1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;

Slides:



Advertisements
Similar presentations
US CMS H1/H2 Issues1 H C A L Dan is interested in the calibration of the HCAL for jets. He defines “R” as the measured energy of a pion, probably in ADC.
Advertisements

1 Calice ECAL Meeting UCL 8/06/09David Ward Thoughts on transverse energy profile for e/m showers David Ward  We have work from G.Mavromanolakis on this.
1 Calice Analysis 02/03/09 David Ward ECAL alignment update David Ward  A few thoughts about ECAL alignment  And related issue of the drift velocity.
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
April 19th, 2010Philippe Doublet (LAL) Hadronic showers in the SiW ECAL (with 2008 FNAL data) Philippe Doublet.
LAr Response to pions: Data vs MC (work in progress) S.Paganis (Wisconsin) withIsabelle,Martin LAr+Tile H8 pion CTB Meeting, CERN, 19-April-2005.
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
Page 1 Calculating the Beam Position at the Ecal for DESY Run (Independent of Tracking) Hakan Yilmaz.
Calice UK Meeting / 10/11/2004 D.R. Ward1 David Ward University of Cambridge Simulation Reconstruction Preparations for test beam UK software work.
Calice Meeting / DESY/January 2004D.R. Ward1 David Ward University of Cambridge Test beam requirements? Studies of cuts and models Fluka studies Clustering.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Longitudinal shower profile of the DESY and CERN testbeam data in the electromagnetic calorimeter Valeria Bartsch (UCL) & Nigel Watson (Birmingham)
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
Anne-Marie Magnan Imperial College London Kobe, May 11th, 2007 Calice meeting --- Anne-Marie Magnan 1 Status of MC reconstruction MC Reconstruction Chain.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
More on Testbeam Analysis FLZ. Stability Checks for TCMT Pedestal stability already shown by Kurt MIP calibration stability Response stability.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
Certifying Geant4-based calorimeter simulations for the LCD Dhiman Chakraborty, Guilherme Lima, Jeremy McCormick, Vishnu Zutshi NICADD, NIU ALCWG-Cal Meeting.
1 Calice UK s/w meeting RHUL 24/1/06D.R. Ward David Ward Have previously reported on comparison of Feb’05 DESY data with Geant4 Monte Carlos. Issues with.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
7/6/2011ECAL Studies1/7 ECAL Studies Jacopo Nardulli.
Preliminary comparison of ATLAS Combined test-beam data with G4: pions in calorimetric system Andrea Dotti, Per Johansson Physics Validation of LHC Simulation.
Mark Thomson Timing, Tungsten and High Energy Jets.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
LAr Response to pions: Data vs MC S.Paganis (Wisconsin) with Isabelle Winterger,Martin Aleksa LAr Week CTB Meeting, CERN, 10-May-2005.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
Marco Delmastro 23/02/2006 Status of LAr EM performance andmeasurements fro CTB1 Status of LAr EM performance and measurements for CTB Overview Data -
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
© Imperial College LondonPage 1 Tracking & Ecal Positional/Angular Resolution Hakan Yilmaz.
Interactions of hadrons in the SiW ECAL Towards paper Naomi van der Kolk.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
1 D.Chakraborty – VLCW'06 – 2006/07/21 PFA reconstruction with directed tree clustering Dhiman Chakraborty for the NICADD/NIU software group Vancouver.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
1 IWLC 2010 Geneva Oct.’10David Ward Tests of GEANT4 using the CALICE calorimeters David Ward  Electromagnetic particles (, e) were used to understand.
AHCAL analyses overview List of ongoing analyses targeted to the upcoming publications Erika Garutti.
LAr Reconstruction: Data vs MC (parabola) S.Paganis (Wisconsin) WithManuel,Isabelle,Martin,Karina,Walter,… LAr H8 Meeting, CERN, 5-April-2005.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Interactions of pions in the Si-W ECAL prototype Towards a paper Naomi van der Kolk.
ECAL Alignment with e and π data D. BOUMEDIENE LPC Clermont-Ferrand CALICE meeting – Argonne 19/03/2008.
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
1 Calice Analysis 21/7/08David Ward Quick look at 2008 e - data; low energy hits in 2006  2008 e - data from Fermilab; July’08  Looked at several runs.
A Study on Leakage and Energy Resolution
1 MC Production and Reconstruction Summary and Plans Valeria Bartsch, Fabrizio Salvatore, A.-M. Magnan, and Nigel Watson.
Michele Faucci Giannelli
CALICE scintillator HCAL
Tracking System at CERN 06 and 07 test beams
Interactions of hadrons in the Si-W ECAL
First look at data/MC comparison for period 8 reference runs
Rick Salcido Northern Illinois University For CALICE Collaboration
longitudinal shower profile
Michele Faucci Giannelli
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status; preparation for LCWS

