BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

Alexandr Drozhdin March 16, 2005 MI-10 Injection.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Three-Phase AC machines Three-Phase Cage Rotor Induction Motor – Electronic Methods of Starting and Speed Control Resource 4.
ALPHA Storage Ring Indiana University Xiaoying Pang.
RF Cavity of CIS Xiaoying Pang Mar. 12 th, 2007 IUCF.
Status and new developments at ASTRID2 ESLS XXII, Grenoble 25-26/ Niels Hertel, ISA University of Aarhus, Denmark.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
FAIR MT/Cryogenics, Seong Yeub Shim Beam-Tube Eddy Loss S. Y. Shim.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
A NON LINEAR TRANSPORT LINE FOR THE OPTIMIZATION OF F18 PRODUCTION BY THE TOP LINAC INJECTOR C. Ronsivalle, L. Picardi, C. Cianfarani, G. Messina, G.L.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN Facility at TRIUMF L.Lee October 3, 2012 PLACE UCN LOGO & ACRONYM HERE.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BL1U at TRIUMF UCN Beamline Septum & Dipole Magnets (April 12, 2010)
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
2 nd harmonic RF perpendicular biased cavity update C.Y. Tan, W. Pellico, G. Romanov, R. Madrak, and D. Wildman 02 Apr 2014.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
Principals of fast injection and extraction R. Apsimon.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
July PRISM Workshop,ICL Extraction in PAMELA, T.Yokoi Extraction in PAMELA Takeichiro Yokoi (JAI, Oxford University, UK)
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Cathode Ray Oscilloscope (CRO)
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Linac4 Tech. Design Committee 10 th October 2006 Thomas Zickler AT/MEL/MI/tz 1 Magnets for Linac4 Th. Zickler CERN 6 th Linac4 Technical Design Committee.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop
April 17, Dejan TrbojevicFFAG07 -Non-Scaling FFAG gantries1 Non-Scaling FFAG Gantries Introduction: Motives: The most challenging problem in the carbon/proton.
PS2 WG Injection and extraction systems Basics and assumptions
MAGNETIZING ELECTRICAL-ELECTRONIC EQUIPMENT 800V, 1200A
ILC Power and Cooling VM Workshop
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
ELECTRONIC DEVICES AND CIRCUITS
J-PARC main ring lattice An overview
LINAC4 ADVISORY COMMITTEE
Status of the CLIC DR wiggler design and production at BINP
Introduction: FCC beam dumping system
Injection system design for high-energy circular collider FCC-hh
Injector Cyclotron for a Medical FFAG
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Main magnets for PERLE Test Facility
FCC Kicker Systems M.J. Barnes, T. Kramer CERN TE-ABT
Experimental Overview
FCC-hh injection group 7
Beam Injection and Extraction Scheme
Magnetized Bunched Electron Beam from DC High Voltage Photogun
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
R. Suleiman and M. Poelker September 29, 2016
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
Chapter 31 Faraday’s Law 31.1 Faraday’s Law of Induction
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
PSB magnetic cycle 900 ms MeV to 2 GeV
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Injection design of CEPC
Electron Collider Ring Magnets Preliminary Summary
Update on ERL Cooler Design Studies
Presentation transcript:

BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)

UCN Facility in Meson Hall 12 mr 145 mr 18.5  deflection: KICKER

Kicker Specs:  500 MeV protons (p = 1090 MeV/c)  15 mr maximum deflection (Bdl = Tm); normal deflection 12mr  effective length 1.5 m (physical available 2 m)  aperture 100 mm x 100 mm (under review)  field uniform to  5% over central 80 mm diameter region  flat top 1 ms, flat to  5% over the 1 ms  fires every 3 ms (330 Hz rep. rate, able to run continuously)  can be re-configured (in <1 hr) to run as low as 100 Hz (33 Hz) rep rate  power supply able to be located 10 m away Notes: The aperture is an important constraint. Reducing the vertical aperture reduces the current needed for a given deflection (or reduces the length of the magnet). Decreasing the horizontal aperture decreases the inductance, and hence the voltage needed for ramp-up and ramp-down. The rise time is also important. The high voltage needed for ramp up and down scales as 1/T rise The trade-off between the different parameters is shown in the next two slides.

7 mm 60 mm 100 mm  “Two Sigma” beam spot containing 90% of beam is 16 mm wide by 5.5 mm high  Beam moves ~8mm horizontally at exit of kicker when kicker fires  Beam would still be 8.8 sigma from wall  Smaller horizontal dimension reduces inductance and hence power supply voltage  Smaller vertical dimension reduces the magnet length or the power supply current  It’s important not to make the aperture larger than necessary Ceramic pipe How small can the aperture be?

Proposed time division of beam 50  s to 100  s 2/3 beam to  SR 1/3 beam to UCN normal TRIUMF beam, 4 min ms 2 ms 1 ms 1 min. 120  A

Example of Proton Beam Sharing  A 80  A 40  A 120  A 0  A 1 min.4 min. meson hall UCN source

Preliminary Coil Design for UCN Kicker Mike Barnes

UCN Kicker Mike Barnes Aluminum Ferrite Air

Kicker Power Supply

Ramp-Up: SW1 and SW2 are closed, magnet ramps up from the high voltage + -

Kicker Power Supply End of Ramp-Up: + - SW1 is opened. Current circulates through D3, D1, and SW2

Kicker Power Supply Flat Top: + - SW3 closes as required to maintain the flattop with the low voltage supply + -

Kicker Power Supply Ramp-Down: + - All switches open. Current is against the HV for fast ramp down. Stops at I=0 when diodes become back biased.

rise/fall time (  s) Turns (N) inductance (  H) flattop current peak voltage A4500 V A2900 V A2500 V A1300 V A1700 V A1900 V Examples: This table shows some examples of what could be done for a 100 mm x 100 mm aperture. As the rise/fall time gets longer the required peak voltage goes down (all else being equal). For a fixed rise/fall time, the current scales as 1/N and the peak voltage as N. By adjusting N, we can trade current against voltage. The most likely choices are highlighted (Numbers are rounded off)

Kicker Aperture - Reducing Kicker Aperture sizes (Vert. & Horiz.) reduces the supply current & voltage requirements  reduces P.S. costs - Limiting factor  beam halo Coil Lifecycle - Kicker repeatedly going ON/OFF  Mechanical stresses? - Limit to the total number of cycles the coils can go thru? - Spares recommended (M.Barnes recommends incl. spare coils) - Extend the lifecycle by changing Kicker rep-rate & flat-top? Kicker Failure Modes - Need to quantify the nature & frequency of kicker failure modes Issues: