Physics Validation. Validations 18/12/13: DC14 (1) 5 validation tasks for this week: Several DC14 simulation tests, grouped into 3 tasks 2 tasks on IBL/ITK.

Slides:



Advertisements
Similar presentations
Impact parameter studies with early data from ATLAS
Advertisements

UK egamma meeting, Sept 22, 2005M. Wielers, RAL1 Status of Electron Triggers Rates/eff for different triggers Check on physics channels Crack region, comparison.
SiD PFA Status and Calorimeter Performance Ron Cassell (SLAC) SiD Design Study Meeting 11/15/08.
Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
Effect of b-tagging Scale Factors on M bb invariant mass distribution Ricardo Gonçalo.
Alain Romeyer - January Light higgs decay in SUSY cascade - Status report Introduction Trigger efficiency B tagging Jet calibration Invariant mass.
Trigger validation Ricardo Goncalo, RHUL Physics Validation - 14 September 2007.
14 Sept 2004 D.Dedovich Tau041 Measurement of Tau hadronic branching ratios in DELPHI experiment at LEP Dima Dedovich (Dubna) DELPHI Collaboration E.Phys.J.
HSG5: work towards Moriond H->bb paper for Moriond: – WH->lνbb and ZH->llbb: – Analysis seems ready. See status here:
Validation of DC3 fully simulated W→eν samples (NLO, reconstructed in ) Laura Gilbert 01/08/06.
HiT – Higgs and Top (Thursday, June 22, 2000) 1.News - Boaz/Meenakshi 2.Trigger Simulator Status – who?? 3.Proposal for a HiT workshop – Meenakshi/Boaz.
Top Turns Ten March 2 nd, Measurement of the Top Quark Mass The Low Bias Template Method using Lepton + jets events Kevin Black, Meenakshi Narain.
Kevin Black Meenakshi Narain Boston University
1 First look at new MC files First look at reconstruction output from the newly- generated “mock-data” MC files. –These contain the following improvements:
Update on Tools FTK Meeting 06/06/06 Erik Brubaker U of Chicago.
Single Top Trigger Studies Top Trigger Meeting, 6 June Patrick Ryan, MSU Single Top Trigger Studies Top Trigger Meeting 4 June 2007 Patrick Ryan.
José E. García b -tagging performance with xKalman and iPatRec With the help of: S. Correard, I. Gavrilenko, S. González, A. Poppleton, E. Ros, A. Rozanov,
VH (H->bb) Cut Flow Status. Introduction Hoping to start the mini-ntuple etc production now Some push over last few days but still not as much as would.
C.ClémentTile commissioning meeting – From susy group talk of last Wednesday  Simulation and digitization is done in version (8) 
Minutes of the Strasbourg-Brussels meeting July, the 10 th 2014.
Optimising Cuts for HLT George Talbot Supervisor: Stewart Martin-Haugh.
19/07/20061 Nectarios Ch. Benekos 1, Rosy Nicolaidou 2, Stathes Paganis 3, Kirill Prokofiev 3 for the collaboration among: 1 Max-Planck-Institut für Physik,
Preparation for the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs sub-group conveners meeting – 9 Jan.09.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Some Thoughts about Hits, Geometry etc Rob Kutschke, Hans Wenzel Fermilab March 13, 2007.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
QCD and Top backgrounds in W+jets and Rjets Alessandro Tricoli (CERN) on behalf of W+jets and Rjets groups 3 rd May 2013 W+jets and Rjets EB Meeting.
News from Jet/Etmiss Monica. Jet/Etmiss meeting yesterday (25/5) at P&P week – Mostly review of conf notes for ICHEP10 – Good review to check where we.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
Post-DC2/Rome Production Kaushik De, Mark Sosebee University of Texas at Arlington U.S. Grid Phone Meeting July 13, 2005.
Trigger validation for Many thanks to Long Zhao, Chihiro Omachi, Julie Kirk, Giovanni Siragusa, Patricia Conde Muiño, Andreas Reinsch, Olya Igonkina,
N. Saoulidou, Fermilab, MINOS Collaboration Meeting N. Saoulidou, Fermilab, ND/CC Parallel Session, MINOS Collaboration Meeting R1.18.
Update on Diffractive Dijet Production Search Hardeep Bansil University of Birmingham Birmingham ATLAS Weekly Meeting 13/09/2012.
05/04/06Predrag Krstonosic - Cambridge True particle flow and performance of recent particle flow algorithms.
