NC Phase I Perspective Steps undertaken by Charlotte for Post-Construction Controls SC Stormwater Forum May 8, 2007.

Slides:



Advertisements
Similar presentations
Goose Creek Basin Informational Meeting. Welcome Introductions Introductions Purpose Purpose Facts Facts.
Advertisements

Erosion & Sediment Control Program Steven Gucciardi, CPESC
NPDES Phase II in Wake County: Forging A Collaborative Approach to Stormwater Management APWA Conference September 19, 2005.
Charlotte-Mecklenburg Storm Water Services Welcomes ASU and the Town of Boone To Our Side of the Storm (How to manage the “perfect Storm”)
2009 City of Bozeman Storm Water Update
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
Future of the Construction and Post Construction Water Quality Program
11 Virginia Stormwater Management Regulations December 9, 2013 Va Soil and Water Conservation Districts Annual Meeting.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Upper Providence Township Stormwater Management MS4 Program.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
STORMWATER BMP MONITORING PROTOCOL Coastal Stormwater Supplement Training.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Stormwater Management University of North Carolina at Chapel Hill Sharon Myers, L.G. Environment, Health, and Safety (919)
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.
How to Do Phase II: Post-Construction Site Runoff Controls NC STATE UNIVERSITY.
COLORADO STORMWATER COUNCIL – MS4s WORKING TOGETHER Jill Piatt Kemper, PE, Sr. Environmental Engineer City of Aurora, CO (Phase I) Council Chair.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Low Impact Development and Stormwater Management in Pennsylvania Villanova Urban Stormwater Partnership – II 1 Low Impact Development.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
DC Draft Phase II Watershed Implementation Plan Stakeholder Meeting March 1, 2012 Metropolitan Washington Council Of Governments Hamid Karimi Deputy Director.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
New Boise Area MS4 Permit Boise City Council Budget Workshop August 15, 2012.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Regulatory Developments Affecting Southwest Washington Land Use in Southwestern Washington Law Seminars International Vancouver, WA February 11, 2008 Bill.
History of Stormwater Regulations in Atlanta. Prior to 1990 Protect from flooding Protect from flooding Complaint driven inspections & maintenance Complaint.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Phase II National Storm Water Regulations What’s in it for you?
From the Beginning Design Standards and Other Post-Construction Program Elements.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Resourceful. naturally. Protecting Non-Impaired Resources West Metro Water Alliance September 21, 2011 Greg Wilson, Barr Engineering Company.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Municipal Separate Storm Sewer System (MS4) Permit
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Town of Melbourne Beach
Presentation transcript:

NC Phase I Perspective Steps undertaken by Charlotte for Post-Construction Controls SC Stormwater Forum May 8, 2007

Charlotte NPDES Facts First NPDES permit in 1993 Third permit renewal being finalized Expect a 2009 deadline for Post construction controls (NC Phase II is ‘07) Over half local streams are impaired –Bacteria, turbidity/sediment, biological NC State Minimum: –Control & treat runoff from first 1-inch –30’ stream buffer on intermittent downstream

Stakeholder Involvement Multi-Objective Process Local government partnership –Mecklenburg and Charlotte, and Towns 36 meetings held over 18 months Multiple objectives considered Consensus reached Elected official decisions ongoing

Stakeholder Process Goals 1.Achieve compliance with the Phase I and Phase II minimum requirements 2.Address the concerns of NCWRC and USFWS for the Yadkin Basin –Federally endangered mussel –Affects permitting for water sewer line expansion –Slows/halts development and annexation 3.Address the causes of impairment 303d & TMDL (key for redevelopment) 4.Address detention measures for the control of storm water volumes and peaks (flooding)

Stakeholder Goal #3 – Recommendations to Address 303d Phase II minimums and NEW development Ordinance applies to redevelopment Other City priorities Areas of compromise Detention & fee-in-lieu for these redeveloping areas Balances competing objectives Impairment reversal through redevelopment

Other Unique Points of Charlotte Draft Ordinance Five watershed districts Phosphorus controls and buy-down program Detention for flooding, including downstream analysis; Also 1-yr volume City maintenance of BMP’s…

City BMP Maintenance and Preparation of Local BMP Manual Construction & maintenance is very important BMP’s built now often have problems Stakeholders/Staff agreed HOA’s are unlikely to be successful Recommended City funded maintenance of SF BMP’s Fee funded – expect 10-15% budgetary impact

City BMP Maintenance and Preparation of Local BMP Manual Charlotte monitors 20 structural BMP’s Monitoring results used to develop local BMP manual –Sizing driven by local monitoring data –Long term operation, inspection, maintenance in mind –Minimize long term costs, maximize success –Prescriptive and gives examples –Equal or better protection than NCDENR manual More info on Char-Meck website

Next Steps Outlying Towns adopt ordinance July ’07 Charlotte still looking at costs of stakeholder version of ordinance City Council to hear details of stakeholder process this summer Possible adoption by Early 2008

Daryl Hammock, PE Water Quality and Environmental Permitting Manager Charlotte Storm Water Services