Proposed Reasonable Progress Rule Workshop Brief Background and Procedure Public Workshop June 14, 2007.

Slides:



Advertisements
Similar presentations
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Advertisements

RH Requirement for BART  §308 (e) contains BART requirements for regional haze visibility impairment…. The State must submit an implementation plan containing.
Regional Haze Update & Current Results Michele Notarianni Brenda Johnson EPA Region 4.
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Environmental Management Commission.
1 NC-DAQ Educational Opportunities Series 18 March 2015 Regional Haze Discussions and Issues in North Carolina.
Identification of BART-Eligible Sources in the WRAP Region A Summary of the April 4, 2005 Draft Report.
GHG Applicability Criteria. Introduction to PSD GHG Applicability As stated earlier, Tailoring Rule does not change basic applicability process Incorporation.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Proposed Reasonable Progress Rule Workshop Second Public Workshop August 1, 2007 Tallahassee, Florida.
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
1 Year in Review: Clean Air Act Presented by: Tom Wood Stoel Rives LLP October 8, 2010 Things Are Getting Really Complicated.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
Air Protection Branch 1. 2 Air Quality Activities Support the Mission of the Air Protection Branch Monitor and Report Air Quality Data Analysis and Planning.
Regional Haze Rule Guidance: Tracking Progress & Natural Levels Overview of the concepts currently envisioned by EPA working groups by Marc Pitchford;
Air Pollution Control Board October 1, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management We Protect.
AIR QUALITY for the Interagency Wilderness Fire Resource Advisor 2011 SOUTHERN AREA ADVANCED FIRE AND AVIATION ACADEMY Discussion Topics: Very Brief Overview.
The Impact of Greenhouse Gas Regulation on Energy Production: Legal Framework for Greenhouse Gases Standards for Fossil-Fuel Fired Electric Generating.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
The Western Regional Air Partnership (WRAP) WRAP formed in 1997 as the successor organization to Grand Canyon Visibility Transport Commission (GCVTC) –
Final Amendments to the Regional Haze Rule: BART Rule Making June 16, 2005.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
Proposed Rulemaking 25 Pa. Code Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review John Slade, Chief Division of Permits Bureau.
Regional Haze Rule Best Available Retrofit Technology Government to Government Consultation Navajo Nation Environmental Protection Agency.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
Air Quality Benefits from Energy Conservation Measures Anna Garcia April 2004.
1 Potential Impacts of a National SO 2 Program WRAP Forum June 3, 2004.
ALTERNATIVES TO BART -TRADING- Lily Wong USEPA – Region 9 September 1, 2005.
Stationary Sources Joint Forum Update Eric Massey Arizona Department of Environmental Quality Lee Alter and Patrick Cummins Western Governors’ Association.
BART Guideline Overview WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
REGIONAL HAZE BART – Key Issues For Consideration Eric Massey, Arizona DEQ Lee Alter, WGA SSJF Meeting June 3, 2004 Denver, Colorado.
1 EPA’s Climate Change Strategy Robert J. Meyers Principal Deputy Assistant Administrator U.S. EPA, Office of Air and Radiation December 3, 2007.
HAP Rule 372 Guidance Permitting Division Maricopa County Air Quality Department.
1 Colorado BART APCD. 2 Class 1 Areas National Parks and Wilderness Areas 12 in Colorado 4 National Parks 8 Wilderness Areas.
Regional Haze SIP Development Overview AQCC Presentation July 2005.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OZONE-DEPLETING SUBSTANCE PHASEOUT ISSUES TED KOSS
1 Conducting Reasonable Progress Determinations under the Regional Haze Rule Kathy Kaufman EPA Office of Air Quality Planning and Standards January 11,
Navajo Nation Interest’s In EPA Rulemakings Affecting EGU’s National Tribal Forum May 22-24, 2012 Tulsa, Oklahoma Anoop Sukumaran, Navajo Nation Environmental.
BART SIP Development: Example from Colorado Rocky Mountain National Park WRAP IWG Meeting, Denver, CO August 29, 2007 Presented by: Ray Mohr and Curt Taipale.
Air Quality Policy Division D P A Q 1 Regional Haze Update WESTAR September 17-19, 2007 EPA Office of Air Quality Planning & Standards.
EPA – Regional Haze Issues IWG Meeting April 17 th Keith Rose and Laurel Dygowski.
BART Identification Project Update Lee Alter, WGA Stephanie Finn, ERG SSJF Meeting June 2-3, 2004 Denver, CO.
How to Develop a Greenhouse Gas Emissions Inventory AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Broward County Pollution Prevention, Remediation and Air Quality.
Reproposal of the Regional Haze Rule and BART Guidelines.
Recommendations from Regional Haze Workgroup Core Issue 1: 5- Year Progress Reports The RHR requires Comprehensive SIP revision every 10 years (first in.
Alternatives to BART Rule Discussion with WRAP Nov , 2006.
Summary of June 15, 2005 Revisions to RH BART and BART Guidelines.
VISIBILITY SIPS The Regional Haze Rule Requirements for Fire The Role of the RPOs Opportunities for Participation US FISH AND WILDLIFE SERVICE Dennis Haddow.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
Pulp & Paper Sector Strategy & New Source Performance Standards Strategy Peter Tsirigotis, Director Sector Policies & Programs Division National Association.
A Basis for Control of BART Eligible Sources
Clean Air Act Glossary.
BART Overview Lee Alter Western Governors’ Association
Status of Regional Haze Rule
Western Regional Haze Planning and
EPA Clarification on Regional Haze SIP Issues
WRAP Stationary Sources Forum Meeting November 14-15, 2006
Workshop Technical and Policy Studies to Support the Annex
Summary of RH-LTS Requirements (d)(3)
Market Trading Forum Update
RA BART Overview Deb Wolfe 8/9/2019.
EPA’s Roadmap for the Second Planning Period
Presentation transcript:

