Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.

Slides:



Advertisements
Similar presentations
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Advertisements

Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Michael Hopper – Structural Option AE Senior Thesis 2009 John Jay College Expansion Project New York, NY The John Jay College Expansion Project New York,
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Connections and Bracing Configurations
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Express Team University of New Mexico February 24, 2006.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Feasibility and Consequences in Staggered Truss Construction
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
George Read Hall The University of Delaware
Reading Structural Drawings
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Outline Introduction Structural Redesign Gravity System
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE

Building Introduction Existing Structure Thesis Goals Structural Depth Architectural Study Conclusion Q&A Salamanca, NY Bing Maps Wikipedia Casino Event Center Hotel Parking Deck

Project Team Building Statistics 11 stories 153 feet tall 165,000 sq. ft. (~15,000 per floor) 200 hotel rooms Ties into existing hotel tower with expansion joint Building Introduction Existing Structure Thesis Goals Structural Depth Architectural Study Conclusion Q&A Courtesy of Jim Boje, PE JCJ Architecture Owner: Seneca Gaming Corporation Architect: JCJ Architecture Structural & Civil Site: Wendel MEP: M/E Engineering P.C. CM: Seneca Construction Management Corporation

Existing Structure Typical Floor Plan (4 th floor to roof) Composite metal deck 20 gauge Normal weight concrete, f’c 3500 psi 6.5” total depth 6x6 welded wire reinforcement N JCJ Architecture

Lateral Typical Floor Plan (4 th floor to roof) N JCJ Architecture Braced frames N-S (red) Perimeter moment connections E-W (green) JCJ Architecture Courtesy of Jim Boje, PE

Foundation N JCJ Architecture N Steel piles driven to bedrock HP 12x53’s, 200 kip capacity Varying pile cap sizes Largest: 72” thick, #11 bars, 24 piles Smallest: 50” thick, #9 bars, 6 piles

Foundation N JCJ Architecture Steel piles driven to bedrock HP 12x53’s, 200 kip capacity Varying pile cap sizes Largest: 72” thick, #11 bars, 24 piles Smallest: 50” thick, #9 bars, 6 piles Outlined in red, 4 th floor and above rest on existing structure This area previously designed with new addition’s load in mind N

Building Introduction Existing Structure Thesis Goals Structural Depth Architectural Study Conclusion Q&A Structural Design and implement a staggered truss system to act as the gravity and N-S lateral system Replace metal deck with hollow-core precast concrete planks Determine preliminary member sizes then check with computer model Adjust truss members Architectural Study Trusses spanning entire width of hotel addition could impact interior spaces, requiring a look at possible redesigns of hotel rooms or overall building geometry Construction Management Study Converting to an almost completely prefabricated structural system would impact the construction process, requiring a study of the site logistics during the erection process. Advantages Remove interior columns Repetitive floor plan Faster construction Potential Disadvantages Close coordination with other disciplines Fit with existing structure

Building Introduction Existing Structure Thesis Goals Structural Depth Architectural Study Conclusion Q&A Staggered Truss AISC Design Guide 14 – Staggered Truss Framing Systems provided procedure for hand calculations Trusses encased within interior walls Central Vierendeel panel for corridor W-shape chords HSS-shape verticals and diagonals Typical truss, spanning 71.5’ addition width and 7’ central corridor Staggering of truss locations per floor, eliminating need for interior columns AISC Design Guide 14 Section of Hollow- core planks used for floor system Nitterhouse Concrete Products

Member Design All design loads were used in calculations Large live loads on certain floors required two sizes of hollow-core planks 8”, (6) ½” Ø strands, 2” topping 10”, (7) ½” Ø strands, 2” topping Truss locations Lower 4 stories have varying floor heights In order to better analyze truss members, these 4 stories and 11 th story were adjusted to be 15’ in height JCJ Architecture 17’ 13’ 15’ N

Member Design Two separate truss designs were performed in order to determine preliminary member sizes Small Truss (11’ 4” floor to floor height) Chords W10 x 33 Diagonals and Verticals HSS9 x 7 x 5/8 Large Truss (15’ floor to floor height) Chords W10 x 60 Diagonals and Verticals HSS14 x 10 x 5/8 Computer model used to check preliminary member size performance. 1.2D + 1.6L produced largest deflections Deflection limit = l/240 = 3.6” Large Truss δ = 0.85” Small Truss δ = 1.60” RAM Elements Model

Member Design Computer model used to check preliminary member size performance. 1.2D + 1.6L produced largest deflections Deflection limit = l/240 = 3.6” Large Truss δ = 0.85” Small Truss δ = 1.60” Member were checked for appropriate tension and compression stress Exterior diagonals found to take the most load as expected Top chord and verticals in compression Bottom chord and diagonals in tension RAM Elements Model

Lateral Controlling load case 1.2D + 1.6W + L H/500 at roof level = 3.7” Deflection at roof from model = 0.67” N-S direction found to be controlled by wind in Technical Report 3 Seismic was checked with model to verify RAM Elements Model

Foundation N JCJ Architecture Removal of interior columns required a foundation redesign Total amount of existing piles = 424 New pile-cap: 53” thick, 11 piles (HP 12x53) Redesign total ~ 126 Drastic reduction but existing addition designed with ASD With RAM model, all first story columns found to be in compression, thus uplift was not an issue New pile cap approximate geometry CRSI 2008 design table in appendix slides Long direction oriented N-S to better resist wind loads

N 3 rd Floor Architectural Plan JCJ Architecture Building Introduction Existing Structure Thesis Goals Structural Depth Architectural Study Conclusion Q&A VIP Suite Conflict JCJ Architecture Courtesy of Jim Boje, PE

N 3 rd Floor Architectural Plan JCJ Architecture VIP Suite Conflict To avoid truss falling within master bedroom, notched corner is squared off to hide truss within wall Squaring off corner produces extra floor space per floor 3 alternative designs for the interior space were investigated JCJ Architecture

VIP Suite Conflict A new hotel room, increasing the total amount of rooms from 200 to 211 To maintain the vestibule leading to VIP Suite, new hotel room is almost half size of existing hotel rooms, with only one bed, difficulty aligning plumbing New elevator core, only elevators servicing new addition in existing hotel ~180’ from VIP Suite Trusses alone would most likely not support a stairwell and elevators N Extra guest bedroom added to the VIP Suite, increasing overall suite and maintaining private entrance Small room again, does not add to overall hotel room amount New Hotel Room Master Bedroom Guest Rooms Master Bedroom Guest Rooms Master Bedroom Guest Rooms Elevator Core Guest Room

N JCJ Architecture NE Corner Redesign Conflict Courtesy of Jim Boje, PE JCJ Architecture Squaring off corner conflicts with existing retaining wall Demolishing retaining wall would require moving large drainage pipes Retaining Wall Drainage Pipes

Building Introduction Existing Structure Thesis Goals Structural Depth Architectural Study Conclusion Q&A Structural Staggered truss system successfully designed to resist gravity loads and wind loads in the N-S direction Precast concrete planks viable replacement for floor Reduction of piles needed for foundation Gained a better understanding of truss design Architectural Squaring off NE corner allows for truss to hide within VIP Suite wall Creates more floor space Conflict with retaining wall and drainage pipes makes this specific building not a good candidate Construction Reduction of piles would speed up schedule Prefabricated members would allow quicker erection MEP Close coordination with MEP design Truss conflicts with AHU on 3 rd floor mechanical room (appendix slide)

Courtesy of Jim Boje, PE Questions?

N

2 nd Floor Offices3 rd Floor Mechanical Room