21 Sep 2009Paul Dauncey1 Status of Imperial tasks Paul Dauncey.
1 Single top in e+jets channel Outline : - Data and MC samples - Overview of the analysis - Loose and topological cuts - MC efficiencies and expected number.
W/Z Plan For Winter Conferences Tom Diehl Saclay 12/2001.
Marcel Vreeswijk (NIKHEF) B tagging, performance vertexing Neural Net studies tt event selection mass reconstruction in tt events conclusions B tagging.
Trigger Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) on behalf of trigger community Physics Validation Meeting – Feb. 13, 2007.
Update on Diffractive Dijets Analysis Hardeep Bansil Birmingham ATLAS Weekly Meeting 10/04/2014.
Benchmarking Tracking & Vertexing Andrei Nomerotski (Oxford) SiD Tracking Meeting, 7 December 2007.
Jet Tagging Studies at TeV LC Tomáš Laštovička, University of Oxford Linear Collider Physics/Detector Meeting 14/9/2009 CERN.
E. Soldatov Tight photon efficiency study using radiative Z decays (update) E.Yu.Soldatov 1, 1 National Research Nuclear University “MEPhI” Outline:
Fast Simulation and the Higgs: Parameterisations of photon reconstruction efficiency in H  events Fast Simulation and the Higgs: Parameterisations of.
Diphoton + MET Analysis Update Bruce Schumm UC Santa Cruz / SCIPP 03 July 2013 Editorial Board Meeting.
Issues with cluster calibration + selection cuts for TrigEgamma note Hardeep Bansil University of Birmingham Birmingham ATLAS Weekly Meeting 12/08/2010.
1 NCC Task Force Richard Seto NCC Task Force Meeting Jan 8, 2007 BNL.
4 May 2006 First look to the Ke2 decay ● Interesting for the Ke2/k m 2 ratio ● BR(K ±  e n ) = (1.55 ±0.07)10 -5 ● Large radiative decay BR(K ±  e n.
22 January 2009 David1 Look at dead material and fake MET in Jx samples mc08 10 TeV simulations, release J0 to J6 are tag s479_r586, ‘ideal geometry’
Using Track based missing Et tools to reject fake MET background Muhammad Firdaus Mohd Soberi UMichigan-CERN Semester Program Thursday, 12 th February.
Electron Calibration and Performance ( ) N. Benekos (MPI), R. Nikolaidou (Saclay), S. Paganis (Sheffield) Contributions from: A. Farbin (CERN) +
28/01/101 Zvv bkg, how to get an estimate with first data ? R. Brunelière Time schedule is tight. Goal : get an estimate by may/june if we get data from.
DN/d  and dN/dp T analysis status Gabor Veres for the working group QCD meeting, Jan 12, 2010.
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
LHCb Trigger Meeting – Februaryr 9, 2004, CERNMassimiliano Ferro-Luzzi 1 Tagging and Offline selection versus multiplicities What are the “best” multiplicity.
Alain Romeyer - Sept Light Higgs search in SUSY cascades Introduction (Previous studies) Plans for this analysis Simulation chain Reconstruction.
10 January 2008Neil Collins - University of Birmingham 1 Tau Trigger Performance Neil Collins ATLAS UK Physics Meeting Thursday 10 th January 2008.
Discussion on Combined (ID+LAr) Material Studies action plan  Latest LAr linearity plot from period 5  Discussion on test MC run production.
1 Status of Tracker Alignment b-tagging Workshop Nhan Tran (JHU) On behalf of the Tracker Alignment Group.
I'm concerned that the OS requirement for the signal is inefficient as the charge of the TeV scale leptons can be easily mis-assigned. As a result we do.
H->WW->lνlν Analysis - Improvements and results - - Data and MC - Higgs Working group meeting, 6 January 2011 Magda Chełstowska & Rosemarie Aben.
David Lange Lawrence Livermore National Laboratory
E. Soldatov Tight photon efficiency study using FSR photons from Z  ll  decays E.Yu.Soldatov 1, 1 National Research Nuclear University “MEPhI”
Status of the Higgs to tau tau analysis Carlos Solans Cristobal Cuenca.
Pixel Phase 1 Upgrade Simulation: Technical Status and Plans (Fermilab) (For the Tracker Upgrade Simulations Group) Pixel Phase 1 Upgrade Simulation: Technical.
SM Direct Photons meeting
ILD Optimisation: towards 2012 University of Cambridge
The others’ latest result about SUSY search with same-sign dimuon
A brief Update on secondary vertex tagged jets
Presentation transcript:

