARI journal articles through PubMed (Medline). Note: If you.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
Electronic – Statutory Financial Return (E-SFR) Timae Flood Bermuda Monetary Authority.
Payment Center Self Enrollment and Making a Payment
Software Application Overview
**Please view the instructional guide as a slideshow**
Land Registry Computerization Project
Historic Digimap Historical maps and data from the Ordnance Survey maps from the 1840s to the 1990s. digimap.edina.ac.uk.
Management Information System - MIS
Underground Injection Control
NORTHEASTERNERS, INC. IRS 990 filing instructions presentation
Bradford VTS Web Pages for General Practice ONLINE RESOURCES
Introduction of KNS55 Platform
Microsoft Office Illustrated Fundamentals
Korean Studies DB User Manual
What is StudentWeb? In StudentWeb you can access:
WHERE TO FIND IT – Accessing the Inventory
Presentation transcript:

Development of A Prior Environmental Review Support System in Korea Eui Sung, Jung

I. Introduction 1. Project Overview 2. Project Objective 3. System Objective by Stage - 1 -

1. Project Overview Title Duration Organization ■ Development of a Prior Environmental Review Support System (PERSS) ■ May, 3, ~ December, 2, 2006 (7 Months) ■ Director : Ministry of Environment ■ Responsible Body : Korea Environment Institute, Pangaea 21 PERS : The Prior Environmental Review System (PERS) aims to balance development and preservation by identifying possible environmental impacts of development plans or projects in the early stages of planning. Unlike the current PERS, EIA mostly deals with large-scale development projects during the execution stage after plans have been approved and confirmed. The introduction of the PERS should remedy EIA limitation.

2. Project Objective ■Systematical management of PERS information - Share PERS information by implementation of PERS database, which enhance PERS efficiency and quickness - Link between PERS information and EIA information, - Prepare a foundation of regional cumulative Environmental Impact Assessment and Strategic Environmental Assessment ■Maintain consistency of a PER agreement opinion between Ministry of Environment and Regional Environmental Office - Eliminate inconsistency of a PER agreement opinion between Ministry of Environment and Regional Environmental Office through mutual information sharing via PERSS - Support PERS business process using information technology ■Maximize availability of existing environmental information - Set a basis of information exchange among responsible body - Curtail national budget and developer’s cost by environmental knowledge sharing - Link between development project site and the Environmental Assessment Map of Korea - 3 -

3. System Objective by Stage year 2007 year2008 year Amend Law / Regulation Provide review statement submission as CD Provide digital document standard for PERS Provide land use suitability factors Building Data base Accumulate PERS historical data (9,000) Design data input system / Implement Pilot system WEB base input system Collect existing agreement opinion data Historical PERS project data mgmt PERS agreement opinion Full text of review statement / Project summary Study digital document standard Automatic input process via CD and digital document System Manage ment Extend range of supporting information Web Service System Operation System networking Using existing Resource Extend server H/W System detach from EIASS History, full-text, summary data exchange with EIASS Implement and run PERSS Provide public opinion collecting framework GIS data exchange with EIASS Development data input system ITEM - Full text of review statement (213) - Project summary(9,000 건 )

1.System Overview 2.System Diagram 3.System Review II. System Detail - 5 -

1. System Overview System Login Responsibl e User Public User After Login Login Screen

2. System Diagram a. Public User GIS DB Outline DB General DB Developer Public and NGO Academy / Institute Using Body Supporting PERS (Public User) Search of PERS project Land use suitability consulting Search of PERS GIS Similar project in neighbor Project site location Data Base Partial project summary and history data Full statement of agreement opinion Self-assessment (Use GIS data) Request of self-assessment Saving self-assessment result Notice Notice / Q & A PERS Knowledge Online manual Knowledge of drawing review statement Basic knowledge of PERS Related law and report Full statement text DB Related Body ※ A project which is under the EIA process, is not open

2. System Diagram (continue) b. Responsible User Supporting PERS (Responsible User) [Public user service] Full service Mgmt of Full statement Manage review statement CD Determine open to public Mgt of land use suitability Manage application list Allocate application Mgmt of PERS project state Register PERS project state Mgmt of the others Notice/Visitor statistic/Etc Search of PERS project state Whole project summary and historical data Search of Full statement Full text of review statement and agreement opinion with index + Statistic of PERS Various types of statistical data Link EIA applied project Policy maker (ME etc) Assessment Agency (Restricted) Relate Official (Restricted) Using Body Responsible Official GIS DB Full text DB Outline DB Managerial DB Data Base Knowledge DB