Proposed Reasonable Progress Rule Workshop Brief Background and Procedure Public Workshop June 14, 2007

Regulatory Requirements Clean Air Act – Sections 169A and B Federal Rules – Federal Register, Vol. 64, No. 126, Thursday, July 1, 1999 – “Regional Haze Rule” 40 CFR Part 51, Subpart P – Protection of Visibility Federal Guidance on Reasonable Progress Guidance for Setting Reasonable Progress Goals Under the Regional Haze Program, U.S. EPA, June 1, 2007, rev

National Goal ”Congress hereby declares as a national goal the prevention of any future, and the remedying of any existing, impairment of visibility in mandatory Class I Federal areas which impairment results from manmade air pollution.” Achieve natural visibility conditions within Class I areas by 2064

Regional Haze Rule - Purpose Section – “... require states to develop programs to assure reasonable progress toward meeting the national goal of preventing any future, and remedying any existing, impairment of visibility in mandatory Class I Federal areas which impairment results from manmade air pollution …”

RH Program Requirements State must submit an implementation plan (SIP) Must establish goals (expressed in deciviews) that provide for reasonable progress towards achieving natural visibility conditions

Concept

Four Factors in Determining the Reasonable Progress Goal Cost of compliance Time necessary for compliance Energy and non-air quality environmental impacts of compliance Remaining useful life of any potentially affected sources

Three Components to Consider Evaluation of 2018 visibility considering current or “on the books” requirements for emissions reductions (e.g., CAIR, motor vehicle emissions standards, and many other already commanded reductions). VISTAS has completed this component. Regional Haze Rule directed BART requirements, section Not completed. Regional Haze Rule directed Reasonable Progress requirement, section Subject of this rulemaking.

IPM Projections Converts all oil-fired boilers to gas Affects sources throughout the state, but largely in South Florida. Primary power company (FPL) has indicated no intention of gas-only operation. Result, projected glidepaths (esp. Everglades) overly optimistic.

Plant NamePoint ID 2002 Actual SO2 Emissio ns (TPY) 2018 VISTAS Projected SO2 Emissions (TPY) FLORIDA POWER & LIGHT (PPE) PORT EVERGLA13, , , ,2050 FLORIDA POWER & LIGHT (PTF) TURKEY POINT14, ,6100 FLORIDA POWER & LIGHT (PMT) MANATEE POWE113, ,0730 FLORIDA POWER & LIGHT (PMR) FPL / MARTIN16, ,6030 FLORIDA POWER & LIGHT (PRV) RIVIERA POWE34, ,2910 PROGRESS ENERGY FLORIDA, INC. ANCLOTE PO113, ,2250 PROGRESS ENERGY FLORIDA, INC. BARTOW PLA16, , ,2490 NORTHSIDE37,1460 PROGRESS ENERGY FLORIDA, INC. FL POWER S

Applicability of Reasonable Progress Applies to all sources and all visibility- impairing pollutants. Purpose of this rule is to use the information derived from VISTAS to target the most relevant sources (i.e., pair-down the number of sources and pollutants needed to evaluate for reasonable progress).

Important Results from VISTAS Sulfate is the dominate component of regional haze in the Southeast. Implication – focus on SO2 reductions Nearly all of the SO2 emissions are from coal and oil-fired EGU’s, and industrial plants. Implication – focus on point source EGUs’ and industrial facilities.

Important Product Produced by VISTAS -- Area of Influence VISTAS developed information based on wind trajectories that indicate the likelihood that a source at a given location will impact each Class I area. A value (RTmax) is determined for each source location that is proportional to each sources probability that it would impact a particular Class I area on days of poor visibility.

Proposed Selection Criteria Selection based on modified Georgia criteria with RTmax*Q/d: VISTAS residence time data (within 5% for EGU’s and 10% non-EGU’s) 2002 actual emissions (units > 250 tpy) >= 0.5% unit contribution, considering only Florida units Selection based on each Class I area potentially affected by Florida sources (EVER,CHAS,SAMA,OKEF,WOLF,BRET)

Explanation of Terms RTmax -- This term is a metric for the frequency that air flows from the source to the Class I area on days of poor visibility. Q – Actual 2002 SO2 emissions in tons per year d – Distance (km), this term is a surrogate for dispersion.

Procedure For each unit with SO2 emissions >=250 tpy, identify all EGU’s with an RTmax >=5% and all non-EGU’s with an RTmax>=10% for each Class I area. For each of these units, calculate RTmax*Q/d for each Class I area. For each Class I area, sum RTmax*Q/d over all units and calculate the relative contribution for each unit. Select all units that contribute 0.5% or greater.

Proposed Selection (see handouts) 30 Facilities comprising 69 units 17 power plants 4 pulp and paper 9 other (chemical, phosphate,etc.)