Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

Regional Planning Group Project
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
April 15, TAC Report to the ERCOT Board April 15, 2003.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Avoided Costs of Generation
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
ERCOT RMR Basics Ino González Supervisor, S&B Market Analysis.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
ERCOT RMR Contract Status Report Presented To The ERCOT Board Of Directors December 17, 2002 Sam Jones, COO.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 2, 2006.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
RMR Exit Strategies Update TAC November 6, RMR UNITS.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
1 PG&E’s Humboldt Bay (HBPP) & Diablo Canyon (DCPP) Power Plants Decommissioning process and replacement power April 14, 2011 Loren Sharp.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
TAC Rejection of NPRR Mitigated Offer Caps for RMR Units
TAC Report to the ERCOT Board
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
RMR Update November 6, /05/2002.
NPRR 816 / Vendor Index Definitions
September Protocol Transition Plan
Presentation transcript:

Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002

Discussion Purpose Recent RMR contracts have raised questions –Amount of MW under RMR –Total cost of RMR contracts (~$350 MM annualized cost) –RMR costs are uplifted to all loads TAC should review RMR Protocols –Determine if current contracts are within the Protocols –Determine if RMR contracts fit the intent of RMR –Determine if Protocol Revisions are needed –Determine what TAC’s role is in reviewing RMR plans and contracts in the future

Issues Raised For TAC Review From Initial RMR Contracts Data inputs to Standby Price The heat rate benefit of a combined cycle plant that includes an RMR gas turbine Analysis comparing RMR payments to transmission upgrades to resolve the local constraint Estimated contract value, including energy deployments RMR energy management and pricing How are RMR units handled in the Day-Ahead balanced schedule process? Minimum take provisions ERCOT’s plan for 2003 –If report not done until 12/15/02 and existing RMR contracts expire 12/31/02, when will ERCOT negotiate new contracts? –What is TAC’s role in evaluating ERCOT’s plan?