2 Calice UK Meeting 27/03/07David Ward Timescales LCWS starts 30 May Includes calorimetry review. Calice general meeting Kobe May Aim to produce two compendium Calice notes, on ECAL and HCAL analyses as basis for results shown at LCWS. New guidelines approved by Steering Board – in the case of test beam data, only results described (“blessed”) in approved Calice notes may be shown publicly. Anticipate needing » 2 weeks for editorial procedure/checking/circulation to Collaboration. Practice talks required, or else circulation of slides. Implies notes must to be essentially written before Kobe, and therefore analyses for input to these notes need to be completed by the end of April. i.e. » 5 weeks from now.

3 Calice UK Meeting 27/03/07David Ward Data and MC Reconstructed data Test samples of reconstruction v04-03-pre2 1/2/07. Included HCAL; new coordinate system. Revealed several problems. New version v04-03-pre3 15/3/07. Fix some bugs. New calibrations. More test samples ECAL normal incidence data seem usable. Problems with ECAL geometry for inclined angles. Still significant problems with HCAL Still awaiting fixes to this reconstruction – full processing of all data. Monte Carlo Mokka_6.3 released 27/2/07 (including new coordinate system) Bug in geometry quickly identified and fixed – need Mokka_6.3.p01 released 2/3/07. Seems basically OK. Nige Watson et al producing test samples on the Grid for general use. I also have private 10k samples – shown here.

4 Calice UK Meeting 27/03/07David Ward New calibrations – 45 GeV e - Most obvious feature is that the hit energies have increased by » 5.4%. Varies from layer to layer. Number of hits increases by <1%.

5 Calice UK Meeting 27/03/07David Ward and at 30 GeV …  Increase of » 5% seems to be basically the same at all energies (including DESY data)  Therefore, in comparing with Mokka, I changed MIP value in MC from MeV to MeV for subsequent plots.

6 Calice UK Meeting 27/03/07David Ward Data/MC e - 30 GeV 0 o Noise? Crosstalk? Pedestal shift? MC digi neeeded? Shoulder – inter-wafer gaps Tail very good. !!

7 Calice UK Meeting 27/03/07David Ward Data/MC e - 45 GeV 0 o Worse?

8 Calice UK Meeting 27/03/07David Ward Data/MC e - 10 GeV 0 o n.b. runs have a lot of pion contamination – use Cerenkov to cut this.

9 Calice UK Meeting 27/03/07David Ward Data/MC hits by layer 45 GeV

10 Calice UK Meeting 27/03/07David Ward Data/MC hits by layer 10 GeV A bit better?

11 Calice UK Meeting 27/03/07David Ward Data/MC hits by layer 3 GeV DESY Much better

12 Calice UK Meeting 27/03/07David Ward Data/MC  12 GeV ECAL MIP peak good; tail less good. LCPhys physics list. Not too bad?

13 Calice UK Meeting 27/03/07David Ward Data/MC  12 GeV HCAL Missing layers Displacement !

14 Calice UK Meeting 27/03/07David Ward Energy scale/resolution - DESY  Cut in wafer centre (20x20mm region) to remove gaps  Calibration 250MIP = 1 GeV  Fit Gaussian in range [-1 ,+2  ]  No correction for missing layers. 1.5 GeV 3 GeV 6 GeV

15 Calice UK Meeting 27/03/07David Ward Energy scale/resolution - CERN 10 GeV 30 GeV 20 GeV 45 GeV

16 Calice UK Meeting 27/03/07David Ward The gap problem – 45 GeV

17 Calice UK Meeting 27/03/07David Ward The gap problem – 10 GeV

18 Calice UK Meeting 27/03/07David Ward Gaps. Global correction?  Method suggested by Clermont group.  Fractional energy lost in gap vs y barycentre  Parametrise with (universal) Gaussian and correct.  Likewise vs x.  Problem – distribution not well simulated by MC.

19 Calice UK Meeting 27/03/07David Ward After global correction 45 GeV

20 Calice UK Meeting 27/03/07David Ward After global correction 10 GeV

21 Calice UK Meeting 27/03/07David Ward Linearity

22 Calice UK Meeting 27/03/07David Ward Linearity

23 Calice UK Meeting 27/03/07David Ward Resolution

24 Calice UK Meeting 27/03/07David Ward Summary Time getting very tight to have results for LCWS. Reconstructed files still have problems, but are usable for many purposes, for the ECAL. HCAL reconstruction progressing, but still not usable by non-experts. Change of coordinate system still not sorted out properly. Mokka seems in reasonable shape, even before digitization. Far too few people looking at data.