Physics Validation

Validations 18/12/13: DC14 (1) 5 validation tasks for this week: Several DC14 simulation tests, grouped into 3 tasks 2 tasks on IBL/ITK digi+reco bugfix (ttbar only) (1) Test of simulation in , which will be used for DC14. Without pileup and no changes expected. Test: s1860_s1862_r5143 ( , ) - GEO , FS off Ref: s1859_s1862_r5143 ( , ) - GEO , FS off ATLPHYSVAL-39 (2) Check impact of frozen showers in (w/o pileup) Ref is test from task 1. Similar changes expected to last FS validation Test: s1861_s1862_r5143 ( , ) - GEO , FS on Ref: s1860_s1862_r5143 ( , ) - GEO , FS off ATLPHYSVAL-39 19/12/2013Simulation Steering Group Meeting2

Validations 18/12/13: DC14 (2) (3) Several technical simulation changes for /.2 AthenaMP-II, New GEO tag naming, SLC6 release. Reference is the test from task 1. No changes expected in all cases. Test 1: (AthenaMP): s1860_s1862_r5143 ( , ) - GEO , FS off, no pileup Test 2: (SLC6): s1866_s1862_r5143 ( , ) - GEO , FS off, no pileup Test 3: (GEO naming): s1865_s18XX_r51XX ( , ) - GEO , FS off, no pileup Ref: s1860_s1862_r5143 ( , ) - GEO , FS off ATLPHYSVAL-39 Geo naming task not run in time due to crash in HITS merging Fixed in (thanks for quick turn around) Running merging and digi+reco for ttbar scout Hoping to be able to have TAG-level comparison by Friday Since this is only a technical change this would probably be sufficient 19/12/2013Simulation Steering Group Meeting3

Validations 18/12/13: IBL/ITK 4) Check of vertex bugfix for ITK digi+reco in Truth info accidentally used re-ordering the vertex container which may have caused a small bias in some samples, resulting in the primary vertex ID being more efficient than would be expected using usual sum(pT^2) criteria. Only small changes in vertex efficiency expected Test: s1636_r5087 ( ,AtlasProductuion) - No pileup, ttbar only Reference: s1636_r4528 ( ,AtlasProductuion) - No pileup ATLPHYSVAL-52 (5) Check of vertex bugfix for IBL digi+reco in Same issue as task 4. Again small changes in vertex efficiency expected. Test: s1638_r5119 ( ,IBLProd) - No pileup, ttbar sample only Reference: s1638_r4514 ( ,IBLProd) - No pileup ATLPHYSVAL-52 19/12/2013Simulation Steering Group Meeting4

Validations 29/11/13 (2) (3) Validation of GEO-21 with MC11 configuration with pileup Follow up on previous validation of MC11 with GEO-21 without pileup a Test : s1786_r4980 ( , with GEO-21) Reference: s1372_r3043 ( , with GEO-18) ATLPHYSVAL-41 (4) Validation of digi+reco in for mc12 prod (GEO-20) Two tests: r5079 with the nominal configuration but digi+reco in the latest release r5080 which includes technical changes to DB access via frontier in digi+reco (including trigger DB). Test1 : s1469_r5079 ( , ) Test2 : s1469_r5080 ( , ) Reference: s1469_r4764 ( , ) ATLPHYSVAL-50 19/12/2013Simulation Steering Group Meeting5

Overview Have most results: Electrons, photons, MET, muons (except 1/4), tracking (except 4), secondary tracking, jets (except 4/5), tau (except 2/3), b-tagging, top (except 4), Higgs (except 4) Physics/CP groups really pushed hard to get this validated Still waiting for a few results: Jets(4/5), muons (1/4), tracking (4), tau (2/3), SUSY, top (4), Higgs (4), exotics Ones in bold relavent for DC14 Things looking very good from what we can see so far for all DC14 tasks and IBL/ITK digi+reco: 19/12/2013Simulation Steering Group Meeting6

Simulation In general looks good b-tag yellow but diffs similar to usual Largest diff seen is increase in muon efficiencies at high p T Similar for all muon types Some small diffs in tracking for ganged pixels, holes, outliers (true for all tasks) 19/12/2013Simulation Steering Group Meeting7

Simulation: AthenaMP/SLC6 Some small differences seen but pretty much all within stat uncertainties An example of a largest one seen for SLC6: pixel holes 19/12/2013Simulation Steering Group Meeting8

Frozen Showers in (1) Some diffs in E response (linearity/uniformity) for forward elecs Uniformity (right) similar to seen in validation (bottom) Larger difference for linearity seen by egamma (left) but not for SM (later) Shape clearly different to previous results too 19/12/2013Simulation Steering Group Meeting9 Test (FS on) Ref (FS off)

Frozen Showers in (1b) Differences noticeably larger than MC12 new FS library validation 19/12/2013Simulation Steering Group Meeting10

