October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Muon Campus AIP Review MC-1 Building GPP Update Russ Alber FESS Engineering January 23, 2013.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
October 23, 2002PMI Chicagoland Chapter, Inc.1 Project Management Integration Scope Time Cost Quality Human Resource Risk Procurement Communication.
SLAC Infrastructure and Power Issues Gregory A. Loew DOE High Energy Physics Program Review June 2-4, 2004.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Transformer Construction
Utilities Drawing Project U N I V E R S I T Y OF K E N T U C K Y.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
Keeping them Straight October 11,  Piping components come in two categories  Building Piping Components  Underground Piping Components.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
UVM UTILITY SYSTEM MASTER PLANNING IDEA CONFERENCE International District Energy Association Sal Chiarelli, Director of Physical Plant, UVM February 2006.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Preliminary Studies of the Electric Power Distribution for CLIC
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
High Efficiency Clothes Washers n Reduce energy costs by 50% per year n Reduce water and sewer costs by 35-50% per year n Use 50% less laundry detergent.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Electrical & High Temperature Utility Distribution Upgrade.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
October, 2009 Cryogenics System Roberto Than October, 2009 Internal Review.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alex Zaltsman Power Amplifiers and LLRF.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS The generation system has a design capacity of 7.24 MW, to operate during peak hours and during.
Electrical Engineering
Transmission Substation 2004 Storm Season. Transmission & Substation 2 HURRICANE CHARLEY August 13, 2004 Transmission Sections Locked Out ………………………… 44.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
CFS-ADI Joint Meeting University of Tokyo April 8-10, 2014 Session 8 - Power Usage and Site Requirements V Kuchler, A Enomoto.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
HVAC Replacement Case Study
Electricity is produced at the power station.
City of Johnston East of Merle Hay Road Infrastructure Improvements
CERN Data Centre ‘Building 513 on the Meyrin Site’
Budget specification EHN1 Extension: Infrastructure (WG2)
EN 4946 – Refurbishment of Electrical Substations
J. Seeman Assistant Director for PPA/LCLS
Far Experimental Hall - Hutches
Presentation transcript:

October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review

October, Conventional Facilities Assumptions Facilities are estimated to their beneficial occupancy approval. Utilities are estimated to the switch / manifold on the wall. The connection to technical hardware is the responsibility of individual groups. Only basic tray runs are included. ( perimeter tray in tunnels and buildings ) Utility requirements are WAG’s

October, Conventional Facilities

October, Conventional Facilities Major procurements: Racetrack tunnel with transitions to RHIC tunnel. (possible RHIC schedule issue) Service buildings with access ports to racetrack –1ea – 20x150 for cavities –1ea – 16x40 for ERL –2 ea -16x50 for bends Power –Extension of the 13.8Kv overhead line to 2:00 (new main transformer is not included) –2ea – 2 ½ MVA unit substations –1ea 13.8/4.2Kv transformers –Basic power distribution Cooling water –3 MW demineralized cooling water system –Basic water distribution Utilities –Extension of the sanitary sewer line –Utility compressed air –Domestic water –Extension of the storm drains –Network / communications ductwork

October, Estimate by phase with contingency

October, Labor hours, FTEs, $

October, Estimated Material $