Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK
Works Contract WWTP Balchik Commencement Date:28 th June 2006 Completion Date: 10 th March 2010 Physical Execution:100 % Contract Price: Euro WWTP became operational on 10 th March 2010
Taking –over of the Works and Sections of WWTP Balchik
WWTP BALCHIK Aeration tank Sludge tank
WWTP BALCHIK Main Tanks
Scroober installation at Chlorination Building WWTP BALCHIK
Balchik Water Supply& Sewerage Network Connections Works Contract ISPA Measure 2002 BG 17 P PE 017 Commencement Date: 07 th January 2008 Completion Date: 23 th December 2011 Physical Execution:100% Contract Price: Euro The Water Supply and Sewerage networks became operational on 23 th December 2011
Balchik Water Supply& Sewerage Network Connections Information boards
Balchik Water Supply&Sewerage Network Connections Main sewerage and house connections Compaction as layer on sewer line, Part III, Section F
Backdrop Manhole, Part IV, Section A Balchik Water Supply&Sewerage Network Connections Excavation on water supply main pipe, Part IV, Section A
Balchik Water Supply& Sewerage Network Connections Excavation on Water Main – G. Milev Street
Balchik Water Supply& Sewerage Network Connections Covering pipe for pressure under the Kavarna motorway
Balchik Water Supply& Sewerage Network Connections Main to Reservoir (Tsarichino) excavation
Balchik Water Supply& Sewerage Network Connections Welding activities on Tsarichino main pressure conduit