Frozen Showers in (2) SM Z->ee also see difference in linearity for fwd elecs But here similar to validation (bottom) Note: colors switched wrt egamma; RHS plot definition inverted wrt previous 19/12/2013Simulation Steering Group Meeting11 Test (FS on) Ref (FS off)

Frozen Showers in (2b) Again significantly larger differences in linearity than in MC12 19/12/2013Simulation Steering Group Meeting12

Frozen Showers in (3) SM Z->ee further see difference in resolution for fwd elecs Again similar to previous validation (bottom) 19/12/2013Simulation Steering Group Meeting13 Test (FS on) Ref (FS off)

Frozen Showers in (3b) Resolution changes similar to those seen in MC12 19/12/2013Simulation Steering Group Meeting14

Frozen Showers in (4) Egamma/Z -> ee linearity differences are clearly larger than those seen in MC12 Photon results marked green but haven’t seen plots to check in depth the level of differences Given the above would suggest to not use FS for DC14 at this point 19/12/2013Simulation Steering Group Meeting15

New Geometry Naming Include TAG comparison if get in time 19/12/2013Simulation Steering Group Meeting16

IBL/ITK digi+reco Several groups struggling to run on task 4 (ITK) Likely due to changes to job options needed for IBL For IBL task (5), things look good so far Including vertex-dependent tracking variables Don’t yet have a vertex distribution itself Unfortunately unable to run b-tagging for these samples Mistakenly included "JetTagNtuple/preInclude_Reco_trf_IBL.py” which was found previously to disable some required containers. 19/12/201317

Upcoming validations + Plans for next meeting 19/12/2013Simulation Steering Group Meeting18

Upcoming Validations (1) Validation of AFII for DC14 in / Reminder: no validated AFII with pileup so proposed plan is: AFII vs latest validated AFII in without pileup AFII vs validated G4 in without pileup to check expected AFII diffs AFII with pileup vs G4 with pileup ATLPHYSVAL-37 Sample A done for Probably want to rerun with ? Can run these samples over holiday Continue run-dependent conditions tag validation for simulation Disentangle effect of beamspot change & other conditions changes by: MC12b simul and digi+reco conditions tag with override of BS to new tag Run-dep simul & digi+reco conditions tag with override of BS to MC12b tag Sample A reco running MC11, MC10 after MC12 validated MC10 with full sample A (changes in MET); others only tracking validation (BS) ATLPHYSVAL-34 18/12/201319

Upcoming Validations (2) Validation of new TRT digi+reco code in Y In parallel with run-dep conditions tests as requires new conditions tag ATLPHYSVAL-34 Waiting for cache Check new GEO naming for simul ( ) & digi+reco ( ) Depends on if get results of TAG-level validation before holidays. ATLPHYSVAL-43 Check digi+reco in Plan to properly validate by comparing to last validated digi+reco Already needed to use for simul validation (new GEO + 64 bit ID) Sample A done with GEO-20 to compare to validated Do we want to redo? GEO-21? Pileup? New Reco_tf.py (being validated in separate tasks – see next slide) ATLPHYSVAL-45 18/12/201320

Upcoming Validations (3) Validation of new Reco_tf.py and Digi_tf.py in Two tests: digi and reco in two separate steps or one combined step ATLPHYSVAL-56 Sample A reco running Validate updated IBL GEO + code (2 steps) for run 2 DC14 ATLASPHYSVAL-33ATLASPHYSVAL-33: simul & digi+reco in ATLASPHYSVAL-15ATLASPHYSVAL-15: simul in & digi+reco in Y Still two steps? Waiting for digi+reco cache Validation of overlay in Will have two references: previous overlay + standard MC12 simul Since overlay samples only use HCP data a pile up reweighting is needed HCP GRL must also be applied to the overlay ones (since comes from data) Sample A done ATLASPHYSVAL-49 18/12/201321

Upcoming Validations (4) Validation of ITK in Needed to allow non-Gaussian beamspot. Slightly longer term ATLPHYSVAL-53 19/12/2013Simulation Steering Group Meeting22

First Meeting Plans What are priorities for first post-Christmas meeting? Monday 13 th Jan (brought forward to gain some time) Possible tasks (samples available or can be run over holiday): AFII simulation New digi and reco transforms digi+reco Run-dependent conditions in MC12b New GEO naming (depending on TAG-validation) Overlay Maybe slightly too many for one meeting Might squeeze in if don’t need to do GEO-naming Should really get overlay done If we need to postpone something, which one? 19/12/2013Simulation Steering Group Meeting23