1 Managing Travel For Planned Special Events: The VA Department of Transportation’s Traffic Signal System Approach National Transportation Operations Coalition.

Slides:



Advertisements
Similar presentations
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Advertisements

Strategic National Stockpile (SNS): What it means to you! Jacquelyn Roberson, RN, BSN Maine CDC Michael Radke, RRT, A.S., B.S. Portland Public Health.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
TASK FORCE CALL TO ARMS Henninger High School 2012.
.nowNAZTEC 1. Overview AGENDA Benefits Algorithm Simulation 2 Case Studies Real-time adaptive traffic control system Adjusts signal timing based on current.
How Do Traffic Control Measures Affect Vehicle Gas Emissions Presented by: Ryan O’Connell Co-Authors: Kevin Lu Dr. Wen Cheng Dr. Xudong Jia.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
3/3/06Michael Dixon1 CE 578 Highway Traffic Operations Freeways Merge Influence Areas.
11 Quantifying Benefits of Traffic Information Provision under Stochastic Demand and Capacity Conditions: A Multi-day Traffic Equilibrium Approach Mingxin.
Customized Simulation Modeling Using PARAMICS Application Programming Interface Henry Liu, Lianyu Chu & Will Recker.
CE 578 Highway Traffic Operations Introduction to Freeway Facilities Analysis.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Rashad M. Hanbali, Ph.D., P.E. 942 Nottingham Drive Cookeville Tennessee Tel.: Work (931) 372 – 3546 Home (931) 528 – 1904 Fax: Work (931) 372 –
ACT 96 - Indoor Environmental Quality In conjunction with the requirements directed under WI Statute and Administrative Code, school building officials.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Intervention and Referral Services Linda Remolino, LPC, NCC Director of School Counseling North Plainfield School District.
Applied Transportation Analysis ITS Application SCATS.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
1 Secondary link importance: Links as rerouting alternatives during road network disruptions Erik Jenelius Centre for Transport Studies / Royal Institute.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
Putting HR on Balanced Scorecard
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Simulation-Based Impact Analysis of Signalized Intersections Kelli Lee, Todd Bonds Grant County Middle School, KY; Northern Kentucky University, KY Learning.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Case Study 1 Styner/Lauder Intersection Moscow, Idaho.
University of Idaho Successful External Program Review Archie George, Director Institutional Research and Assessment Jane Baillargeon, Assistant Director.
The Fully Networked Car Geneva, 4-5 March Ubiquitous connectivity to improve urban mobility Hermann Meyer ERTICO.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
Company LOGO Traffic Impact Study Case: Al-Irsal Center Project in Al-Bireh City Under the Supervision of: Pro.Sameer A. Abu-Eisheh Prepared by: Mohammad.
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA. CVE 505 HIGHWAY & TRANSPORTATION ENGINEERING I.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
New Uses for Archived Data Cathy McGhee, PE Senior Research Scientist Brian L. Smith, Ph.D. Associate Professor ITS America Annual Meeting May 2, 2005.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
County of Fairfax, Virginia Department of Transportation Potential Fairfax County Photo Red Light Program Board Transportation Committee December 10, 2013.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Introduction Study area Existing problem Objective Methodology Results and Conclusions Recommendations.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
Mediated Modelling Integrating the four aspects of well-being in Auckland to support Spatial Planning.
The Importance of Public Participation and Outreach in Project Development Gary Flunoy – Business Outreach/Public Involvement Coordinator August 27, 2009.
2007 TRAFFIC SIGNAL SELF- ASSESSMENT Webcast December 13 th, 2006 Woody Hood Maryland State Highway Administration.
MECHATRONICS Group # Group Members’ Names MENG 483 Project Title of the Project Spring 20XX.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
Simulation Based Impact Analysis of Signalized Intersections Project # 5: Classroom Implementation Kelli Lee Todd Bonds S.S./Science.
Project Overview – Phase 1
By Pema Thinley Trade Officer Department of Trade
Author: Ragalatha P, Manoj Challa, Sundeep Kumar. K
Transportation Research Board 2004 Annual Meeting
Traffic Committee Meeting August 17, 2017
Introduction to Projects
Sam Houston State University
Toledo-Lucas County PODS Mass Dispensing Exercise
Sam Houston State University
CJA/475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopcourse.com
CJA/475 CJA/ 475 cja/475 cja/ 475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopstudy.com
Presentation transcript:

1 Managing Travel For Planned Special Events: The VA Department of Transportation’s Traffic Signal System Approach National Transportation Operations Coalition (NTOC) Webcast on Planned Special Events Ling Li, P.E. Katherine D. Jefferson January 27, 2005

2 Presentation Outline Introduction Program Planning Event Operations Planning Implementation Activities Day-of-Event Activities Post-Event Activities Conclusion

3

4

5

6

7 Program Planning Byproduct of traffic signal optimization. Initiated by VDOT staff and in response to external requests for assistance. Evaluation of existing signal timings. Stakeholder meetings.

8 Event Operations Planning Four Activities: –Data Collection –Data Analysis –Timing Plan Development –Simulation and Fine-tuning

9 Data Collection Of the three types of data collected – traffic counts, existing timing plans, roadway conditions/geometric data – only traffic counts are collected for special events.

10 Data Analysis Tabulating traffic counts and summarizing in spreadsheets. Comparing traffic count data with central system traffic volumes at adjacent intersections (balancing). Creating an area map. Using flow diagrams from the central system to determine the number of plans to be developed.

11 Timing Plan Development/Optimization Level of Service (LOS) and delay calculated for each affected intersection. Coordination maintained. Synchro used for optimization. Adjustments made using Time-Space Diagrams (iterative process).

12 Simulation and Fine-tuning/Validation SimTraffic used for simulation. Simulations used to compare optimized timing plans (from Synchro) with observed traffic conditions and known motorist tendencies.

13 Day-of-Event Activities On-site and control room monitoring. Timing plan adjustments in accordance with real-time traffic conditions. Internal (facility) traffic control challenges.

14

15 Post-Event Activities Debriefing Sessions –Evaluate timing plan effectiveness. –Identify intersection modifications, transportation and operational improvements. –Create feedback loop for timing plan development for future events.

16

17

18

19 Conclusion Inter-jurisdictional Coordination (IJC): –Has become routine and extends beyond planned special events to emergency response plan development and continual data sharing. Staff participation on MWCOG ITS Task Force Signal Committee. Regular bi-monthly meetings of signal system managers and engineers.

20 Conclusion (cont.) Challenges: –Institutional impediments, –Manpower constraints/staffing loss, –Technological difficulties, –Continual growth of regional economy.

21 Conclusion (cont.) Role of ITS technologies: –Enables continual signal timing plan development. –Enables development of recommendations for additions and/or improvements to other traffic control devices. –Enables provision of traveler information to influence route choice.