1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.

Slides:



Advertisements
Similar presentations
Install L2 Switch Head End CATV
Advertisements

Cisco 6500 E-Series Chassis Up-grade
Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Antenna Installation. Installation Study the location antenna pattern Study the location antenna pattern Evaluate the most effective antenna in the location.
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
1 9/3/2009 PHENIX WEEKLY PLANNING 9/3/2009 Don Lynch.
CSFL upgrade – status report. Purchased parts/ spares Red and white heat shrinks, Kapton tape, flat cable, spare diodes.
Site Construction & Installation Services
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
11/10/20111 PHENIX WEEKLY PLANNING 11/10/2011 Don Lynch.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
1 8/27/2009 PHENIX WEEKLY PLANNING 8/27/2009 Don Lynch.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Cabling for LHCb Upgrade
PTC Setup at VLA B. Carlson
RV Solar Panel Installation
TileCal ROD Commissioning Counting Room Installation
Presentation transcript:

1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa

2 Schedule

3 Station-1 Scaffold Construction Completed Station-2 Scaffold underway.+2weeks? Cable trays are installed Infrastructures –Ran LV/Signal Cables Oct-5,6,7,8 –Chassis Mount –Cooling Water South Arm Installation MuTRG-FEE Racks

4 New Cable Trays

5 Chassis & ADTX-FEE Cables Completed Chassis test completed (Katsuro, Ken’ichi, Yudai, Kazufumi, Murakami) –Water leak –Dry air blow –Backplane test (1 bad) –Conductivity test ADTX-FEE cable test completed (Katsuro, Kazufumi, Seiko, Yudai)

6 Chassis Mount Installed Before Run09 Newly Mounted St-1: Octant-1,2,3,4,5 Chassis are mounted. St-2&3: Oct-1,8,7,6,5 Chassis are mounted. Modified ground cables in St-2&3 Station-1 Station-2

7 Station-1 Cabling Ran St-1 LV&Fiber Cables Yudai, Kazufumi, Seiko, Itaru

8 Trunk Cable Setup at Rackroom Patch Bay Labeling and install Trunk cable connection at back Cable guide mount for trunk cables

9 Board QA Setup ready : Ken’ichi Actually QA proceed by Yudai and Seiko