(Public user – without login) 3. System Review a. Query of PERS project list(User page) 1.Only agreement opinion can be listed 2.List sorted by responsible body 3.List can be selected with title, developer name ※ A project which is under the EIA process, is not open 1.GIS location data can be available with login 2.List sorted by responsible body 3.List can be selected with title, developer name ※ A project which is under the EIA process, is not open (Public user – with login) Title Accept / Reply date Agreement Opinion title Accept / Reply date Agreement Opinion GIS location Query Responsible body

3. System Review b. Query of full text review statement(User page) ※ Advanced search ① Keyword search - List can be selected various restrictions (Title, Related Regulation, Responsible body, Year, Agreement result) ② List - Result by keyword search - Full review statement, agreement opinion, gis location data can be viewed (Responsible user) ※ Basic search ① Keyword search - List can be selected various restrictions (Title, Related Regulation, Responsible body, Year, Agreement result) ② Location search : click and select region on the map ③ Related regulation search : click and select regulation ④ Responsible body : click and select responsible body Basic searchAdvanced search Location Related Regulation Responsible Body Title Related Regulation Full text of review statement Agreement opinion GIS info

(Public user) 3. System Review c. PERS project summary contents(User page) Overview Title Location Related regulation Summary Responsible body Scale Expected benefit Project History Status of the agreement Full text of agreement opinion

(Responsible User) 3. System Review d. PERS project summary contents(User page) Overview Title Location Related regulation Summary Responsible body Scale Expected benefit Project History Receipt for review application Full text of review statement Progress info Full text of review statement by index

System Review e. Register PERS project summary (Managerial page) (Responsible User) Register project summary Overview Title Title type Location Related regulation Developer EIA Applicable? Project History PER review statement receipt Date Public Open? CD copy?

System Review 1. Log-on is requisite for consulting 2. File attachment is Available f. Request form for land use suitability consulting(User page) (Public user) Applicant Information Project address Area Objective Type Progress Present condition Reference data File attachment

System Review g. Respond to consulting request(Managerial page) (Responsible User) 1.Reponsible user respond consulting request as a response form 2.Responsible body can be change by project address Consulting request list Request form detail Responsible body Applicant Information Project address Area Objective Type Progress Present condition Reference data File attachment Response form Opinion Regulation conflict Important review item

h. PERS data download(Managerial Page) System Review (Responsible User) Number of annual PER project by query Agree Conditional Agree Disagree Download as Excel Download summary of PER project by query Regulation Download as Excel Address Title Year Stat type 1. Summary and statistical data can be downloaded as Microsoft Excel form 2. Summary and statistical data can be restricted by search condition

Web based GIS service AND practical use of NEAM(National Environmental Assessment Map) EIASS(Environment Impact Assessment support system) data link i. GIS data overview 협의내용 원문 1.PER / EIA project site location service via internet ① PERS spatial DB ② EIA spatial DB ③ NEAM spatial DB 5. Provide environmental measure data in the neighborhood of project site 2. Search by address 3. For various view, several theme map can be layered 4.Using NEAM, determine land use constraints and measure area by grade 측정질정보 사업지개요 Project summary and PER/EIA full text in the neighborhood of project site Environmental measure data NEAM area size by grade Land use constraints in NEAM PER GIS NEAM EIA GIS EIA Summary Constraints Process support PER full text PER summary System Review

WEB-GIS Screen organization 1.Theme map 2.Map control : use toolbar - Move / Zoom in/ Zoom out/ Range/ Full map - Attribute view - Distance/ Area measure - Image save/ print - NEAM grade - Area size by NEAM grade 3.Theme screen 4.Index map 5.PER project search System Review j. GIS screen organization

An address can be usable for location search in the map 1. Basic map + PER site + EIA site Proposed development area 1 Theme map of Both sides can be selectable. Ex) Left :Project site + Basic map Right :Project site + NEAM 3. System Review k. GIS data search

2. Project summary and measure date in the neighborhood Use this button in the upper toolbar to view environmental measure data and project summary 2 3. System Review l. PER / EIA project in the neighborhood Proposed development area

3. Use NEAM for determine location constraints Using a theme map layer in the left control panel, developer can determine location constraints such as legal and ecological Agricultural protection Forest Map -age-class Forest Map - density are Development protection Road and urban area Forest Map - girth-class Ecological Map Mountainous Area 3 3. System Review m. Determine location constraints Proposed development area

4. Use NEAM for ecological grade analysis in expecting development area and measure area size by grade Use this button in the upper toolbar to analyze ecological grade in proposed development area and measure area size by grade System Review n. Ecological grade analysis

Self- assessment of development location ※ 반경입력 : km Location search using address Approximate compass radius (Left image) PERS project site + EIA project site + Basic map (Right image) PERS project site + EIA project site + Basic map  Zoom in, Zoom out, Pan, Image save 5. WEB-GIS Page link (for detail GIS information) 3. System Review o. Self- assessment of development location Result of self-assessment

Thank You. (Q & A)